ML20003F147

From kanterella
Jump to navigation Jump to search
Forwards LER 81-009/03L-0
Date released: 01/17/2020 Download: ML20003F147


LER 81-009/03L-0:on 810317,determined That Diesel Generator 1-2A Had Been Inoperable for 35-minute Period Following Entry Into Mode 4.Caused by Personnel Error.Personnel Instructed in Proper Procedures
ML20003F150
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/13/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003F150 (2)
Forwards LER 81-009/03L-0
ML20003F146
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/13/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003F146 (1)