- ML19324B307 + (ML19324B307)
- ML19324B309 + (ML19324B309)
- ML19324B310 + (ML19324B310)
- U-601549, Responds to Generic Ltr 88-20,Suppl 1, Initiation of Individual Plant Exam for Severe Accident Vulnerabilities. Individual Plant Exam Initiated on 890701 & Results Expected to Be Submitted by Sept 1992 + (ML19324B313)
- ML19324B314 + (ML19324B314)
- ML19324B315 + (ML19324B315)
- ML19324B318 + (ML19324B318)
- ML19324B319 + (ML19324B319)
- ML19324B320 + (ML19324B320)
- ML19324B321 + (ML19324B321)
- ML19324B323 + (ML19324B323)
- ML19324B325 + (ML19324B325)
- IR 05000160/1989005 + (ML19324B327)
- ML19324B328 + (ML19324B328)
- AECM-89-0196, Forwards Rev 2 to Emergency Preparedness Transition Plan. Plan Originally Submitted as Info to Support Review of Amend + (ML19324B330)
- ML19324B332 + (ML19324B332)
- ML19324B334 + (ML19324B334)
- ML19324B337 + (ML19324B337)
- ML19324B347 + (ML19324B347)
- ML19324B350 + (ML19324B350)
- ML19324B356 + (ML19324B356)
- ML19324B357 + (ML19324B357)
- ML19324B358 + (ML19324B358)
- ML19324B361 + (ML19324B361)
- ML19324B363 + (ML19324B363)
- ML19324B366 + (ML19324B366)
- IR 05000285/1989034 + (ML19324B369)
- ML19324B370 + (ML19324B370)
- ML19324B379 + (ML19324B379)
- ML19324B380 + (ML19324B380)
- ML19324B382 + (ML19324B382)
- ML19324B385 + (ML19324B385)
- 05000302/LER-1989-034, :on 890926,two Conditions Determined to Be Outside Plant Design Basis Re Solenoid Control Valves.Caused by Cognitive Personnel Error.Test Solenoid Valve Circuits Provided W/Isolation Fuses + (ML19324B387)
- ML19324B390 + (ML19324B390)
- ML19324B396 + (ML19324B396)
- ML19324B398 + (ML19324B398)
- ML19324B404 + (ML19324B404)
- ML19324B407 + (ML19324B407)
- 05000413/LER-1989-025-02, :on 890922,13.8 Kv Auxiliary Switchgear Deenergized Resulting in Loss of Power to Condenser Circulating Water Cooling Tower Fans.Power Reduction Due to Hurricane Hugo + (ML19324B409)
- ML19324B412 + (ML19324B412)
- BSEP-89-0971, Followup Ro:On 890422,limiting Condition for Operation Initiated Re Two Inoperable Fire Barrier Seals in Common Augmented Offgas Bldg.Caused by Corrosion in Base Metal Hatch.Replacement Parts Obtained to re-establish Operation + (ML19324B421)
- ML19324B428 + (ML19324B428)
- 05000324/LER-1989-008, :on 890605,unplanned LOCA Initiation Signal Occurred During Routine Maint Surveillance Testing of ECCS, Resulting in Autostarting of Core Spray a & B & RHR LPCI Pumps A,B,C & D.Caused by Spurious Trip + (ML19324B431)
- ML19324B432 + (ML19324B432)
- ML19324B434 + (ML19324B434)
- ML19324B436 + (ML19324B436)
- ML19324B437 + (ML19324B437)
- 0CAN108919, Forwards Supplemental Info Re 890815 Applications for Amends to Licenses DPR-51 & NPF-6,concerning Antitrust Considerations.Sys Agreement Provides for Coordination on sys-wide Basis of Operation of Stated Facilities + (ML19324B438)
- ML19324B439 + (ML19324B439)
- ML19324B440 + (ML19324B440)
- ML19324B442 + (ML19324B442)