Requests NRC Expand Evaluation of Proposal to Consider Encapsulating Diesel Generator 102 Control Cables Re Fire Protection SER
ML18037A201
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/27/1979
From: Dise D
NIAGARA MOHAWK POWER CORP.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 7910020494
Download: ML18037A201 (4)


Text

l,'

h REGULATORY IN VRMATION DISTRIBUTION SYS L.i (RIDS)

ACCESSION NBR:7910020494 DOC ~ DATE 79/09/27 NOTARIZED: NO DOCKET 0 FACIL:50"220 BYNAME Nine Mile Point Nuclear Stationi Unit 1E Niagara Powe 05000220 AUTH AUTHOR AFFII IATION DISEED.P. Niagar a Mohawk Power Cor p, RECIP ~ NAME RECIPIENT AFFILIATION IPPOLITOET ~ Operating Reactors Branch 3 SUBJECT; Requests NRC expand evaluation of proposal to consider encapsulating diesel generator 102 control cables re fire protection SEH, DISTRIBUTION CODE: A0060 COPIES RECEIVED:LTR TITLE: Fire Protection Information l(After ENCI. J2 SIZE: l Issuance of Op.'Lic,')

r 0 N OTES ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME t.TTR ENCL ID CODE/NAME LTTR ENCL ACTION: 05 BC INTERNAL: REG FI 02 NRC PDR 09 11 TA/EOO 12 AUX IL SYS BR 14 PLANT SYS BR 19 WAMBACH 20 MURANAKAER OELD EXTERNAL: 03 LPDR 1 04 NSIC 22 ACRS 16 1 (qy b)10 O tip TOTAL NUMBER OF COPIES REQUIRED: LTTR 37 ENCL ~o K5

'I h

'c'~ n't 1

il

NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE. N.Y. 13202/TELEPHONE (315) 474.1511 September 27, 1979 Director of Nuclear Reactor Regulation Attn: Mr. Thomas Ippolito, Chief Operating Reactors Branch 03 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Dear Mr. Ippolito:

On August 17, 1979, Niagara Mohawk responded to the Fire Protection Safety Evaluation Report for Nine Mile Point Unit 1, dated July 26, 1979. In our response, we proposed to encapsulate diesel generator 103 output cables instead of rerouting. Niagara Mohawk understands that the Nuclear Regulatory Commission is currently evaluating this proposal.

By this letter, we request that this evaluation be expanded to consider encapsulating diesel generator 102 control cables as well. These control cables can be encapsulated similar to that proposed for diesel generator 103 output cables such that three hour fire barrier protection is assured.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION D. P. Disc, Vice President - Engineering GJG:jk