Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N980356, Documents Info Exchanged W/Nrc from 980616 Meeting Re Status of Design/Licensing Bases Review Project (Dlbrp).Attachment 1 Compares Original Dlbrp Methodology W/Util Planned Future Actions + (ML18106A784)
- ML18106A785 + (ML18106A785)
- LR-N980266, Provides 90-day Response to GL 98-01 Re Yr 2000 Readiness of Computer Systems.Scope of Licensee Project Plan Discussed + (ML18106A786)
- ML18106A787 + (ML18106A787)
- ML18106A788 + (ML18106A788)
- ML18106A789 + (ML18106A789)
- ND-18-0498, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.03.08c.xii (Index Number 197) + (ML18106A790)
- LR-N970738, Application for Amends to Licenses DPR-70 & DPR-75,revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Following Phrase + (ML18106A791)
- ML18106A792 + (ML18106A792)
- ML18106A793 + (ML18106A793)
- ML18106A794 + (ML18106A794)
- ML18106A795 + (ML18106A795)
- ML18106A796 + (ML18106A796)
- ML18106A797 + (ML18106A797)
- ML18106A798 + (ML18106A798)
- ML18106A799 + (ML18106A799)
- LR-N980385, Documents Agreement That Response to RAI Re GL 96-06,will Be Submitted within 90 Days of Receipt of Request Instead of 60 Days + (ML18106A800)
- LR-N980367, Responds to NRC Re Violations Noted in Insp Repts 50-272/98-06,50-311/98-06 & 50-354/98-06,respectively. Corrective Actions:Personnel Involved in Events Will Be Held Accountable IAW Pse&G Policies & Revised Procedures + (ML18106A801)
- ML18106A802 + (ML18106A802)
- IR 05000272/1998007 + (ML18106A804)
- ML18106A805 + (ML18106A805)
- ML18106A806 + (ML18106A806)
- LR-N980348, Submits Response to NRC 980611 RAI Re GL 92-01,rev 1, Suppl 1, Reactor Vessel Structural Integrity. Supporting Info & Rept CENPSD-1119,rev 1,encl + (ML18106A807)
- 05000311/LER-1998-010-01, :on 980714,determined That Leakage from Boron Injection Tank Exceeded Max Allowable ECCS Leakage from Sources Outside Containment.Caused by Leaking 2SJ404 Manual Sample valve.2SJ404 Valve Repaired + (ML18106A814)
- LR-N98-0393, Monthly Operating Rept for July 1998 for Salem,Unit 2 + (ML18106A815)
- 05000272/LER-1998-012, :on 980715,potential to Exceed Rating of Piping Due to Isolation of Overpressure Protection Line Was Noted. Caused by Inadequate Procedural Guidance.Appropriate Operations Dept Procedures Have Been Revised + (ML18106A820)
- ML18106A821 + (ML18106A821)
- ML18106A822 + (ML18106A822)
- ML18106A823 + (ML18106A823)
- LR-N980331, Forwards Revs 1 & 2 to Qualification Guide, Reactivity Manipulations Documentation Guide & Page from Training Procedure NC.TQ-TP.ZZ-0302, Nuclear Control Operator Training Program + (ML18106A825)
- ML18106A826 + (ML18106A826)
- ML18106A827 + (ML18106A827)
- ML18106A828 + (ML18106A828)
- ML18106A829 + (ML18106A829)
- ML18106A831 + (ML18106A831)
- IR 05000272/1998006 + (ML18106A834)
- LR-N980350, Application for Amends to Licenses DPR-70 & DPR-75,modifying TS for Containment Air Locks for Salem Units 1 & 2 + (ML18106A835)
- ML18106A836 + (ML18106A836)
- ML18106A837 + (ML18106A837)
- LR-N980379, Forwards Rev 33 to Nuclear Business Unit Emergency Plan, Incorporating Rev 5 of Emergency Plan Section 15.Basis for No Reduction in Effectiveness of Plan Included in Attachment to Ltr + (ML18106A839)
- 05000311/LER-1998-012-01, :on 980725,discovered That Plant Had Operated in Modes 1 & 2 w/twenty-two AFW Pumps Inoperable.Caused by Failure to Restore Pump Runout Protection Pressure Device to Svc.Returned Subject Device to Svc + (ML18106A842)
- 05000311/LER-1998-009-01, :on 980810,failure to Post Continuous Firewatch as Required by Fire Protection Plan Noted.Caused by Failure to Recognize Concurrent Conditions.Continuous Firewatch Was Posted Immediately & Repaired Smoke Detectors + (ML18106A843)
- ML18106A844 + (ML18106A844)
- LR-N980364, Requests That Investigation Rept Re Salem LER 272/94-016-00 Be Returned in Sealed Envelope Marked Confidential to Listed Address + (ML18106A846)
- IR 05000272/1998005 + (ML18106A847)
- ND-18-0433, Voggle Electric Generating Plant Unit 3 and Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.10.05a.1 (Index Number 437) + (ML18106A848)
- ML18106A850 + (ML18106A850)
- 05000311/LER-1998-011-01, :on 980803,ESFA During a 4KV Automatic Transfer Test Was Noted.Caused by Premature Release of Control Console Pushbutton Due to Inadequate Procedural Step.Revised Procedure + (ML18106A852)
- 05000311/LER-1998-007-01, :on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Cause of Event Has Not Yet Been Determined.Assembled Root Cause Team & Replaced Affected Tubing + (ML18106A853)
- LR-N980409, Forwards FFD Performance Data Rept for Six Month Period Ending 980630,IAW Requirements of 10CFR26.71(d) + (ML18106A854)