Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102A920 + (ML18102A920)
- ML18102A923 + (ML18102A923)
- LR-N970181, Submits Suppl to Request for Change to TSs Section 6.0, Administrative Controls Re Salem & Hope Creek Generating Station Units 1 & 2 + (ML18102A925)
- 05000311/LER-1997-002-02, :on 970213,discovered non-seismically Qualified Pressure Switches in Auxiliary Bldg Ventilation.Caused by Pressure Switches Being Replaced w/non-qualified Pressure switches.Re-installed Qualified Switches + (ML18102A926)
- ML18102A927 + (ML18102A927)
- ML18102A928 + (ML18102A928)
- ML18102A929 + (ML18102A929)
- ML18102A930 + (ML18102A930)
- ML18102A931 + (ML18102A931)
- LR-N970124, Provides Addl Technical Info Discussed in Telcon to Support Relief from Commitment to Post Weld Heat Treat (PWHT) Weld Repairs Made to SA-351 Grade CD4MCu Matl for Svc Water Pumps at Salem & Hope Creek + (ML18102A932)
- ML18102A933 + (ML18102A933)
- IR 05000272/1996018 + (ML18102A936)
- 05000272/LER-1997-004-01, :on 970221,inadequate Surveillance Testing of Molded Case Circuit Breakers Were Identified.Caused by Instantaneous Function Not Accurately Specified in Procedure.Tssip Has Been Initiated + (ML18102A938)
- ML18102A939 + (ML18102A939)
- ML18102A941 + (ML18102A941)
- ML18102A942 + (ML18102A942)
- ML18102A943 + (ML18102A943)
- ML18102A946 + (ML18102A946)
- ML18102A947 + (ML18102A947)
- ML18102A951 + (ML18102A951)
- ML18102A953 + (ML18102A953)
- 05000272/LER-1997-006, :on 970312,determined Relays That Are Part of Logic for Opening PORVs Were Not Tested.Caused by Lack of Adequate Control for Maint of TS Surveillance Procedures. Initiated New Procedures & Revised Procedures + (ML18102A958)
- ML18102A959 + (ML18102A959)
- ML18102A960 + (ML18102A960)
- ML18102A961 + (ML18102A961)
- ML18102A962 + (ML18102A962)
- ML18102A963 + (ML18102A963)
- LR-N970219, Forwards Response to RAI Re Adequacy of TS Compliance + (ML18102A964)
- LR-N970221, Forwards RAI Re License Change Request Re Pressurizer Power Operated Relief Valves + (ML18102A965)
- ML18102A966 + (ML18102A966)
- ML18102A967 + (ML18102A967)
- ML18102A971 + (ML18102A971)
- ML18102A973 + (ML18102A973)
- ML18102A974 + (ML18102A974)
- ML18102A975 + (ML18102A975)
- ML18102A976 + (ML18102A976)
- ML18102A978 + (ML18102A978)
- LR-N970149, Application for Amends to Licenses DPR-70 & DPR-75, Increasing Cw Flow to 2550 Gpm for 31 Day Surveillance Fans Started & Operated in Low Speed + (ML18102A979)
- ML18102A980 + (ML18102A980)
- ML18102A981 + (ML18102A981)
- ML18102A982 + (ML18102A982)
- LR-N970259, Monthly Operating Rept for Mar 1997 for Salem Unit 2.W/ + (ML18102A983)
- LR-N970258, Monthly Operating Rept for Mar 1997 for Salem Unit 1.W/ + (ML18102A984)
- LR-N970257, Informs That follow-up Ltr Re Scope & Schedule of Design Bases Review,Will Be Submitted within 90 Days (Not 60 Days) of 970211 + (ML18102A985)
- LR-N970250, Informs That Util Will Be Prepared to Commence Mode Ascension for Plant Unit 2 About 970508 Based on Work Completed to Date.Restart Assessment Team Insp Requested + (ML18102A986)
- ML18102A987 + (ML18102A987)
- ML18102A989 + (ML18102A989)
- ML18102A990 + (ML18102A990)
- IR 05000272/1997004 + (ML18102A992)
- 05000311/LER-1997-003-02, :on 970319,excessive Debris in Unit Two Containment Was Caused by Poor Enforcement & Lack of Mgt Expectations Over Life of Plant,Coupled W/Poor Worker Practices.Debris Removed + (ML18102A994)
- LR-N970227, Provides Licensee Response to Safety Concerns at Salem & Reiterates Commitment to Nuclear Safety + (ML18102A995)