Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18079B055 + (ML18079B055)
- IR 05000311/1979003 + (ML18079B057)
- ML18079B059 + (ML18079B059)
- ML18079B061 + (ML18079B061)
- ML18079B062 + (ML18079B062)
- ML18079B065 + (ML18079B065)
- ML18079B066 + (ML18079B066)
- ML18079B067 + (ML18079B067)
- ML18079B068 + (ML18079B068)
- ML18079B069 + (ML18079B069)
- ML18079B070 + (ML18079B070)
- ML18079B071 + (ML18079B071)
- ML18079B073 + (ML18079B073)
- ML18079B074 + (ML18079B074)
- ML18079B077 + (ML18079B077)
- ML18079B079 + (ML18079B079)
- IR 05000272/1979021 + (ML18079B081)
- ML18079B082 + (ML18079B082)
- ML18079B083 + (ML18079B083)
- ML18079B085 + (ML18079B085)
- ML18079B086 + (ML18079B086)
- ML18079B087 + (ML18079B087)
- ML18079B088 + (ML18079B088)
- ML18079B089 + (ML18079B089)
- ML18079B090 + (ML18079B090)
- ML18079B091 + (ML18079B091)
- 05000272/LER-1979-060, Forwards LER 79-060/03L-0 + (ML18079B093)
- ML18079B094 + (ML18079B094)
- 05000272/LER-1979-060-03, /03L-0:on 790907,several Safeguard Sys Could Not Be Reset Due to 28-volt Dc Control Power Breakers Being Tripped.Caused by 28-volt Dc Breaker Being 1-amp Breaker While Circuit Load Is Approx Two Amps + (ML18079B095)
- ML18079B096 + (ML18079B096)
- ML18079B097 + (ML18079B097)
- ML18079B098 + (ML18079B098)
- ML18079B099 + (ML18079B099)
- ML18079B102 + (ML18079B102)
- ML18079B104 + (ML18079B104)
- ML18079B105 + (ML18079B105)
- ML18079B106 + (ML18079B106)
- ML18079B107 + (ML18079B107)
- ML18079B115 + (ML18079B115)
- ML18079B116 + (ML18079B116)
- 05000272/LER-1979-061, Forwards LER 79-061/03L-0 + (ML18079B118)
- ML18079B119 + (ML18079B119)
- 05000272/LER-1979-061-03, /03L-0:on 790910,during QA Surveillance of Auxiliary Bldg,Two 4-inch Conduits Penetrating Floor Found Not Sealed or Capped & No Fire Watch Posted.Caused by Misinterpretation of Maintenance Procedure M3Y Requirements + (ML18079B120)
- ML18079B128 + (ML18079B128)
- ML18079B132 + (ML18079B132)
- RAIO-0318-59203, LLC Supplemental Response to NRC Request for Additional Information No. 157 (Erai No. 9033) on the NuScale Design Certification Application + (ML18079B134)
- ML18079B135 + (ML18079B135)
- RAIO-0318-59209, LLC Response to NRC Request for Additional Information No. 359 (Erai No. 9321) on the NuScale Design Certification Application + (ML18079B138)
- RA18-018, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.. + (ML18079B139)
- ML18079B140 + (ML18079B140)
- ML18079B142 + (ML18079B142)