ML18114A120

From kanterella
Jump to navigation Jump to search
02/07/1978, Letter in Response to Request for Justification on CEA Guide Tube Wear
ML18114A120
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/07/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
L-78-43
Download: ML18114A120 (6)


Text

N RC FORM 195 U.S. NUCLEAR REGULATORV Co MISSION DOCKET NUMBER (2 76) d 3 FILE NUMBER NRC DISTRlBUTION FoR PART 60 DOCKET MATERiAL g.

Mr. V. Stello FROM: PPL DATE OF D CU ENT Miami, Fla. 33101 R. E. Uhrig DATE REC IV D BETTE R QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED OORIGINAL 0 UN C LASS F E D I I gPOPV DESCRIPTION Ltr requesting withholding pursuant ENCLOSURE CEN-79-P entitled "Reactor Operatio to Sec . 2.790 prom the public the followin with Guide Tube Wear"......1$ ....

PROP info......2P PLANT NAME: B8. Lucie Plant FOR ACTION/INFORMATION ENVIRONMENTAL ASSIGNED AD: OR LTR CH CHIEF: BRANCH CHIEF:

PROJECT MANAGER: I R:

LIC. ASST:

B. HARLESS INTERNAL DISTRIBUTION T SYSTEMS SITE SAFETY G V C DR~ ENVIRON ANALYSIS DENTON I(l MULLER GOSSICK G STAFF ENGINEERING P LITO FNVIRON TECH ERNST CTORS BALLARD VAGEMENT ACTOR SAFETY TECH ROSS B FR~ AMMILL (2 INS NOVAK TLFR ROSZTOCZY ALYSIS CHECK VOLLMER CH LLINS ~ L LT MAN EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: ~

A~a REG V J. HANCHETT) 7SOO6OOOr I CYS SENT CATEGOR to ACRS NRC FORM 196 (2.76)

vr 7 f 4 l

t a

1 e

DOCKET NO.

DATE: 2 NOTE TO 'ND/OR LOCAL PUBLIC DOCUMENT ROOMS The following item submitted with letter dated from is being withheld from public disclosure, pending review, in accordance with Section 2.790.

PROPRIETARY INFORMATION Rec o~

Regulatory File Room

0 P. O. BOX 013100, MIAMI, FL 33101 e9 AEczivEQ FLORIDA POWER 6 LIGHT COMPANY F~~

VJ sl 9 878 IIIlafAR k,

,Cob+ Ig> +~TOjg February 7, 1978 L-78-43 o

.8 Office of Nuclear Reactor Regulation Attention: Mr. Victor Stello, Director Division of Operating Licenses U. S. Nuclear Regulatory D.C. 20555 Commission'ashington,

Dear Mr. Stello:

Re: St. Lucie Unit 1 Docket No. 50-335 CEA Guide Tube Wear Your letter of January 18, 1978 requested justification that excessive guide tube wear does not exist at St. Lucie Unit 1 or information justifying'ontinued operation oi St. Lucie Unit 1 considering the potential for guide tube wear.

St. Lucie Unit 1 is presently scheduled to be shutdown for refueling about April 1, 1978, and we will be unable to determine the amount of guide tube wear for the unit until that time. Our NSSS Vendor has prepared a report which is responsive to your request for justification of continued operation. .The report specifically addresses reactor operation with guide tube wear and supports continued operation of St. Lucie Unit 1. This report (CEN- -P) discusses inspection results from other facilities and eva uates the impact of guide tube wear on SAR analyses. The report concludes that reactor operation with worn guide tubes does ndt create undue risk to the health and safety of the public.

CAsogral pry fc(PcAi wi t'4 F'Pl. Z/Who

'7ggl Qdod'7 PEOPLE... SERVING PEOPLE

0 Mr. Victor Stello February 7, 1978 Page Two We had planned to forward a copy of the report with this letter. However, due to inclement weather in the Northeast (where our NSSS vendor is located) our receipt of the report has been delayed. We expect, to receive the report within the next few days at which time we will promptly forward a copy to your office.

Very truly yours, Robert. E. Uhrig Vice President REU:MAS:sl cc: Mr. James P. O'Reilly, Region XZ Harold F. Reis, Esqui Mr. Edward Reeves

0 'l E

II 4

~~