Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18037A145 + (ML18037A145)
- ML18037A146 + (ML18037A146)
- ML18037A147 + (ML18037A147)
- ML18037A148 + (ML18037A148)
- 05000220/LER-1978-041-04, /04T-0 on 781220:during Impingement Sampling Only 23 Samples (22 Hourly Samples & One 2-hr Sample) Were Collected Instead of 24 Required Samples,Caused by one-time Personnel Scheduling Change + (ML18037A149)
- ML18037A150 + (ML18037A150)
- L-2017-042, 2018/02/05 NRR E-mail Capture - Request for Additional Information - Turkey Point 3 LAR 256 (EPID L-2017-0423) + (ML18037A150)
- ML18037A151 + (ML18037A151)
- IR 05000324/2017407 + (ML18037A152)
- ML18037A153 + (ML18037A153)
- ML18037A154 + (ML18037A154)
- ML18037A157 + (ML18037A157)
- ML18037A158 + (ML18037A158)
- ML18037A159 + (ML18037A159)
- ML18037A161 + (ML18037A161)
- ML18037A162 + (ML18037A162)
- 05000220/LER-1979-001-03, /03L-0 on 790218:during Performance of Surveillance,Test Flow Comparator 11 Did Not Produce Rod Block within Required Tolerance.Caused by Defective Rod Comparator.Component Replaced & Setpoint Left at 14% + (ML18037A163)
- 05000220/LER-1979-002-01, /01X-1 on 790306:during Refueling Outage While Preparing Emergency Condenser Steam Nozzle 5-NB for Replacement of safe-end,discovered Inconel Weld Was Removed from Nozzle.New Safe End Installed + (ML18037A166)
- 05000220/LER-1979-005-03, /03L-0 on 790401:during Periodic Type C Leakage Test,Valves IV-68-06,IV-201-09,IV-201-10 & IV-58.1-02 Were Found to Be in Excess of Tech Specs.Cause Unknown.Repairs Will Be Made During Outage + (ML18037A167)
- 05000220/LER-1979-010-03, /03L-0 on 790424:during Refueling Outage, Containment Vacuum Relief Valve 68 IV-10 Flange Failed Leak Rate test.O-rings Replaced on Flange + (ML18037A169)
- ML18037A170 + (ML18037A170)
- ML18037A171 + (ML18037A171)
- 05000220/LER-1979-008-03, /03L-0 on 790510:during Refueling Outage, Containment Spray Heat Exchangers 112 & 121 Failed Leak Rate Test.Caused by Tube Leaks.Tubes Plugged + (ML18037A172)
- 05000220/LER-1979-009-03, /03L-0 on 790510:during Refueling Outage,Site Operations Review Committee Failed to Review Temporary Change to Maint Procedure N1-MP-7.11 within 7-day Limit. Change Subsequently Reviewed + (ML18037A173)
- 05000220/LER-1979-012-01, /01T-0 on 790523:concrete Anchor Bolt Deficiencies & Missing Seismic Restraints Were Discovered on Class I Seismic Piping Sys.Caused by Incorrect Installation.Concrete Anchor Bolt Repair Program Will Be Completed by 791231 + (ML18037A174)
- ML18037A175 + (ML18037A175)
- 05000220/LER-1979-014-03, /03L-0 on 790319:during Refueling Outage,Core Spray Sys Snubber 40-HS-10 Found Inoperable.Caused by Worn Piston Seals on Core Spray Snubber Resulting in Loss of Fluid from Snubber.Seals Replaced & Snubber Reinstalled + (ML18037A176)
- 05000220/LER-1979-011-03, /03L-0 on 790517:during Refueling Outage, Discovered That Radiographer Received Overexposure of 3,790 Millirems for Second Quarter 1979.Cause Unknown & Under Investigation.Discussed Further in to NRC + (ML18037A177)
- 05000220/LER-1979-016, Forwards LER 79-016/03L-0 & LER 79-017/03L-0 + (ML18037A179)
- ML18037A180 + (ML18037A180)
- 05000220/LER-1979-016-03, /03L-0 on 790626:failure to Review Temporary Electrical Maint Procedure within Seven Days.Review Made & Approvals Received + (ML18037A181)
- 05000220/LER-1979-017-03, /03L-0 on 790612:containment Spray Water Intertie Valves Leaked Causing Failure of Integrated Leak Rate Test. Valves Removed,Cleaned & re-installed + (ML18037A182)
- ML18037A183 + (ML18037A183)
- ML18037A184 + (ML18037A184)
- ML18037A186 + (ML18037A186)
- ML18037A187 + (ML18037A187)
- 05000220/LER-1979-018-03, /03L-0 on 790726:vacuum Relief Sys Switch 68-12B Failed to Open at Proper Setpoint.No Cause Identified.Switch Adjusted to Proper Setpoint + (ML18037A188)
- ML18037A192 + (ML18037A192)
- ML18037A193 + (ML18037A193)
- 05000220/LER-1979-021-04, /04T-0:on 790905,noted That Analysis of Excesssive Nuclide Water Sample Concentrations Was Not Completed within 30 Days.Caused by Late Rept by Contractor & High Influx of Samples.Addl Personnel Added + (ML18037A194)
- ML18037A195 + (ML18037A195)
- ML18037A196 + (ML18037A196)
- 05000220/LER-1979-019-03, /03L-0:on 790816,during Steady State Operation, Routine Mgt Review Disclosed Failure to Complete Five Surveillance Tests on Schedule.Tests Immediately Performed & Completed.Personnel Instructed to Follow Published Schedule + (ML18037A197)
- 05000220/LER-1979-020-03, /03L-0:on 790901,during Steady State Operation, Drywell Cooler 14 Tripped & Leakage Increased to Above Five G/Minute.Caused by Cooler Tube Leak.Cooler Isolated & Returned to Acceptable Level.Shutdown Terminated + (ML18037A198)
- ML18037A199 + (ML18037A199)
- ML18037A200 + (ML18037A200)
- ML18037A201 + (ML18037A201)
- 05000220/LER-1979-013-03, /03L-1:on 790525,during Refuelling Outage,Three Instrument Surveillance Procedures Were Implemented Before Required Temporary procedure-change Signatures Were Obtained.Cause Not Stated + (ML18037A203)
- 05000220/LER-1979-022-01, /01T-0:on 790918,noted Failure to Install Seismic Constraint on Containment Spray Sys Outside Primary Containment Per Const Drawings.Initiated Design & Order to Install Constraint.Containment Spray Loop Inoperable + (ML18037A204)
- ML18037A205 + (ML18037A205)
- ML18037A206 + (ML18037A206)