ML19327C036

From kanterella
Jump to navigation Jump to search
Notification of 891117 SALP Board Meeting 89-177 in King of Prussia,Pa to Discuss SALP
ML19327C036
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/03/1989
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8911150114
Download: ML19327C036 (2)


Text

V;):(~...

4 :

j' NOV 0 31989

[

a U.S. NUCLEAR REGULATORY COMMISSION No.89-177 F

REGION I

]

NOTICE OF SIGNIFICANT MEETING j

' Licensee:'

Vermont' Yankee Nuclear Power Corporation Facility:

Vermont Yankee Nuclear Power Station Docket No.:.

50-271 L

. Time and Date:

10:00 a.m., November 17, 1989 Location:

DRP Conference Room, Region I Office, King of Prussia, PA i

Purpose':

Systematic Assessment of Licensee Performance (SALP) Board Meeting' NRC Attendees:

W. Kane, Director, Division of Reactor Projects (DRP) h W. Hodges, Director, Division of Reactor Safety (DRS)

J. Joyner, Division Project Manager for Special Projects, Division of Radiation Safety and Safeguards (DRSS) i D. Wessman, Director, Project Directorate.,I-3,'NRR J. Johnson, Chief, Projects Branch No. 3, DRP R. Gallo,: Chief, Operations Branch, DRS J. Durr,z Chief, Engineering Branch, DRS s

R. Bellamy, Chief, Facilities Radiological Safety and Safeguards' Branch, DRSS.

R. Blough, Chief, Reactor Projects Section 3A, DRP M. Fairtile, Project Manager, PD I-3, NRR G. Grant, Senior Resident Inspector J..Macdonald, Resident Inspector Note: Attendance by NRC personnel at this meeting should be made known by 4:00.p.m., November 15, 1989 via telephone call to A. Randy Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.

b AN h E

E Prepared by:

A. Randy Blough, Chief, RPS 3A i

1 p,

L eglihck pbh o

['

L OFFICIAL RECORD COPY LIC MTG NOTICE 89-177 - 0001.0.0 10/30/89 l

' 0 l

.y

~

a

'V L..

2

,MV g g y L

Distribution:-

J. M. Taylor, Acting Executive Director for Operations Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. Thompson, Deputy Executive Director for Materials Safety, Safeguards and Operations Support B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, HRR S. Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR l

R. Wessman, Director, Project Directorate I-3, NRR V. Rooney, Project Manager, PD I-3, NRR J. Dyer, Regional Coordinator, EDO

?

Public Document Room (PDR)

Local Public Document Room (LPDR)

State of Vermont State of New Hampshire NRC Resident Inspector i

bec:

Regional Administrator Deputy' Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

J. McGrath, RI M. Miller, RI J. Gutierrez, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J. D1Donato, DRP y C RI:DRP RI:DRP olonauski/meo B1 h

10/30/89 s

4 0FFICIAL RECORD COPY LIC MTG NOTICE 89-177 - 0002.0.0 10/30/89