Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19253C902 + (ML19253C902)
- ML19253C903 + (ML19253C903)
- ML19253C904 + (ML19253C904)
- ML19253C905 + (ML19253C905)
- ML19253C906 + (ML19253C906)
- ML19253C907 + (ML19253C907)
- 05000267/LER-1979-058-03, /03L-0:on 791107,during Reactor Shutdown,Line Supplying Backup Bearing Water to 1A Helium Circulator Determined to Be Impaired Due to Impaired Hanger.Caused by Missing Anchor Bolt & Stripped Anchor Bolt Shield + (ML19253C908)
- ML19253C909 + (ML19253C909)
- 05000267/LER-1979-059, Forwards LER 79-059/03L-0 + (ML19253C910)
- ML19253C911 + (ML19253C911)
- ML19253C912 + (ML19253C912)
- ML19253C913 + (ML19253C913)
- 05000267/LER-1979-059-03, /03L-0:on 791109,during Reactor Shutdown for Maint,Boiler Feeder Snubber BFS-412 Observed Inoperable. Caused by Empty Hydraulic Oil Reservoir.Reservoir Refilled + (ML19253C914)
- 05000277/LER-1979-048, Forwards LER 79-048/03L-0 + (ML19253C915)
- ML19253C916 + (ML19253C916)
- ML19253C917 + (ML19253C917)
- ML19253C918 + (ML19253C918)
- ML19253C919 + (ML19253C919)
- 05000277/LER-1979-048-03, /03L-0:on 791030,during Relamping of Main Off Gas Stack,Personnel Discovered Broken Isokinetic Sample Line. Caused by Crimp at U Clamp Support Bracket & Fatigue from Expansion,Contraction & Wind Loading + (ML19253C922)
- ML19253C925 + (ML19253C925)
- ML19253C926 + (ML19253C926)
- ML19253C927 + (ML19253C927)
- ML19253C928 + (ML19253C928)
- ML19253C929 + (ML19253C929)
- ML19253C931 + (ML19253C931)
- ML19253C932 + (ML19253C932)
- ML19253C933 + (ML19253C933)
- ML19253C935 + (ML19253C935)
- ML19253C936 + (ML19253C936)
- ML19253C937 + (ML19253C937)
- ML19253C938 + (ML19253C938)
- ML19253C939 + (ML19253C939)
- ML19253C940 + (ML19253C940)
- ML19253C941 + (ML19253C941)
- ML19253C942 + (ML19253C942)
- ML19253C943 + (ML19253C943)
- ML19253C944 + (ML19253C944)
- ML19253C945 + (ML19253C945)
- ML19253C946 + (ML19253C946)
- ML19253C947 + (ML19253C947)
- ML19253C948 + (ML19253C948)
- ML19253C949 + (ML19253C949)
- 05000277/LER-1979-050, Forwards LER 79-050/01T-0 + (ML19253C950)
- ML19253C951 + (ML19253C951)
- ML19253C952 + (ML19253C952)
- ML19253C953 + (ML19253C953)
- 05000348/LER-1979-055-03, /03L-0:on 791108,borated Water Vol in Boric Acid Storage Tank Fell Below Tech Spec Limit Due to Reactor Cooldown.Boric Acid Tank Concentration Was Returned to Less than 7,700 Ppm,By 771109 + (ML19253C956)
- 05000277/LER-1979-050-01, /01T-0:on 791113,during Insp in Response to IE Bulletin 79-02,eight Hangers for Control Rod Drive Insert/Withdrawal Piping Found Not Qualified to Withstand Dbe.Caused by Seismic Support Design Deficiency + (ML19253C957)
- ML19253C958 + (ML19253C958)
- ML19253C959 + (ML19253C959)
- ML19253C960 + (ML19253C960)