Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325D153 + (ML19325D153)
- ML19325D154 + (ML19325D154)
- ML19325D155 + (ML19325D155)
- PY-CEI-NRR-1079, Forwards LERs 88-025-01 & 89-026-00 + (ML19325D156)
- ML19325D157 + (ML19325D157)
- 05000440/LER-1989-026, :on 890913,reactor Thermal Power Level Exceeded That Specified in OL Due to Unexpected Recirculation Sys Flow Control Transient.Caused by Component Failure.Failed Isolation Solenoid Valve Replaced + (ML19325D159)
- ML19325D160 + (ML19325D160)
- ML19325D162 + (ML19325D162)
- ML19325D164 + (ML19325D164)
- ML19325D165 + (ML19325D165)
- ML19325D167 + (ML19325D167)
- 05000259/LER-1989-026, :on 890912,determined That Fuel Oil Quality for All 7-day Storage Tanks for Diesel Generators Should Be Sampled Once Monthly.Caused by Tech Specs Misinterpretation. Surveillance Instruction Procedure Revised + (ML19325D168)
- ML19325D169 + (ML19325D169)
- 05000325/LER-1989-019, :on 890914,determined That Svc Water Sys May Not Have Met Design Requirements Under Certain worst-case Conditions.Caused by Failure of Startup Testing to Detect Inadequacies.Assessment of Event Initiated + (ML19325D171)
- ML19325D172 + (ML19325D172)
- ML19325D174 + (ML19325D174)
- ML19325D178 + (ML19325D178)
- AECM-89-0190, Monthly Operating Rept for Sept 1989 for Grand Gulf Nuclear Unit 1 + (ML19325D179)
- ML19325D180 + (ML19325D180)
- ML19325D181 + (ML19325D181)
- ML19325D182 + (ML19325D182)
- ML19325D183 + (ML19325D183)
- ML19325D184 + (ML19325D184)
- ML19325D185 + (ML19325D185)
- 05000293/LER-1989-028, :on 890907,HPCI Sys Declared Inoperable Because Mechanical Overspeed Trip Occurred During Surveillance Test. Caused by Failure of Ramp Generator Signal Converter Module. Module Removed & Sent to Mfg for Exam + (ML19325D186)
- ML19325D188 + (ML19325D188)
- IR 05000424/1989024 + (ML19325D189)
- ML19325D193 + (ML19325D193)
- ML19325D194 + (ML19325D194)
- 3F1089-06, Monthly Operating Rept for Sept 1989 for Crystal River Unit 3 + (ML19325D195)
- ML19325D196 + (ML19325D196)
- ML19325D197 + (ML19325D197)
- ML19325D198 + (ML19325D198)
- ML19325D199 + (ML19325D199)
- NMP2L2713, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Increase Allowable MSIV Leakage Rates + (ML19325D201)
- ML19325D202 + (ML19325D202)
- ML19325D203 + (ML19325D203)
- ML19325D204 + (ML19325D204)
- ML19325D205 + (ML19325D205)
- ML19325D206 + (ML19325D206)
- ML19325D207 + (ML19325D207)
- PY-CEI-NRR-1076, Monthly Operating Rept for Sept 1989 for Perry Nuclear Plant Unit 1,per Tech Spec 6.9.1.8 + (ML19325D209)
- ML19325D210 + (ML19325D210)
- ML19325D212 + (ML19325D212)
- ML19325D213 + (ML19325D213)
- ML19325D218 + (ML19325D218)
- ML19325D219 + (ML19325D219)
- ML19325D222 + (ML19325D222)
- IR 05000416/1989021 + (ML19325D223)
- ML19325D225 + (ML19325D225)
- ML19325D226 + (ML19325D226)