ML19253C907

From kanterella
Jump to navigation Jump to search
Requests Extension Until 800301 to Submit Analysis of Loads & Load Height Due to Need to Work on Restart Items.No Plans to Ship Spent Fuel Prior to Mar 1980
ML19253C907
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/05/1979
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7912120335
Download: ML19253C907 (1)


Text

-

Metropolitan Edison Company Post Office Box 542 Reading Pennsylvania 19640 215 929-3601 Wnter's Direct Dial Number December 5, 1979 GQL l!.68 Director, Nuclear Reactor Regulations Attn:

R. W.

Reid, Chief Operating Reactors Branch No. L U. S. Nuclear Regulatory Conmission Washington, D. C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit I Cperating License No. DPR-50 Docket No. 50-289 Cask Drop Evaluation Per our letter of August 21,1979 (GQL 1058),' Met-Ed coc=itted to submit an analysis of loads and load height in the area north of the tracks where the possibility exists for ilmaging circuits of two colors.

Met-Ed is requesting an extension until March 1,1980 to submit the analysis.

'Ihis request is prompted by the need to work on restart items and that there are no plans to ship spent fuel prior to March 1980.

Sincerely, 4

,/

~

Y k

/

J. G. Herbein

[

Vice President nuclear Operations JGH:DGM:bw 1541 360 Aoot S

7912120 3 3 5 f/o Metrecchtan Ed. son Comcany,s a Memcer of the Genera! Puchc Utlties System

.