IE Insp Rept 50-272/79-19 on 790524-25 & 30-31.Noncompliance Noted:Failure to Update Training Folders of Individual Operators to Show Current Training Status
ML18079B107
Person / Time
Site: Salem 
Issue date: 08/06/1979
From: Bettenhausen L, Caphton D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18079B103 List:
References
50-272-79-19, NUDOCS 7910120348
Download: ML18079B107 (7)


See also: IR 05000272/1979019

Text

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

Report No. 272/79-19

Docket No. 50-272

License No. DPR-70

Region I

Priority:

Licensee:

Public Service Electric & Gas Company

Facility Name:

Salem Generating Station - Unit 1

Inspection at: Hancock Bridge, NJ

Inspection conducted:

May 24-25 and 30-31, 1979

Inspector:

Inspector

Approved by:

No. 1, RO &*NS

Inspection Summary:

Category:

C

Inspection on May 24-25 and 30-31, 1979 .(Report 272/79-19)

Areas Inspected: Routine, unannounced inspection of training program,

including general employee training, on-the-job training for plant

staff, operator requalification training and IE Bulletin 79-10 response.

The inspection involved 25 inspector hours onsite by one NRC regional

based inspector.

Results: Of the 4 areas inspected, one item of noncompliance was

identified (Deficiency - failure to maintain adequate records for

requalification training).

I .

,-**

- 2 -

1.

Persons Contacted

Public Service Electric & Gas Co.

L. Fry, Senior Performance Supervisor

V. Gadzinski, Maintenance Supervisor

J. Gneller, Senior Performance Supervisor

.M. Herr~ll, Associate Engineer

S. Labruna, Maintenance Engineer

  • J. Lloyd, Senior Nuclear Training Specialist
  • D. Lyons, QA Specialist.
  • M. Metcalf, Station QA Staff

L. Rice, Jr., Nuclear Staff Training Assistant*

F *. Schnarr, *Station Operating Engineer

R. Silverio, Assistant to the Manager

  • J~ Stillman, Station QA Engineer
  • J~ Zupko, Chief Engineer *

Radiation Services, Inc.

A. Horrath, Contract Instructor

D~ Parks, Contract Instructor

U.S. NRC Personnel

  • T. Smith, Reactor Inspector

--*L. Norrholm, Resident Reactor Inspector

. The inspector also interviewed other licensee employees in the

course of the inspection.

  • Denotes those present at the exit interview conducted at Salem

Generating Station on .May 31, 1978.

2.

General Employee Training

a.

Program Deftnition

The inspector reviewed the licensee's procedures with respect

to the program definition requirements of:

10 CFR 50, Appendix B, Criterion II; 10 CFR 19.12; 10 CFR 73.50; and

ANSI N18.1.

The procedures set forth formal training programs

for:

new and existing employees; temporary employees;

technicians; and, craft personnel.

These programs establish

trai-ning which covers: administrative controls and procedures;

radiological health and safety; controlled access and

security; industrial safety; emergency plans and procedures;

- 3 -

and quality assurance indoctrination.

Formal training is also

provided for-female. employees on the contents of Appendix A

to Regulatory Guide 8.13.

b~

Program Participati~n

The inspector reviewed the licensee's records to assure that

the required training had been given.

In addition, the

inspector conducted interviews with certain of those individuals

whose records were reviewed.

The interviews.verified that:

the scope of the training was similar to that contained in the

licensee's records; the training as conducted was meaningful

  • to those attending; and that the areas presented were covered

accurately and sufficiently from the participants' point of

view.

Records were reviewed for and selective interviews

. *conducted with employees as listed below:

two relatively new employees;

two employees with more than one year of service; and,

two temporary employees

The inspector audited a session of the radiation worker training

presented by contractor training personnel.

No items of noncompliance or deviations were identified regard-

ing general employee training.

3.

Plant Staff Personnel Training

a.

Program Definition

The inspector reviewed the training procedures and requirements

for craft and technician training as defined in the Training

Manual, Salem Generating Station, approved*J-'anuary .22, 1979.

The

inspector determined that the Manual and Separate_Oepartment

Manuals provided for on-the-job and formal technical training

  • 1or initial and continuing training. These requi~ements are

applicable to mechanical, electrical, instrument and control,

health physics, and chemistry department craft personnel and

technicians.

No items of noncompliance or deviations were identified.

(

- 4 -

b.

P~ogra~ Implementation *

The inspector reviewed the licensee's training activities in

regard to implementation of the program defined by the above

Manuals.

