Forwards Amends 124,35 & 144 to Licenses DPR-61,DPR-21 & DPR-65,respectively & Safety Evaluation.Amends Revise Tech Specs Sections 6.12 & 6.13 Re High Radiation Area
ML19324B380
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 10/24/1989
From: Stolz J
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19324B381 List:
References
TAC-73044, TAC-73045, TAC-73046, NUDOCS 8911060179
Download: ML19324B380 (4)


Text

,

l October 24, 1989 D'ocket Nos. 50-213, 50-245

' oc;e.' M"g M#

t lind 50-336 DHagan NRC & Local PDRs EJordan Mr. Edward J. Mroczka PDI-4 Rdg.

TMeek(12)

Senior Vice President SYarge Wanda Jones Nuclear Engineering and Operations BBoger JCalvo Connecticut Yankee Atomic Power Company JStolz ACR$(10)

Northeast Nuclear Energy Company SNorris GPA/PA P. O. Box 270 GVissing OG/LFMB Hartford, Connecticut 06141-0270 MBoyle AWang

Dear Mr. Mroczka:

SUBJECT:

IS!UANCE OF AMENDMENT (TAC N05. 73044, 73045 AND 73kO6) l The Connission has issued the enclosed An=ndment Nos.124, 35,and 144 to Facility Operating License Nos. DPR-61. DPR-21 and DPR-65 for the Haddam Neck Plant and Millstone Nuclear Power Station, Units 2 and 2 respectively.

These amendments are in response to your application dated April 25, 1989, as supplemented June 26, 1989.

c The amendments revise the Technical Specifications (TS) Sections 6.12. "High Radiation Area," for Haddam Neck and Millstone Unit 2 lants and TS Section 6.13, "High Radiation Area," for Millstone Unit 1 plant by)( ) defining the dose rate as measured at 45 cm (18 inches) from the source. (2 increasing the Radiation L

Work Permit requirements for entry into locked High Radiation areas with dose rates greater than the 1000 mR/h by requiring maximum stay time limits or con-tinuous surveillance, (3) allowing an alternative to enclosing and locking large areas with dose rates greater than 1000 mR/h and in which an enclosure cannot be reasonably constructed and (4) defining locked High Radiation areas as those with dose rates greater than 1000 mR/h at 18 inches from the radiation source.

A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Consnission's bi-weekly Federal Register notice.

Sincerely, i

/s/

3911060179 891024 ADOCK 050 g 3 John F. Stolz, Director PDR P

Project Directorate 1-4 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Pegulation

Enclosures:

1.

Amendment No. 124 to DPR-61 2.

Amendment No.

35 to DPR-21 g

3.

Amendment No.

44 to DPR-65 f

4.

Safety Evaluat on cc w/ enclosures:

See next page

' h~

OGC

[ AMEND 73044/45/46]

i L PDI-4 PM: [

PM:PDI PM:PDI-4 P,

D.P 4 S

s -

G ng MBoyle AWangW Lu ingham

/fwl JSto' 0%0/89 0 /S//89

($/L/89 g/v/89 60

/

8 8/g89

W l

I

' ' [

'h

-d UMTfDsYATEs NUCLEAR REGULATORY COMMISSION j

a r

a wasswovow. o. c. rosos j

.h,'

October 24, 1989 l

Docket Nos. 50-213, 50 245 I

and 50-336 l

Mr. Edward J. Mrocr ha Senior Vice President l

Nuc1 var Engineering and Operations l

Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company j

P. O. Box 270 Hartford, Connecticut 06141-0270 l

Dear Mr. Mrotzka:

j

SUBJECT:

ISSUANCE OF AMENDHENT (TAC NOS. 73044,73045AND73406)

The Commission has issued the enclosed Amendment Nos.124,for the Hadcam Neck 35, and 144 to i

Facility Operating License Nos. DPR-61 DP l

Plant and Millstone Nuclear Power Station,R-21 and DPR-65 Units 1 and 2 respectively:

amendments.are in response to your application dated April 25, 1989, as L

supplemented June 26, 1989.

