ML19259C098

From kanterella
Jump to navigation Jump to search
Forwards LER 79-015/03L-0
Date released: 09/30/2019 Download: ML19259C098


LER 79-015/03L-0 on 790426:B Emergency Diesel Generator Failed Loading Acceptance Criteria.Caused by Cracked half-inch Nipple to Fuel Pump Which Resulted in Partial Fuel Starvation.Nipple Replaced & Old Nipple Reanalyzed
ML19259C102
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/24/1979
From: James D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C102 (1)
Forwards LER 79-015/03L-0
ML19259C097
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/24/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C097 (1)