ML19323J264
| ML19323J264 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/02/1980 |
| From: | Culver M FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19323J262 | List: |
| References | |
| NUDOCS 8006190621 | |
| Download: ML19323J264 (3) | |
Text
- ?*
ui OPERATING DATA REPORT DOCKET NO. _50-302 DATE _6/2/80 CO.\\lPLETED IW _ M. W.
Culver TELEPliONE (904)795-6486 OPERATING STATUS
! Unit Name:
Crystal River Unit 3 N"
~
- 2. Reporting Period: 5/1/80 - 5/31/80
- 3. Licensed Thennal Power (51Wt): 2452
- 4. Nameplate Rating (Gross N!We):
890
- 5. Daign E!cetrical Rating (Net 51We):
825 821
- 6. Slasimum Dependable Capacity (Gross SIWE):
2
- 7. Slaximum Dependable Capacity (Net 51We):
- h. If Chan;es Occur in Capacity Ratings (!! ems Number 3 Through 7J Since Last Report. Gise Reasons:
- 9. Power Lesel To which Restricted.lf Any (Net 51We):
"one
- 10. Reasons For Restrictions. If Any:
This 5f onth Yr.-to.Date Cumulatise
- 11. Ilours In Reporting Period 744 3647 28223
- 12. Number Of Ifours Reactor was Critical 0
1305.5 16455.8
- 13. Reactor Resene Shutdown Hours 0
0 1116.9 I4. Ifours Generator On.Line 0
1297.4 15997.6
- 15. Unit Resene Shutdown llours 0
0 o
0
- 16. Gross Thermal Energy Generated (5thlf) 3085927 35402838
- 17. Grow Electrical Energy Generated (%!WH) 0 1058396 12030164
- 15. Net Electrical Energy Generated (51WH) 0 1009335 11400975
- 19. Unit Senice Factor 0
35.6%
56.7%
- 20. Unit Asailability Factor 0
35.6%
- 56. 7 t.
- 21. Unit Capacity Factor (Using NIDC Net) 0 35.4%
51.7%
2.'
Unit Capacity Factor (Using DER Net) 0 33.6%
49.0%
- 23. Unit Forced Outage Rate 0
18.0%
34.4%
- 24. Shutdowns Scheduled Oser Next 6 51onths (Type. Date.and Duration of Fach1:
continuing refueling outage
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 7/13/80,
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed
, INITIA L CRITICA LITY 1/14/77 f'
INITIA L EL EC1 RICITY 1/30/77
~ Cost %IERCI A L Ol'ER A IlON 3/13/77 e
(9 N)
/
8006190 62[
i, V
- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 FLCRP-3
.lT DATE 6/2/80 COMPLETED BY M.w. culver TELEPHONE MONTH May 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5the-Net) 431We-Net) 1 0
g7 0
2 n
18 0
3 0
19 0
4 0
20 0
5 0
- g 0
6 0
O f
O
- 3 0
s 0
o u
9 0
0
- g 10 0
26 0
11 0
- 7 0
12 0
- 3 0
13 0
29 0
44 0
30 0
15 0
31 0
16 0
f INSTRUCTIONS On this format. list the average dady unit power levelin 31We Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
50-302 DOC KET NO.
UNIT SilUIDOWNS AND POWER REDUCTIONS UNIl NAME DATE 6/2/80 Ft. W.
Culver COMPT.ET ED I!Y REPORT MONill ___M3Y lll.EPilONE (904)795-6486
.$ E 3
5' l.icensee
,E -r, Cause & Co:rective g
3 Ej j
jgy Event gy Action to No.
D.it e o.
lteport #
v) V o
Psesent itecurrence fI 5
t ;f3 H
=
o g
u e
O 80-9 800501 S
744 C
4 N/A ZZ ZZZZZZ Continuation of the refueling outage begun on 3/7/80 I
2 3
4 F: Forced Iteason:
Method:
Exhibit G. Instsuctions S: Scheiluted A Equipment Failure (Explain) 1 -Manual for Pieparation of Data ll Maintenance oi Test 2-Manual Scram.
Entry Shecis for 1.icensee C ltefueling 3 Aulornatic Saain.
I sent Iteposi (1.l:lt) file INtlitt'G.
D Itegulatory itestoiction 4 Other (Explain) 0161)
- 1. Operator Training & l.icense Exainination F-Adininistrative 5
1 G.Operatmnal I rior (Explain)
I Alnbit I Same Source I'l/77)
Il Other (lixplain) l-
.n,n
,