- ML19325D445 + (ML19325D445)
- ML19325D446 + (ML19325D446)
- ML19325D447 + (ML19325D447)
- ML19325D448 + (ML19325D448)
- ML19325D449 + (ML19325D449)
- ML19325D450 + (ML19325D450)
- ML19325D452 + (ML19325D452)
- B13322, Informs of Current Shutdown Schedule & Provides Anticipated Scope & Acceptance Criteria for mid-cycle Steam Generator Eddy Current Testing Insp,Per NRC + (ML19325D454)
- ML19325D455 + (ML19325D455)
- ML19325D456 + (ML19325D456)
- ML19325D458 + (ML19325D458)
- IR 05000260/1989039 + (ML19325D459)
- 05000334/LER-1989-022, :on 890919,determined That Current Max Setpoint Temp for Rod Control Sys Nonconservative W/Respect to Plant Safety Analysis.Caused by 1976 Util/Vendor Miscommunication. Setpoint Changed to Fit Safety Analysis + (ML19325D461)
- ML19325D462 + (ML19325D462)
- ML19325D463 + (ML19325D463)
- 05000277/LER-1989-021-01, :on 890920,control Room Emergency Ventilation Actuation Occurred Due to False High Radiation Signal.Cause Unknown.Wire Connections to Terminal Strip Verified to Be Tight + (ML19325D464)
- ML19325D465 + (ML19325D465)
- 05000293/LER-1989-029, :on 890914,locked High Radiation Area Door Found to Have Been Unsecured Contrary to Tech Spec 6.13.2. Caused by Failure to Adhere to Approved Procedures. Training on Access Requirements Initiated + (ML19325D468)
- ML19325D469 + (ML19325D469)
- ML19325D470 + (ML19325D470)
- ML19325D471 + (ML19325D471)
- ML19325D472 + (ML19325D472)
- ML19325D474 + (ML19325D474)
- ML19325D475 + (ML19325D475)
- ML19325D476 + (ML19325D476)
- ML19325D477 + (ML19325D477)
- ML19325D479 + (ML19325D479)
- ML19325D480 + (ML19325D480)
- ML19325D481 + (ML19325D481)
- ML19325D482 + (ML19325D482)
- ML19325D484 + (ML19325D484)
- 05000456/LER-1989-010-04, :on 890915,measured Leakrate of Hydrogen Analyzer Containment Isolation Valve Was Larger W/Valve Indicating Closed.Caused by Incorrect Labeling of Coil Leads.Valve Replaced W/Different Model Valve + (ML19325D485)
- IR 05000295/1989031 + (ML19325D486)
- ML19325D487 + (ML19325D487)
- ML19325D489 + (ML19325D489)
- 05000282/LER-1989-017-01, :on 890914,discovered That Present Position of Transfer Switch for Power Supplying Control & Protection Relays for Diesel Generator Does Not Meet Requirements of App R.Caused by Inadequate Procedures + (ML19325D490)
- ML19325D491 + (ML19325D491)
- ML19325D492 + (ML19325D492)
- 05000458/LER-1989-033, :on 890916,electrical Power Lost to Div II 120 Volt Ac Distribution Panel,Resulting in auto-start of Div II Standby Gas Treatment & Annulus Mixing Sys.Caused by Failure of Elgar Power Line Conditioning Transformer + (ML19325D493)
- 05000348/LER-1989-004-01, :on 890616,determined That Calculations Were Not Available to Demonstrate That Svc Water Sys Capable of Supplying Design Flow to safety-related Loads Under Scenario of Seismic Event + (ML19325D494)
- ML19325D495 + (ML19325D495)
- ML19325D496 + (ML19325D496)
- ML19325D498 + (ML19325D498)
- 05000369/LER-1989-027, :on 890915,preheaters Did Not Start Because Air Flow Permissive Was Not Made & Cross Connect Dampers Were Closed & Tagged & Ventilation Sys Train a Remained Logged Inoperable.Caused by Design Deficiency + (ML19325D499)
- 05000353/LER-1989-007-03, :on 890920,unit Placed in Startup Operating Condition W/Rhr Subsystem B in Shutdown Cooling Mode Rather than LPCI Mode.Caused by Procedure Noncompliance Due to Personnel Error.Individual Counseled + (ML19325D500)
- 05000344/LER-1989-010, :on 890916,auxiliary Feedwater Pumps Automatically Started.Caused by Personnel Error in Not Following General Operating Instruction GOI-3 Procedure. Responsible Individual Counseled.Signal Reset + (ML19325D503)
- ML19325D504 + (ML19325D504)