p
OCT 12 1989
-
F
Docket No. 50-333
'
New York' Power Authority
' James A~. FitzPatrick Nuclear Power Plant'
v.'
ATTN: Mr. William Fernandez
-
L
Resident Manager
Post Office Box 41
o
L
' Lycoming, New York 13093
1-
F
Subject:
NRC Region I Inspection Report No. 50-333/89-09
L
h
This -letter transmits the results rf the routine inspection conducted _ by
,
- Messrs.
W. Schmidt and. R. Plasse of this office on July 30,1989 through
September 6' 1989, at the James A. FitzPatrick Nuclear Power plant, Scriba, New
,
.
York. Mr.:Schmidt discussed the inspection findings with you and other members.-
-
of_your staff at;the conclusion of the inspection.
1
,,
The performance of your senior reactor operators (shift supervisors, assistant '
shift supervisors and work control center supervisors) is of_ utmost importance
and a major factor in the safety of reactor operations. Our inspectors found
two ' instances when the performance of these senior reactor operators (SR0s) was
'
not up to the high standards of professionalism expected.
Specifically, _ once
' both on shift SR0s were taking a break at the same time in an area adjacent to
but=outside of the controls area'. Secondly, the shift supervisor did not. for-
mally: enter the applicable Technical Specification Limiting Conditions for
Operation -(LCO), despite recognizing the potential inoperability of the standby
gas treatment (SBGT) system and taking action to correct it.
In both -instances we conclude that there was no direct adverse impact on the
'
safety.of your reactor operations and the technical significance was minimal.
However, the professionalism of operators is a matter of great significance to
the NRC. Accordingly, we request that you address these issues in. a written
response.- Please include the corrective actions you have taken and the long
term actions you plan to ensure that SRO performance maintains a high standard
of professionalism.
- We appreciate your cooperation.
Sincerely,
James T. Wiggins, Chief
Reactor Projects Branch No. 1
Division of Reactor Projects
/
OFFICIAL RECORD COPY IR FITZ 50-333/89-09 - 0001.0.0
'
i
10/06/89
8910190212 891012
ADOCK 05000333
O
,
,
. - .
.
-
-
.-.
-
p
-
4
' ..
,.
'[
.
-
.
'
New Ycrk Power Authority
2
.;'
Enclosure:
NRC Region I Inspection Report Number 50-333/89-09
cc w/ enc 1:
President
J. C. Brons, Executive Vice. President-Nuclear Generation
'
R. E. Beedle, Vice President Nuclear Support
S. S. Zu11a, Vice President' Nuclear Engineering
A. Klausmann, Senior Vice President-Appraisal ar.d Compliance Services
R. L. Patch, Quality Assurance Superintendent
G. H. Wilverding, Manager, Nuclear Safety Evaluation
!
G. C. Goldstein, Assistant General Counsel
!
Department of.Public Service, State of New York
State of New York . Department of Law
c
-Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
'
- bec.w/ enc 1:
"
Region I Docket Room (with concurrences)
ManagementAssistant,.DRMA(v/oenc1)
J. Wiggins, DRP
0. Limroth, DRP
G. Meyer, DRP
R. Barkley,'DRP
M. Miller, SLO
D. LaBarge, NRR
.
R. Kiessel, NRR
J. Dyer, E00
W.. Cook, SRI - Nine Mile 1 and 2
'P. Koltay, SRI - Indian Point 3
!
RI:DRP
HI:DRP
RIj DRP .-
WSchmidt/mjd
GMeyer
JW)
ir s
L
10/(p/89
y
10/4/89
10410 /89
k
0FFICIAL RECORD COPY IR FITZ 50-333/89-09 - 0002.0.0
l
g/
10/06/89
_
. . . . .