Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19327C002 + (ML19327C002)
- ML19327C003 + (ML19327C003)
- 05000423/LER-1989-023, :on 891006,discovered That All Hydrant Hose Houses Did Not Have Required Fire Hose Lengths to Fulfill Operability Requirements.Caused by Personnel Error & Procedural Deficiency.Operable Status Restored + (ML19327C004)
- ML19327C005 + (ML19327C005)
- ML19327C006 + (ML19327C006)
- ML19327C010 + (ML19327C010)
- ML19327C012 + (ML19327C012)
- ML19327C013 + (ML19327C013)
- ML19327C014 + (ML19327C014)
- ML19327C016 + (ML19327C016)
- ML19327C017 + (ML19327C017)
- ML19327C018 + (ML19327C018)
- ML19327C019 + (ML19327C019)
- ML19327C020 + (ML19327C020)
- ML19327C023 + (ML19327C023)
- ML19327C024 + (ML19327C024)
- 0CAN118909, Informs of Schedule for Submittal of Addl SPDS Info, Consisting of Isolation Device Failure Analysis.Results Will Be Available for Submittal by 900228 + (ML19327C026)
- ML19327C027 + (ML19327C027)
- ML19327C028 + (ML19327C028)
- ELV-01045, Responds to NRC Bulletin 88-010,Suppl 1.Util Successfully Completed Traceability Reviews on Approx 700 Breakers. Remaining Reviews Scheduled for Completion by 900102 + (ML19327C029)
- B13397, Responds to NRC Re Violations Noted in Insp Repts 50-245/89-80,50-336/89-80 & 50-423/89-80.Corrective Actions: NPRDS Task Force Created to Determine Stds of Performance & to Review Component Failure Analysis Rept + (ML19327C030)
- ML19327C032 + (ML19327C032)
- ML19327C033 + (ML19327C033)
- ML19327C035 + (ML19327C035)
- ML19327C036 + (ML19327C036)
- ML19327C037 + (ML19327C037)
- NRC-89-0222, Responds to Generic Ltr 89-07 & Suppl 1, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Short-term Actions Initiated to Protect Against Radiological Sabotage by Subj Method + (ML19327C038)
- ML19327C039 + (ML19327C039)
- ML19327C040 + (ML19327C040)
- ML19327C041 + (ML19327C041)
- ML19327C042 + (ML19327C042)
- ML19327C043 + (ML19327C043)
- 3F1189-02, Submits Supplemental Info Re Resolution of Decay Heat Pump Operation at Low Flowrates,Per Util 890615 Commitment.Util Will Establish Realistic Decay Heat Pump Low Flow Rate Operating Time Limit to Bring Plant to Safe Condition + (ML19327C044)
- ML19327C046 + (ML19327C046)
- ML19327C047 + (ML19327C047)
- ML19327C049 + (ML19327C049)
- ML19327C050 + (ML19327C050)
- ML19327C053 + (ML19327C053)
- ML19327C054 + (ML19327C054)
- ML19327C056 + (ML19327C056)
- ML19327C058 + (ML19327C058)
- ML19327C060 + (ML19327C060)
- ML19327C061 + (ML19327C061)
- ML19327C063 + (ML19327C063)
- PNO-I-89-090, on 891107,unplanned Shutdown for More than 48 H Due to Deterioration of Number 1 Reactor Coolant Pump First & Second Stage Shaft Seals.Licensee in Process of Resolving Seal Performance Problem + (ML19327C064)
- 05000301/LER-1989-005-01, :on 891006,intermediate Range High Level Trip Signal Unexpectedly Generated During Course of Routine Source Range Channel Calibr.Caused by Loose Connection of Input/Output Cable.Connection Tightened + (ML19327C065)
- 05000219/LER-1989-022, :on 891005,Tech Spec Violation Occurred When Licensed Group Shift Supervisor Left Control Room W/O Informing Operating Supervisor.Caused by Personnel Error. Individual Involved Counseled + (ML19327C066)
- ML19327C067 + (ML19327C067)
- ML19327C068 + (ML19327C068)
- ML19327C069 + (ML19327C069)
- 05000254/LER-1989-018-02, :on 891012,notification Given of Potential Single Failure of Diesel Generator Voltage Regulator That Could Result in Loss of All But One ECCS Loop.Caused by Design Deficiency.New Procedure Developed + (ML19327C070)