Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18114A116 + (ML18114A116)
- ML18114A120 + (ML18114A120)
- SVP-18-030, Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 13 + (ML18114A124)
- ML18114A125 + (ML18114A125)
- ML18114A127 + (ML18114A127)
- ML18114A146 + (ML18114A146)
- ML18114A148 + (ML18114A148)
- L-78-249, Forwards Follow-up Report Containing More Detailed Information on Results of First Steam Generator Inservice Inspection + (ML18114A151)
- ML18114A152 + (ML18114A152)
- ML18114A157 + (ML18114A157)
- ML18114A159 + (ML18114A159)
- L-78-223, Forwards Requested Information Regarding Fp&Ls Position and Bases Concerning Testing of Power Operated Relief Valves + (ML18114A160)
- L-78-215, Post LOCA Boron Concentration Control. Response to NRCs Letter 5/18/1978. FP&L Will Submit Response by 7/31/1978 + (ML18114A163)
- ML18114A167 + (ML18114A167)
- L-78-199, Forwards Response to Two Staff Positions on Diesel Generator Lockout Enclosed in 5/8/1978 Letter + (ML18114A168)
- L-78-195, Information Regarding Fracture Toughness and Potential for Lamellar Tearing of Steam Generator and Reactor Coolant Pump Support Materials Was Turned Over to NRC Staff + (ML18114A169)
- ML18114A170 + (ML18114A170)
- ML18114A173 + (ML18114A173)
- L-78-177, Response to Letter of 5/8/1978 Requesting Certain Information to Complete Review of Application to Restart St. Lucie Unit 1 Following Refueling. FP&L Will Provide Schedule to Responses by 6/8/1978 + (ML18114A174)
- ML18114A175 + (ML18114A175)
- ML18114A176 + (ML18114A176)
- ML18114A179 + (ML18114A179)
- ML18114A180 + (ML18114A180)
- L-78-180, Response to NRCs 5/17/1978 Letter, Fp&Ls Commitment to Complete Testing Concerning Resistance Temperature Detector Response Times by 12/1/1978 + (ML18114A181)
- ML18114A182 + (ML18114A182)
- ML18114A183 + (ML18114A183)
- ML18114A184 + (ML18114A184)
- ML18114A185 + (ML18114A185)
- L-78-175, Forwards Responses to Questions from NRC Regarding Cycle 2 Reload Safety Evaluation + (ML18114A188)
- ML18114A191 + (ML18114A191)
- L-78-158, Fp&Ls Request to Delete Conditions of License N, O, and P from Enclosure 1 as Having Been Satisfied + (ML18114A201)
- ML18114A202 + (ML18114A202)
- ML18114A204 + (ML18114A204)
- ML18114A205 + (ML18114A205)
- ML18114A206 + (ML18114A206)
- L-78-151, Fp&Ls Request to Change Required Date for Submission of Nuclear Material Inventory from 4/30/1978 to 8/31/1978 + (ML18114A207)
- ML18114A208 + (ML18114A208)
- L-78-144, CEA Guide Tube Sleeving. Forwards Outline of Sleeving Procedures + (ML18114A211)
- L-78-138, Letter Correcting Typographical Error in Fp&Ls Response to NRCs Request 3/23/1978 Regarding Asymmetric Loads + (ML18114A212)
- ML18114A213 + (ML18114A213)
- L-78-122, Refueling Outage Schedule + (ML18114A214)
- L-78-118, Forwards Response to Request for Additional Information 3/16/1978 Regarding System Disturbance Occurred on 5/16/1977 + (ML18114A215)
- ML18114A216 + (ML18114A216)
- ML18114A217 + (ML18114A217)
- ML18114A218 + (ML18114A218)
- ML18114A222 + (ML18114A222)
- ML18114A225 + (ML18114A225)
- ML18114A226 + (ML18114A226)
- ML18114A227 + (ML18114A227)
- ML18114A228 + (ML18114A228)
- ML18114A229 + (ML18114A229)