ML18113A817

From kanterella
Jump to navigation Jump to search
Forwards LER 78-031/03X-1 & 78-038/03X-1
Date released: 12/10/2018 Download: ML18113A817


LER 78-038/03X-1 on 781108:review of Operational Data Showed That Quarterly Calibr of Nuclear Power Range Instrumentation Had Not Been Performed Per Schedule,Due to Scheduling Error
ML18113A819
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/02/1979
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A819 (2)
LER 78-031/03X-1 on 781001:during Normal Operation,Channel I Pressurizer Level (Protection) L-I-459 Drifted High.Caused by Drift of Electronic Zero Adjustment,In Conjunction W/ Leakage Thru Transmitter Bypass/Equalizing Valve
ML18113A818
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/02/1979
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A818 (2)
Forwards LER 78-031/03X-1 & 78-038/03X-1
ML18113A816
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/02/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A816 (1)