Text

.

Ly W t R g@v r?( c.d:s * ' ~

.l 4

2 L.::, l,Q; i l

p.

s.. j.

EJ' DuxE POWER COMPANY

[,,. 7 '

P.O. Box 03189 I

C Tj

. g, OHAh!AM TE. N.O. 98949 j

HALH.TUCKERi TELEPHOffE

/ i?- 1, vuecans.inov,

' (704) 073-4aan g

, ;. ; mum *= e==imr=.

h, dI u

LOctober,30,'1989

} ;., '..,

h Ns0 ', '

"U.'S., Nuclear' Regulatory Commission I

s

'J l0 Document ControlLDesk' 9

Wsshingtoa, D.C. -20555-2-

i.

7 m

.--a

..o Subjects. ; McGuire Nuclear._ Station i

~

.f L

Docket Nos. 50-369, 370 y ;.

H!'

1 Inspection Report Nos. 369,- 370/89-24' i=

M

Reply'to a Notice of Violation

[Gentlement' e

7-

' Pursuant to 10CFR.201, please find attached Duke Power Company's response to

-ge'0 g

. Violation 369,1370/89-24 for the McGuire Nuclear' Station.-

' ~

.i t

j Should there be any questions concerning;this matter, contact W. T. Byers at 4

(704) 373-6194 7 "hl t.

V'

. Very trulir.yours,

.c j.

y

,% ) ;

}

, h' ti>>

llal B. Tucker =

t

+

. TB126/lcs i

W

_ Attachment l i

. xc: (. Mr. S. D. Ebneter

.' Regional Administrator, Region II

,T

$ U. S. Nuclear Regulatory. Commission

.j

- 101 Marietta St., NW,: Suite 2900

..y, 1 Atlanta, Georgia 30323-5

' Mr. Darl llocd-

.m E..,;

- U. F. Nuclear Regulatory Commission P,c Office of Nuclear Reactor Regulation y

c

. Washington, D. C. 20555 Ib '

Mr. P.'K. VanDoorn NRC Resident Inspector McGuire Nuclear Station n.

ld' q

,:30s acocx osoo m

  • Af T

~

\\

.c m,..

i.

r

!A

.i.

3:~

1 l

1 McGuire Nuclear Station

c Response to Violation o

1

~.

Violation 369.370/89-24-01 D

. Licensee Technical Specification Table 6.2-1 requires a minimum u

L shift crew, when either unit is in Mode 1 through Mode 4, of one l'

shift Snpervisor, one Senior Reactor Operator, three Reactor l

Operators, three Auxiliary Operators, and one Shift Technical l

' Advisor.

NUREG 0654 states that this is the minimum shift necessar7 to assure the safe shutdown of a two-unit plant, when l

one of the plants is in an emergency. condition.

Selected Licensee Commitment (SLIC) 16.13-1, Fire Brigade, E

requires that.a Fire' Brigade of at least five members shall be maintained.onsite at all times.

The Fire Brigade members cannot include' members:of the minimum shift crew necessary for the safe shutdown of the plant.

Licensee Procedure, OMP 2-2, Shift Turnover, requires that each' shift verify that minimum shift staffing requirements and Fire Brigade staffing requirements are met.

. Contrary to the above:-

(1)

During the. periods of June 1989 to August 1989, the licensee routinely failed to follow Procedure OMP 2-2 by not properly documanting the minimum shift crew's presence.

No objective evidence exists that the Technical Specification requirements and the SLIC requirements were being met.

i (2)

Licensee Procedure OMP 2-2, Attachment la, was inadequate, in that it allowed members of the minimum shift staff to also be assigned to the Fire Brigade.

In the event'of an emergency situation involving a fire, the ability of both the Fire Brigade to respond to the fire and'the minimum shift staff to bring both units to safe shutdown may have been reduced.

This is a Severity Level IV (Supplement 1) violation.

Response

(1)

Admission or denial of the violation:

The violation is admitted.

(2)

The reason for the violation if admitted:

The violation occurred due co an inadequate administrative procedure.

Contributing to the violation was the lack of

?

.h

.1:

e s

... -,. ~ _ _.... _....

. ~......

, ~.

s...

y.-

2 a.

7 understanding by personnel of the required documentation for minimum shift crew composition, j

(3)

The corrective steps which have been taken and the results achieved.

H Operations Management Procedure (OMP) 2-2, " Shift Turnover" has been revised to clarify the requirements.

Examples of i

inadequate staffing documentation were discussed in the August Shift Supervisors' meeting, j

f" (4)- The corrective steps'which will be taken to avoid further violations:

No further actions are conhidered to be necessary.

i

(!)

Date when full compliance will'be achieved:

McGuire achieved full compliance on August 25, 1989.