The station is providing the following types of

tra*ining for personnel noted in Paragraph 3.a:

in-plant lectures of a general information nature;

in-plant courses specifically applicable to radiation

protection and chemistry technicians;

contractor presented courses for mechanical and

electrical crafts;

company-conducted apprentice training for equipment

operators, station mechanics and technical assistants;

a newly instituted basic training program for instrumen-

tation and control technicians; and,

both initial and continuing on-the-job training specific

to the individual's job classification.

No items of noncompliance or deviations were identified.

c.

Record Review and Personnel Interviews

The inspector reviewed the records for and conducted interviews

with selected employees as listed below to verify that the

required training had been conducted, that the selected

individuals did understand the information which had been

presented, and that they were able to describe how these

instructions applied to their job positions.

mechanics;

instrument and control technicians;

electricians;

chemistry and health physics technicians; and

  • --

equipment operators.

- 5 -

No items of noncompliance or deviations were identified. The

inspector had no further questions.

4.

.Requalification Training

a.

Program Review

The inspector reviewed the licensee's program with regard to

the requirements set forth in the accepted Operator Requali~

fication Program and verified that, as currently established,

the program includes the fo 11 owing:

an established, planned, continuing lecture schedule

appropriate to deficient areas identtfied by the most

recent annual exams;

lesson plani or appropriate training materials describe *

the scope and depth of selected lectures;

documentation of personnel attendance;

required reactivity control manipulations;

discussions/review's of changes in facility design,

procedures, and facility license; a~d,

review of abnormal/emergency procedures.

  • The inspector determiried that no changes have been made to
  • the program which are not in conformance with existing

regulatory requirements or commitments.

No items of noncompliance or deviations were identified *

. b.

Record Review

The inspector selected and reviewed the records of six

licensed operators to verify that each contained the following

documentation:

completed course and yearly examinations with answers;

manipulation of controls for reactivity changes required

by the program;

- 6 -

simulation and discussion of emergency/abnormal procedures

~nd responses; and,

attendance or makeup for required lectures.

Individ*ual records were reviewed for two licensed Control

Room Operators, two licensed Group Shift Supervi s.ors and two

licensed staff members ..

In the course of the records review, it was noted that

~ocumentation of the qualification card for simulation and

discussion of emergency procedures was not in individuals'

folders for 1978, as required by Training Procedure 10, NRC

Licensed Operator Requalification Program.

A review of the

Requalification Log showed that operators had received

adequate training in emergency procedures in 1978, but it was

difficult to show that all operators reviewed all emergency

procedures required in TP-10.

This is an Item of Noncompliance

at the deficiency level of severity (272/79-19-01).

The present record-keeping system for the Requalification

Training is deficient in recording the up-to-date status for

a Tl operators. in all phases of performance of the program.

A licensee representative acknowledged this* deficiency and

committed to review and revise the record-keeping system by

September 1, 1979 to assure that the records reflect current

status of training in accordance with Training Procedure 10

and regulatory requirements. This is an Unresolved Item

(272/79-19-02).

  • The present method of providing station design change infor-

mation for incorporation into the requalifi~ation training

program is informal communication.

Licensee representatives

acknowledged that this is not satisfactory*and committed to

procedure change or development to assure that design change

  • information is regularly reviewed and incorporated into the

requalification training where warranted. This is an Unresolved

ltem. (272/79-19-03).

c.

Personnel Interviews

The inspector selected and interviewed three licensed personnel.

The interviews were directed at obtaining, from these

individuals, a subjective appraisal of the content and

" '

7

effectiveness of the requalification training as presented and

to confirm that the training administered was similar to that

contained in the licensee's records.

The inspector identified no discrepancies or inconsistencies

between the. interview results and . the .1 icensee records.

No items of noncompliance or deviations were identified.*

5.

IE Bulletins

6.

Licensee action concerning IE Bul 1 etin 79-10 was reviewed by' the

inspector to verify that:

the Bulletin was forwarded to appropriate*on-site

management; ..

a review for applicability was performed; and,

information in the .licensee's response was.accurate.

.

.

The 1 i censee response dated: :May 23';*. 1'979\\iccurately ,reflects the

'information reviewed during this inspection.

Examination dates are

  • not appropriate for Salem since the annual examination is admini-

stered in quarterly segments, so that no unique date applies. The

inspector had no further questions concerning Bulletin 79-10.

Unresolved Items

Unresolved items are matters about which more information is

required in order to ascertain whether they are acceptable items,

items of noncompliance or deviations. Unresolved items disclosed

during the inspection are. discussed in Pa~agraph 4.

7.

Exit Interview

The inspector met with licensee representatives {denoted in

Paragraph 1) on May 31, 1979 at Salem Generating Station. The

purpose, scope, and findings of this inspection were presented.