Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000272/1998001 + (ML18106A609)
- LR-N98-0244, Monthly Operating Rept for Apr 1998 for Salem Unit 2 + (ML18106A611)
- LR-N98-0243, Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1 + (ML18106A612)
- ML18106A613 + (ML18106A613)
- 05000311/LER-1998-008-01, :on 970814,failure to Test 21 & 22 AF 40 Valves in Closed Direction as Required by TS 4.0.5 Was Noted.Caused by Inadequate Design Mod Process.Motor Driven 21/22 AF 40 Valves Were Tested IAW Revised Procedure + (ML18106A614)
- ML18106A615 + (ML18106A615)
- LR-N980251, Submits Request for Approval of Incorporation of WRB-2 CHF Correlation Into Plant Licensing Basis.Util Requests NRC Approval by 980831 in Order to Support Fuel Mfg Schedule + (ML18106A616)
- LR-N980238, Informs That Rc Downey,License SOP-11342,has Resigned from Pse&G.License Should Be Terminated + (ML18106A617)
- LR-N980245, Responds to NRC Re Violations Noted in OI 1-96-031.Corrective Actions:Safeguards Event Log Updated When Incorrect Log Entry Was Discovered + (ML18106A618)
- ML18106A619 + (ML18106A619)
- ML18106A620 + (ML18106A620)
- ML18106A621 + (ML18106A621)
- LR-N980190, Informs of One Time Rev to Commitment to Specific Provisions Contained in NRC SER to Perform Weld Root Pass Surface Nde. Instead of Volumetric Exam on Pressure Boundary,Asme Class 3 Component Was Performed,Per Requirements of 10CFR50.59 + (ML18106A622)
- ML18106A623 + (ML18106A623)
- ML18106A624 + (ML18106A624)
- ML18106A625 + (ML18106A625)
- ML18106A626 + (ML18106A626)
- ML18106A627 + (ML18106A627)
- ML18106A628 + (ML18106A628)
- ML18106A629 + (ML18106A629)
- ML18106A631 + (ML18106A631)
- ML18106A632 + (ML18106A632)
- ML18106A633 + (ML18106A633)
- ML18106A634 + (ML18106A634)
- ML18106A635 + (ML18106A635)
- ML18106A636 + (ML18106A636)
- ML18106A637 + (ML18106A637)
- ML18106A638 + (ML18106A638)
- ML18106A639 + (ML18106A639)
- ML18106A640 + (ML18106A640)
- 05000272/LER-1998-010, :on 931019,reactor Pressure Vessel Insp Plugs Were Out of Configuration,Was Noted.Caused by Personnel Error.Proper Configuration Was Restored Shortly After Discovery Prior to Entering Mode 2 + (ML18106A642)
- 05000311/LER-1998-006, :on 980227,determined Incorrect Scaling Error of First Stage Pressure Transmitter Existed.Caused by Human Error.Revised Setpoint Calculation SC-MS002-01 & Revised Associated Instrument Calibr Database Info + (ML18106A643)
- LR-N980270, Informs That Salem TS Surveillance Improvement Project (Tssip) Completed Phase 2 Review of 1,185 of 1,293 TS Implementing Procedures as of End of Dec 1997.As of 980520, Review of All 108 Remaining Procedures Completed + (ML18106A644)
- ML18106A646 + (ML18106A646)
- 05000272/LER-1998-011, :on 980505,improper Isolation of Single Cell Battery Charger from 125 Vdc Battery Was Noted.Caused by Inadequate 10CFR50.59 Applicability Review.Placed Procedure SC.MD-CM.ZZ-0024(Q) on Administrative Hold + (ML18106A647)
- LR-N980230, Notifies NRC of Plans to Implement Rev 2 of MPR-1807/NEDC-32719 as Response to GL 96-05 for Salem & Hope Creek Generating Stations.Specific Items in Pse&Gs Continue to Be Applicable + (ML18106A648)
- ML18106A649 + (ML18106A649)
- LR-N980286, Submits Annual Fuel Clad Temp Rept,Iaw Requirements of 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp for Salem Generating Station Large & Small Break LOCA Analyses + (ML18106A650)
- ML18106A651 + (ML18106A651)
- ML18106A652 + (ML18106A652)
- LR-N98-0293, Monthly Operating Rept for May 1998 for Salem Unit 2 + (ML18106A653)
- LR-N98-0292, Monthly Operating Rept for May 1998 for Salem Unit 1 + (ML18106A654)
- ML18106A655 + (ML18106A655)
- ML18106A656 + (ML18106A656)
- LR-N980227, Forwards Revised TS Bases Pages for Sections 3/4.1.3, 3/4.1.2,3/4.5.5 & 3/4.9.1.Revised Bases Pages Were Reviewed Through 10CFR50.59 Process by Station Operations Review Committee & Approved by General Manager-Station Operations + (ML18106A660)
- ML18106A662 + (ML18106A662)
- ML18106A663 + (ML18106A663)
- LR-N980263, Informs NRC of Util Intent to Use Guidance of Improved Tech Specs Bases Section + (ML18106A664)
- LR-N980309, Submits Revised Request for Changes to QA Program for Hope Creek & Salem Generating Stations.Details Concerning Revised Proposed & Responses to NRC Staffs Questions Contained in Attcahment 1.Attachments 2 & 3 Include Revised UFSAR Pages + (ML18106A665)
- LR-N980306, Forwards Update to 980119 Transmittal,Describing Initiatives Pse&G Has & Is Taking to Maintain Focus on Safe,Reliable & Event Free Operations & to Continue Momentum Toward Goal of Top Quartile Performance + (ML18106A666)
- ML18106A667 + (ML18106A667)