ML18102A943

From kanterella
Jump to navigation Jump to search
Discusses 970326 Telcon W/A Fakhar Re Arrangements Made for NRC to Conduct Insp of Maint Rule Program at Plant During Wk of 970505.Full Baseline Insp Planned for Wk of 970825
ML18102A943
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/26/1997
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
References
NUDOCS 9704010574
Download: ML18102A943 (4)


Text

. "

i March 26, 1997 Mr. Leon R. Eliason Chief Nuclear Officer & President Nuclear Business Unit Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, New Jersey 08038

SUBJECT:

MAINTENANCE RULE INSPECTIONS AT SALEM

Dear Mr. Eliason:

In a telephone conversation on March 26, 1997, with Mr. Ali Fakhar of your staff, I made arrangements for the NRC to conduct inspections of your maintenance rule program at Salem. A preliminary inspection is planned for the week of May 5, 1997 and the' full baseline. inspection is planned for the week of August 25, 1997.

The inspection objective is to evaluate your program to comply with the requirements of 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants." The inspection will be conducted using Inspection Procedure 62706,.

"Maintenance Rule." The preliminary inspection will involve two inspectors and will follow up on maintenance rule programmatic issues previously found at Hope.Creek. Depending on your schedule, this inspection may be included as part of the Restart Assessment Teani Inspection (RATI). The bciseline inspection will involve a team of at least 4 inspectors and will address the full scope of the program.

The team will require information about your program for their in-office preparation for the inspection. This information is identified in the enclosure to this letter. *Please provide this information to Mr. Stephen Barr by the week of April 21, 1997. Any additional information needed for the baseline inspection will be addressed later.

Thank you for your cooperation in this matter.. If you have any questions regarding this inspection, please contact me at (610) 337-5211 or E-mail address GWM@NRC.. GOV.

Docket Nos. 50-27 2; 50-311 9704010574 970326 PDR ADOCK 05000272 G

PDR Sincerely,

~~*~

Glenn W. Meyer,.Chief Operator Licensing and Human Performance Branch Division of Reactor Safety

      • -~
  • f. '.I

. '. )

Mr. Leon R. Eliason 2

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

A. Kirby, External Operat.ions - Nuclear D. Garchow, General Manager - Salem Operations J. Benjamin, Director - Quality Assurance & Nuclear Safety Review D. Powell, Manager, Licensing and Regulation R. Kankus, Joint Owner Affairs A. Tapert, Program Administrator M. Wetterhahn, Esquire J. Keenan, Esquire J. Isabella, Manager, Joint Generation Atlantic Electric Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways.Creek Township Public Service Comm.ission ot" Maryland Stat'e of New Jersey State of Delaware

~' *. 'J Mr. Leon R. Eliason Distribution w/encl:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP Nuclear Safety Information Center (NSIC)

J. Linville, DRP S. Barber, DRP W. Ruland, DRS N. Della Greca, DRS D. Screnci, PAO (1)

NRC Resident Inspector PUBLIC DRS File (1)

DOCUMENT NAME: A:MRl.HC 3

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" =No copy OFFICE RI/DRS RI/DRS RI/

NAME JWilliams GM eyer DATE 03/26/97 03/ /97 RI/

03/ /97

4. t'

.~* 'J REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION

  • 1.

Copy of Maintenance Rule Program and all related procedures including those relating to expert panels, PRA, risk assessments and ranking, and scoping. Also, procedures used for assessing risk when taking equipment out of service.

  • 2.

List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.

  • 3.

List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.

4.

List C?f maintenance preventable functional failures (MPFFs) for the current operating cycle with any repetitive failures identified.

  • 5.

List of risk significant and risk rankings.

6.

Assessments of risk significant and risk rankings.

  • 7.

Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems.

  • 8.

Background explanations for SSCs currently assigned to the (a)(1) category.

9.

Copy of any internal or external maintenance rule assessments.

10.

Current maintenance rule trending data.

  • 11.

Current performance criteria and goals for SSC. If PRA used, provide PRA inform at ion.

12.

Qualifications and backgrounds for Expert Panel Members.

13.

Risk Reduction Worth, Risk Achievement Worth, and Core Damage Frequency results; if applicable.

  • 14.

Copy of youi action plan/schedule for improving the maintenance rule program with current status.

Items identified with asterisk (*) are needed for in-office review prior to the preliminary inspection onsite.