Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18113A770 + (ML18113A770)
- ML18113A771 + (ML18113A771)
- ML18113A772 + (ML18113A772)
- ML18113A774 + (ML18113A774)
- GNRO-2018/00020, Transmittal of Annual Report of Individual Monitoring - NRC Form 5 for 2017 Per 10CFR20.2206 + (ML18113A777)
- ML18113A780 + (ML18113A780)
- 05000280/LER-1979-001, Forwards LER 79-001/01X-0 + (ML18113A786)
- ML18113A787 + (ML18113A787)
- ML18113A788 + (ML18113A788)
- 05000280/LER-1979-001-01, /01X-0 on 790102:potential non-conservatism Noted in Calculations Performed in Monitoring Heat Flux Hot Channel Factor.Caused by Failure of Sys & Procedures Used for Relevant Surveillance.Input Values Adjusted + (ML18113A789)
- ML18113A790 + (ML18113A790)
- ML18113A791 + (ML18113A791)
- ML18113A792 + (ML18113A792)
- ML18113A793 + (ML18113A793)
- ML18113A794 + (ML18113A794)
- ML18113A795 + (ML18113A795)
- ML18113A799 + (ML18113A799)
- ML18113A801 + (ML18113A801)
- ML18113A802 + (ML18113A802)
- IR 05000280/1978033 + (ML18113A806)
- ML18113A807 + (ML18113A807)
- 05000280/LER-1978-041, Forwards LER 78-041/03X-1 + (ML18113A811)
- ML18113A812 + (ML18113A812)
- 05000280/LER-1978-041-03, /03X-1 on 781121:during Performance of PT-39-1 at Full Power,Snubber 1-WAPD-HSS-141B Had 0 Fluid Level in Reservoir,Due to Crack in Reservoir Glass + (ML18113A813)
- ML18113A815 + (ML18113A815)
- ML18113A817 + (ML18113A817)
- 05000280/LER-1978-031-03, /03X-1 on 781001:during Normal Operation,Channel I Pressurizer Level (Protection) L-I-459 Drifted High.Caused by Drift of Electronic Zero Adjustment,In Conjunction W/ Leakage Thru Transmitter Bypass/Equalizing Valve + (ML18113A818)
- 05000280/LER-1978-038-03, /03X-1 on 781108:review of Operational Data Showed That Quarterly Calibr of Nuclear Power Range Instrumentation Had Not Been Performed Per Schedule,Due to Scheduling Error + (ML18113A819)
- ML18113A820 + (ML18113A820)
- IR 05000280/1978034 + (ML18113A822)
- ML18113A823 + (ML18113A823)
- ML18113A824 + (ML18113A824)
- ML18113A825 + (ML18113A825)
- ML18113A826 + (ML18113A826)
- ML18113A827 + (ML18113A827)
- ML18113A830 + (ML18113A830)
- ML18113A831 + (ML18113A831)
- 05000281/LER-1979-001, Forwards LER 79-001/03L-0 + (ML18113A832)
- ML18113A833 + (ML18113A833)
- 05000281/LER-1979-001-03, /03L-0 on 790112:personnel Batch Inner Door & Emergency Escape Manway Not Leak Tested within 72-h After Opening Because Escape Manway Safety Lock Believed Broken, Posing Hazard + (ML18113A834)
- ML18113A835 + (ML18113A835)
- 05000280/LER-1979-002, Forwards LER 79-002/03L-0 + (ML18113A836)
- ML18113A837 + (ML18113A837)
- 05000280/LER-1979-002-03, /03L-0 on 790115:electrical Penetration Between Turbine Bldg & Emergency Switchgear Room Not Properly Sealed.Caused by Penetration Being Broken During Previous Implementation of Design Change + (ML18113A838)
- ML18113A839 + (ML18113A839)
- ML18113A840 + (ML18113A840)
- ML18113A841 + (ML18113A841)
- ML18113A842 + (ML18113A842)
- ML18113A843 + (ML18113A843)
- ML18113A844 + (ML18113A844)