Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted + (ML19323J224)
- ML19323J225 + (ML19323J225)
- ML19323J226 + (ML19323J226)
- 05000259/LER-1980-044, Forwards LER 80-044/01T-0 + (ML19323J227)
- ML19323J228 + (ML19323J228)
- 05000259/LER-1980-044-01, /01T-0:on 800602,while Reviewing Instrument Buses Per IE Bulletin 79-27,failure of 250 Volt Dc Battery Board Determined to Cause Feedwater Flow to Increase to Full Flow & Disable Feed Pump Trips.Caused by Power Nonseparation + (ML19323J229)
- ML19323J231 + (ML19323J231)
- ML19323J232 + (ML19323J232)
- ML19323J233 + (ML19323J233)
- ML19323J234 + (ML19323J234)
- ML19323J235 + (ML19323J235)
- ML19323J236 + (ML19323J236)
- ML19323J237 + (ML19323J237)
- ML19323J238 + (ML19323J238)
- ML19323J239 + (ML19323J239)
- ML19323J240 + (ML19323J240)
- 05000321/LER-1980-054, Forwards LER 80-054/01T-0 + (ML19323J241)
- ML19323J242 + (ML19323J242)
- ML19323J243 + (ML19323J243)
- ML19323J244 + (ML19323J244)
- ML19323J245 + (ML19323J245)
- 05000321/LER-1980-054-01, /01T-0:on 800529,while Repairing RHR Inboard Injection Valve,Engineering Staff Confirmed That Cable Separation Problem Existed Re Containment Atmospheric Control Sys.Caused by Design & Installation Error + (ML19323J246)
- AECM-80-128, Deficiency Rept (PRD-80/26) Re GE Type SB-12 Switches. Questions Rationale That Safety Function of Breaker Was to Trip on Signal from Reactor Protection sys.Re-evaluation Will Be Conducted & Final Rept Filed by 800710 + (ML19323J247)
- 05000321/LER-1980-051, Forwards LER 80-051/03L-0 + (ML19323J248)
- ML19323J249 + (ML19323J249)
- ML19323J251 + (ML19323J251)
- ML19323J252 + (ML19323J252)
- ML19323J253 + (ML19323J253)
- ML19323J254 + (ML19323J254)
- 05000321/LER-1980-051-03, /03L-0:on 800514,while Investigating Tubing Layout,Run of Tubing That Tapes Into Primary Containment Not Supported Seismically as Required.Caused by Installation Error.Tubing Will Be Resupported Per Seismic Specs + (ML19323J255)
- ML19323J256 + (ML19323J256)
- ML19323J257 + (ML19323J257)
- 05000321/LER-1980-052, Forwards LER 80-052/03L-0 + (ML19323J258)
- ML19323J259 + (ML19323J259)
- ML19323J260 + (ML19323J260)
- ML19323J261 + (ML19323J261)
- ML19323J262 + (ML19323J262)
- 05000321/LER-1980-052-03, /03L-0:on 800520,during Unit Startup,Hpci Pump Was in Progress Prior to Declaring HPCI Operable.Caused by Defective Ramp Generator on Woodward Turbine Controls.Ramp Generator & Egm Control Box Replaced + (ML19323J263)
- ML19323J264 + (ML19323J264)
- ML19323J265 + (ML19323J265)
- ML19323J266 + (ML19323J266)
- ML19323J268 + (ML19323J268)
- ML19323J269 + (ML19323J269)
- ML19323J270 + (ML19323J270)
- ML19323J273 + (ML19323J273)
- ML19323J275 + (ML19323J275)
- ML19323J276 + (ML19323J276)
- ML19323J277 + (ML19323J277)
- ML19323J279 + (ML19323J279)
- ML19323J281 + (ML19323J281)
- ML19323J282 + (ML19323J282)