Text
,.
- ~ - - - - - - -,
4f lj.-
o.
l j
- po te es UNITED STATES
)
[
',h NUCLEAR REGULATORY COMMISSIOfJ l
5 I
WASHING TON. D. C. 29665
)
FLORIDA POWlR CORPORATION
)
0; TY Of ALAGNUA C. 'T OF l'U5MNE.
CI'T OF GA ht5VI.L E l
C TY OF K' 55' Pg4 A l
C; TY QF L4 ;5%'Rij j
CITY OF NEW $MYRNA BEACH AIO u'rI TI ;5 40 W3510N. CITY OF NEW SMYRNA BEACH i
C. T JF QUAUi
)
ORLAE0 UTILIT: CS cVwsTEch A m CITY OF ORLANDO 5;5R IE UT.
T
- 5 Corri 5510N l
$EMINQL, Eth C gogPERA VE. INC.
l LITT QF TALLAMA55LF 1
DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT i
AMENDMENT TO FACILITY OPERATING LICENSE m
)
Amentent No.123 License No. OPR-72 i
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power Corporation, et al.
l (the licensees) dated August 9,1989, coglies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
i ar.d the Cossiission's rules and regulations set forth in 10 CFR Chapter I; l
B.
The facility will operate in conformity with the application, the i
provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted wittout endangering the health and 1
safety of the public, and (ii) that such activities will be conducted in compliance with the Commission't. regulations; D.
The issuance of this amendment will not be inia;ical to the comon owfense and security or to the health and safety of the public; and E.
The issuance of this amantient is in accordance with 10 CFR Part 51 I
of the Commission's regulations and all applicable requirenarnts have l
been satisfied.
1 8910240226 E:91017 PDR ADOCK 05000302 P
FDC l'
i
i I
! i 2.
Accordingly, the license is anended by changes to the Technical l
Specificatfons as indicated in the attacht.ent to this license asentent, i
and paragraph 2.C.(2) of facility Operating License No. DPR-72 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contaire4 in Apperdices A and B, ac revised through Amendment No.123, are hereby incorporated in the license.
Florida Power Corporation shall operate the facility in i
accordance with the Technical Specifications.
3.
This license anendment is effective as of its date of issuance.
f FOR TH NUCLEAR REGULATORY COMMISSION j
). $
.s w
/
He ert N. Berkow, Director
[
Project Directorate 11-2 Division of Reactor Projects - 1/II Offics of huclear Reactor Regulation Attachwant:
Changes to the Technical Specifications Date of Issuance: October 17, 1989 l
-..n,-.
a.,
-- )
ATTACHMENT TO LICENSE AMENOM[NT NO.123 FACILITY OPERATikG LICENSE N0. DPR-72 DOCKET NO. 50-302 f
)
Replace the folicwing pages of the Appendix "A" Technical Specifications with the attached pages.
The revised pages are identified by anendment number and contain vertical lines indicating the area of ch.nge.
The corresponcing i
overleaf pages are also provided to maintain document completeness.
komove Insert j
3/4 8-5 3/4 8 5 3/4 8 6c 3/4 8-6c i
h e
f
p
--g I
a l.
i ELE $TRif.AL 20ER SYSTDtl i
$URVE!LLANCE REQUIREMENTS (Continued)
{
2.
Verifying the generator capability to reject a load of 2 515 kw without tripping.
j
- 3.
Simulating a loss of offsite power in conjunction with Reactor Building high pressure and Reactor Building high high pressure tests signals, ands l
a)
Verifying de energitation of the emergency buses and load shedding i
from the emergency busses, j
b)
Verifying that the 4160 v. emergency bus tie breakers open,
{
c)
Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency busses with permanently i
connected loads, energizes the auto connected emergency loads through the load sequencer, and operates for 1 5 minutes while its generator is loaded with the emergency loads.
"4.
Verifying the diesel generator operates for at least 60 minutes.
During the first 5 minutes but no greater than 6 minutes of this test I
the diesel generator shall be loaded to greater than or equal to 3248 L
kw but less than 3300 kw and during the remaining time of this 60 l
minute test, the diesel generator shall be loaded to greater than or equal to 2750 kw but less thar 3000 kw, i
"5.
Verifying that the auto connected loads to each diesel generator for l
l the worst case diesel generator operating condition do not exceed 3248 kw, and i
l 6.
Verifying that the automatic load sequence timers are OPERABLE with each load sequence, time interval within i 10%.
This test shall be perfonned in MODE 3 These revised requirements shall apply only until the end of Cycle VII.
The specified 18 month frequency may be waived until the end of Cycle Vll.
CRYSTAL RIVER UNIT 3 3/4 8 5 Amendment No.123 i
e m,
,,,-r,-,,,-
a.w----,-
c-n,,,,_----e,,-
m.
P i
I.
I ELECititAL Mad [i SYSTENE SURVEILLANtt kt0UIREMENTS f tentinued) s i
- 3.
Simulating a loss of offsite power in con. junction with Reactor Buildiig i
high pressure and Reactor Building high high pressure tests signalt, and a)
Verifying de energization of the emergency buses and load shedding l
from the emergency buses, b)
Verifying that the 4160 v. emergency bus tie breakers open, i
c)
Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency buses with permanently connected lo&ds, energizes the auto connected emergency loads i
through the load sequencer, and operates for 15 minutes while l
its generator is loaded with the emergtney loads.
"4.
Verifying the diesel generator operates for at least 60 minutes.
During the first 5 minutes but no greater than 6 minutes of this teet.
l t
the diesel generator shall be loaded to greater than or equal to 3248 kw but less than 3300 kw and during the remaining time of this 60 t
minute test, the diesel generator shall be loaded to greater than or equal to 2750 kw but less than 3000 kw, i
"S.
Verifying that the auto connected loads to each diesel generator for i
i the worst case diesel generator operating condition do not exceed 3248 kw, and i
6.
Verif ing that the automatic load sequence timers are OPERABLE with each 04d sequence time interval within i 10%.
i This test shall be performed in MODE 3.
These revised requirements shall apply only until the end of Cycle Vll.
{
The specified 18 month frequency may be waived untti the end of Cycle Vll.
l CRYSTAL RIVER UNIT 3 3/4 8 6c Amendment No.123
)
1