Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19259C075 + (ML19259C075)
- ML19259C076 + (ML19259C076)
- ML19259C077 + (ML19259C077)
- ML19259C078 + (ML19259C078)
- ML19259C079 + (ML19259C079)
- ML19259C080 + (ML19259C080)
- ML19259C081 + (ML19259C081)
- ML19259C082 + (ML19259C082)
- ML19259C083 + (ML19259C083)
- 05000250/LER-1979-014, Forwards LER 79-014/03L-0 + (ML19259C084)
- ML19259C085 + (ML19259C085)
- ML19259C086 + (ML19259C086)
- ML19259C087 + (ML19259C087)
- ML19259C088 + (ML19259C088)
- ML19259C089 + (ML19259C089)
- ML19259C090 + (ML19259C090)
- 05000250/LER-1979-014-03, /03L-0 on 790424:ready to Start Light on B Emergency Diesel Generator Engine Control Panel Failed. Caused by Vibration of Lamp Socket.Tests Under Way to Determine If Neon Unit Would Be Better Suited + (ML19259C092)
- ML19259C093 + (ML19259C093)
- ML19259C094 + (ML19259C094)
- ML19259C095 + (ML19259C095)
- ML19259C096 + (ML19259C096)
- 05000250/LER-1979-015, Forwards LER 79-015/03L-0 + (ML19259C097)
- ML19259C098 + (ML19259C098)
- ML19259C099 + (ML19259C099)
- ML19259C100 + (ML19259C100)
- ML19259C101 + (ML19259C101)
- 05000250/LER-1979-015-03, /03L-0 on 790426:B Emergency Diesel Generator Failed Loading Acceptance Criteria.Caused by Cracked half-inch Nipple to Fuel Pump Which Resulted in Partial Fuel Starvation.Nipple Replaced & Old Nipple Reanalyzed + (ML19259C102)
- ML19259C103 + (ML19259C103)
- 05000250/LER-1979-016, Forwards LER 79-016/03L-0 + (ML19259C104)
- ML19259C105 + (ML19259C105)
- ML19259C106 + (ML19259C106)
- 05000245/LER-1979-013, Forwards LER 79-013/03L-0 + (ML19259C107)
- ML19259C109 + (ML19259C109)
- 05000245/LER-1979-013-03, /03L-0 on 790508:oxygen Pressure 603.5 Check for Source Range Monitors Not Completed for 24-h Period. Surveillance Overlooked.Checklist Added to Indicate Requirement of Procedure + (ML19259C110)
- 05000250/LER-1979-016-03, /03L-0 on 790429:high Level Alarm Annunciated. Caused by Instrument Drift of Tech Spec Min & High Level Alarms & Digital Level Indicator Transducer.Instruments Recalibr + (ML19259C111)
- 05000306/LER-1979-016, Forwards LER 79-016/03L-0 + (ML19259C112)
- ML19259C113 + (ML19259C113)
- ML19259C114 + (ML19259C114)
- ML19259C115 + (ML19259C115)
- ML19259C116 + (ML19259C116)
- ML19259C117 + (ML19259C117)
- 05000306/LER-1979-016-03, /03L-0 on 790509:during Audit of Surveillance Program,Found That Reactor Vessel Injection Isolation Valve Test Sp 2159 Had Not Been Done.Caused by Failure to Enter Test on Computer Surveillance Schedule + (ML19259C118)
- ML19259C119 + (ML19259C119)
- ML19259C120 + (ML19259C120)
- 05000324/LER-1979-034, Forwards LER 79-034/03L-0 + (ML19259C122)
- ML19259C123 + (ML19259C123)
- 05000237/LER-1979-031-03, /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded + (ML19259C124)
- ML19259C125 + (ML19259C125)
- ML19259C126 + (ML19259C126)
- 05000324/LER-1979-034-03, /03L-0 on 790510:while Performing PT 20.3,primary Containment Isolation Valve Local Leak Rate Test Containment Isolation Valves Would Not Seat & Hold Pressure.Caused by Valve Bushing Wear.Valves Dissassembled & Bushings Repl + (ML19259C127)
- ML19259C128 + (ML19259C128)