ML19323J264

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1980
ML19323J264
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/02/1980
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML19323J262 List:
References
NUDOCS 8006190621
Download: ML19323J264 (3)


Text

- ?*

ui OPERATING DATA REPORT DOCKET NO. _50-302 DATE _6/2/80 CO.\\lPLETED IW _ M. W.

Culver TELEPliONE (904)795-6486 OPERATING STATUS

! Unit Name:

Crystal River Unit 3 N"

~

2. Reporting Period: 5/1/80 - 5/31/80
3. Licensed Thennal Power (51Wt): 2452
4. Nameplate Rating (Gross N!We):

890

5. Daign E!cetrical Rating (Net 51We):

825 821

6. Slasimum Dependable Capacity (Gross SIWE):

2

7. Slaximum Dependable Capacity (Net 51We):
h. If Chan;es Occur in Capacity Ratings (!! ems Number 3 Through 7J Since Last Report. Gise Reasons:
9. Power Lesel To which Restricted.lf Any (Net 51We):

"one

10. Reasons For Restrictions. If Any:

This 5f onth Yr.-to.Date Cumulatise

11. Ilours In Reporting Period 744 3647 28223
12. Number Of Ifours Reactor was Critical 0

1305.5 16455.8

13. Reactor Resene Shutdown Hours 0

0 1116.9 I4. Ifours Generator On.Line 0

1297.4 15997.6

15. Unit Resene Shutdown llours 0

0 o

0

16. Gross Thermal Energy Generated (5thlf) 3085927 35402838
17. Grow Electrical Energy Generated (%!WH) 0 1058396 12030164
15. Net Electrical Energy Generated (51WH) 0 1009335 11400975
19. Unit Senice Factor 0

35.6%

56.7%

20. Unit Asailability Factor 0

35.6%

56. 7 t.
21. Unit Capacity Factor (Using NIDC Net) 0 35.4%

51.7%

2.'

Unit Capacity Factor (Using DER Net) 0 33.6%

49.0%

23. Unit Forced Outage Rate 0

18.0%

34.4%

24. Shutdowns Scheduled Oser Next 6 51onths (Type. Date.and Duration of Fach1:

continuing refueling outage

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 7/13/80,
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achiesed

, INITIA L CRITICA LITY 1/14/77 f'

INITIA L EL EC1 RICITY 1/30/77

~ Cost %IERCI A L Ol'ER A IlON 3/13/77 e

(9 N)

/

8006190 62[

i, V

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 FLCRP-3

.lT DATE 6/2/80 COMPLETED BY M.w. culver TELEPHONE MONTH May 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5the-Net) 431We-Net) 1 0

g7 0

2 n

18 0

3 0

19 0

4 0

20 0

5 0

g 0

6 0

O f

O

3 0

s 0

o u

9 0

0

g 10 0

26 0

11 0

7 0

12 0

3 0

13 0

29 0

44 0

30 0

15 0

31 0

16 0

f INSTRUCTIONS On this format. list the average dady unit power levelin 31We Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

50-302 DOC KET NO.

UNIT SilUIDOWNS AND POWER REDUCTIONS UNIl NAME DATE 6/2/80 Ft. W.

Culver COMPT.ET ED I!Y REPORT MONill ___M3Y lll.EPilONE (904)795-6486

.$ E 3

5' l.icensee

,E -r, Cause & Co:rective g

3 Ej j

jgy Event gy Action to No.

D.it e o.

lteport #

v) V o

Psesent itecurrence fI 5

t ;f3 H

=

o g

u e

O 80-9 800501 S

744 C

4 N/A ZZ ZZZZZZ Continuation of the refueling outage begun on 3/7/80 I

2 3

4 F: Forced Iteason:

Method:

Exhibit G. Instsuctions S: Scheiluted A Equipment Failure (Explain) 1 -Manual for Pieparation of Data ll Maintenance oi Test 2-Manual Scram.

Entry Shecis for 1.icensee C ltefueling 3 Aulornatic Saain.

I sent Iteposi (1.l:lt) file INtlitt'G.

D Itegulatory itestoiction 4 Other (Explain) 0161)

1. Operator Training & l.icense Exainination F-Adininistrative 5

1 G.Operatmnal I rior (Explain)

I Alnbit I Same Source I'l/77)

Il Other (lixplain) l-

.n,n

,