- ML19260D139 + (ML19260D139)
- ML19260D140 + (ML19260D140)
- PNO-II-79-044, on 791219,w/reactor in Cold shutdown,13,500 Gallons of Reactor Coolant Spilled Onto Containment Floor Through Disassemblied Feedwater Check Valve.Caused by Error on Written Work Request.No Radioactivity Released + (ML19260D141)
- ML19260D142 + (ML19260D142)
- PNO-III-79-060A, following Shutdown on 791211,two Leaking Plugs Detected During Static Head Test of Steam Generator B & Leaking Tube Detected During Hydrostatic Tests.Inspector Dispatched to Follow Testing,Repair & re-hydro of Leaks + (ML19260D143)
- ML19260D145 + (ML19260D145)
- ML19260D146 + (ML19260D146)
- ML19260D147 + (ML19260D147)
- ML19260D148 + (ML19260D148)
- ML19260D149 + (ML19260D149)
- ML19260D150 + (ML19260D150)
- IR 05000301/1979020 + (ML19260D152)
- ML19260D154 + (ML19260D154)
- ML19260D155 + (ML19260D155)
- ML19260D156 + (ML19260D156)
- PNO-I-79-030, on 791205,while Disconnecting Dewatering Vacuum Hose,Two Workers Sprayed W/Contaminated Resin Beads.Measured 3,000-3,500 Dpm on One Worker.Worker Decontaminated & Eyes Examined.Dewatering Procedure Will Be Reviewed + (ML19260D157)
- PNO-II-79-035, on 791202,reactor Tripped on High Flux Level. Caused by Failure in electro-hydraulic Control Sys Resulting in Turbine Control Valve Closure & Pressure Spike.Regulator Repaired & Reactor Repaired + (ML19260D158)
- PNO-II-79-036, on 791202,leak from Condensate Storage Tank Spilled Water Onto Ground Surrounding Transfer Pump.Probably Less than 10 Uci,Excluding Tritium,Released.Pump Isolated. Design Changes Will Be Implemented to Contain Such Leaks + (ML19260D159)
- PNO-II-79-037, on 791203,while Preparing Workable Climate for Const Personnel in Fuel Bldg Area,Gasoline Overflowed from Heater Drip Pan to Floor & Three Workers Treated for Fume Exposure.Heaters Removed,Gasoline Mopped Up + (ML19260D160)
- ML19260D161 + (ML19260D161)
- ML19260D163 + (ML19260D163)
- ML19260D164 + (ML19260D164)
- ML19260D165 + (ML19260D165)
- ML19260D166 + (ML19260D166)
- ML19260D167 + (ML19260D167)
- ML19260D168 + (ML19260D168)
- ML19260D169 + (ML19260D169)
- ML19260D170 + (ML19260D170)
- ML19260D171 + (ML19260D171)
- ML19260D172 + (ML19260D172)
- ML19260D173 + (ML19260D173)
- ML19260D174 + (ML19260D174)
- ML19260D176 + (ML19260D176)
- ML19260D178 + (ML19260D178)
- ML19260D179 + (ML19260D179)
- ML19260D180 + (ML19260D180)
- ML19260D181 + (ML19260D181)
- ML19260D183 + (ML19260D183)
- ML19260D184 + (ML19260D184)
- ML19260D185 + (ML19260D185)
- ML19260D186 + (ML19260D186)
- ML19260D187 + (ML19260D187)
- ML19260D188 + (ML19260D188)
- ML19260D189 + (ML19260D189)
- ML19260D190 + (ML19260D190)
- ML19260D191 + (ML19260D191)
- ML19260D192 + (ML19260D192)
- ML19260D194 + (ML19260D194)
- PNO-III-80-013, on 800117,bushing Failed on Reserve Auxiliary Transformer,Causing Loss of Power,Turbine Trip & Reactor Trip.Plant Brought to Hot Shutdown.Natural Convective Cooling Established.No Indication of Leakage + (ML19260D195)
- ML19260D196 + (ML19260D196)
- ML19260D197 + (ML19260D197)