l 1

l The amendments revise the Technical Specifications (TS) Sections 6.12. "High Radiation Area," for Haddam Neck and Millstone Unit 2 p)lants and TS Section 6.13, as masured at 45 cm (18 inches) from the source. (y)(1 "High Radiation Arts," for Millstone Unit 1 plant b defining the dose rate 2 increasing the Radiation

{

l-Work Permit requirements for entry into locked High Radiation areas with dose

)

l-rates greater than the 1000 mR/h by requiring maximum stay time limits or con.

l tinuous surveillance, (3) allowing an alternative to enclosing and locking large l

areas with dose rates greater than 1000 mR/h and in which an enclosure cannot be f

reasonably constructed and (4) defining locked High Radiation areas as those with l

dose rates greater than 1000 mR/h at 18 inches from the radiation source.

The Notice of A copy of the related Safety Evaluation is also enclosed.

l Issuance will be included in the Commission's bi-weekly Federal Register notice.

Sincerely, G

9dr /.

Joh F. Stolz, Director b Prto ct Directorate I-4 Div ion of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No.124 to DPR-61 2.

Amendment No. 35 to DPR-21 3.

Amendment No. 344 to DPR-65 4

Safety Evaluation CC W/ enclosures:

See next page

Mr. Eevard J. Mroczka Haddam Neck & Millstone Nuclear fewer l

Northeast Nuclear Energy Company Station Unit Nos. 1, 2 & 3 cc:

i Gerald Garfield, Esquire R. M. Kacich, Manager t

Day, Berry and Howard Generation Facilities Licensing i

Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270

[

W. D. Ronterg, Vice President D. O. Nordquist i

Nuclear Operations Manager of Quality Assuranco Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regical Administrator Radiation Control Unit Region !

Department of Environwntal Protection U. S. Nuclear Regulatory Comission i

State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 j

Bradford S. Chase, Under Secretary First Selectmen l

Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o V. S. Nuclear flegulatory Commission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Unit Superintendent M. R. Scully, Executive Director Millstone Unit No. 3 Connecticut Municipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 30 Stott Avenue i

Waterford, Connecticut 06385 Norwich, Connecticut 06360 l

l Ms. Jane Spector Michael L. Jones, Manager l

Federal Energy Regulatory Commission Project Management Department l

825 N. Capitol Street, N.E.

Massachusetts Municipal Wholesale Room 860BC Electric Company Washington, D.C.

20426 Post Office Ecx 426 Ludlow, Massachusetts 01056 Burlington Electric Department c/o Robert E. Fletcher, Esq.

271 South Union Street Burlington, Vermont 05402 l

l l*

?

2 Mr. Edward J. Mroczka Haddam Neck & Millstone Nuclear Power Northeast Nuclear Energy Company Station Unit Nos. 1, 2 & 3 J. P. Stetz, Unit Superintendent J. S. Keenan, Unit Superintendent Millstone Unit No.1 Millstone Unit No. 2 Northeast Nuclear Energy Company Northeast Nuclear Energy Company Post Office Box 128 Post Office Box 128 Waterford, Connecticut 06385 Waterford, Connecticut 06385 Charles Brinknan, Manager Board of Selectmen l

Washington Nuclear Operations Town Hall C.E Power Systems Hacdam, Connecticut 06103 Combustion Engineering, Inc.

1 12300 Twinbook Pkwy J. T. Shedlosky, Resident Inspector Suite 330 Haddam Neck Plant Rockville, Maryland 20852 c/o U. S. Nuclear Regulatory Comission Post Office Box 116 East Haddam Post Office D. B. Miller, Station Superintendent East Haddam, Connecticut 06423 Haddam Neck Plant Connecticut Yankee Atomic Power Company RfD 1, Post Office Box 127E East Hampton, Connecticut 06424 G. H. Bouchard, Unit Superintendant Haddam Neck Plant RFD #1 Post Office Box 127E i

East Hanpton, Conr.ecticut 06424