Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19246B489 + (ML19246B489)
- ML19246B490 + (ML19246B490)
- ML19246B492 + (ML19246B492)
- ML19246B493 + (ML19246B493)
- ML19246B494 + (ML19246B494)
- ML19246B496 + (ML19246B496)
- ML19246B498 + (ML19246B498)
- ML19246B500 + (ML19246B500)
- ML19246B501 + (ML19246B501)
- ML19246B502 + (ML19246B502)
- ML19246B503 + (ML19246B503)
- ML19246B504 + (ML19246B504)
- ML19246B505 + (ML19246B505)
- IR 05000412/1979004 + (ML19246B507)
- ML19246B508 + (ML19246B508)
- ML19246B509 + (ML19246B509)
- ML19246B510 + (ML19246B510)
- ML19246B511 + (ML19246B511)
- ML19246B513 + (ML19246B513)
- ML19246B514 + (ML19246B514)
- ML19246B515 + (ML19246B515)
- ML19246B516 + (ML19246B516)
- 05000368/LER-1979-044-03, /03L-0 on 790610:valve Operator Tripped Circuit Breaker on Overload & Affected Containment Penetration Automatic Isolation Valve Deactivated in Closed Position. Caused by Valve Shaft Binding in Packing.Valve Tested + (ML19246B518)
- ML19246B519 + (ML19246B519)
- 05000368/LER-1979-045-03, /03L-0 on 790613:channel a Core Protection Calculator Taken Out of Bypass,Resulting in Linear Power Density & DNBR Trip.Cause Unknown.Channel Tested & Returned to Svc + (ML19246B520)
- 05000293/LER-1979-020, Forwards LER 79-020/03L-0 + (ML19246B521)
- ML19246B522 + (ML19246B522)
- 05000293/LER-1979-020-03, /03L-0 on 790610:broken Belts Found on Standby Gas Treatment Sys Exhaust Fan 210A.Caused by Belt Age.Belts Replaced & Sys Returned to Svc + (ML19246B523)
- ML19246B524 + (ML19246B524)
- ML19246B526 + (ML19246B526)
- 05000324/LER-1979-050, Forwards LER 79-050/03L-0 + (ML19246B529)
- ML19246B530 + (ML19246B530)
- 05000324/LER-1979-050-03, /03L-0 on 790619:2A RHR Svc Water Pump Uncoupled by Mistake After Clearance of 2B Pump for Uncoupling.Caused by Personnel Error.Pump Recoupled & Tested When Mistake Was Discovered.Clearance Procedure Changed + (ML19246B531)
- 05000259/LER-1979-008, Forwards LER 79-008/03L-0 + (ML19246B532)
- ML19246B533 + (ML19246B533)
- 05000259/LER-1979-008-03, /03L-0 on 790612:during Normal Operation, Pressure Switches PS-1-81 a & B & PS-1-91 a & B Setpoints Exceeded Tech Specs by 3-15 Psig. Caused by Model B2T-A12SS Switches Drifting + (ML19246B534)
- ML19246B535 + (ML19246B535)
- ML19246B536 + (ML19246B536)
- ML19246B537 + (ML19246B537)
- ML19246B538 + (ML19246B538)
- ML19246B539 + (ML19246B539)
- ML19246B540 + (ML19246B540)
- ML19246B541 + (ML19246B541)
- ML19246B542 + (ML19246B542)
- ML19246B543 + (ML19246B543)
- ML19246B544 + (ML19246B544)
- ML19246B546 + (ML19246B546)
- ML19246B547 + (ML19246B547)
- ML19246B548 + (ML19246B548)
- 05000321/LER-1979-043, Forwards LER 79-043/01T-0 + (ML19246B551)
- ML19246B552 + (ML19246B552)