ML18037A201
| ML18037A201 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/27/1979 |
| From: | Dise D NIAGARA MOHAWK POWER CORP. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7910020494 | |
| Download: ML18037A201 (4) | |
Text
l,'
h REGULATORY IN VRMATION DISTRIBUTION SYS L.i (RIDS)
ACCESSION NBR:7910020494 DOC ~ DATE 79/09/27 NOTARIZED:
NO DOCKET 0
FACIL:50"220 Nine Mile Point Nuclear Stationi Unit 1E Niagara Powe 05000220 AUTH BYNAME AUTHOR AFFII IATION DISEED.P.
Niagar a Mohawk Power Cor p, RECIP ~ NAME RECIPIENT AFFILIATION IPPOLITOET ~
Operating Reactors Branch 3
SUBJECT; Requests NRC expand evaluation of proposal to consider encapsulating diesel generator 102 control cables re fire protection
- SEH, DISTRIBUTION CODE:
A0060 COPIES RECEIVED:LTR l ENCI. J2 SIZE: l TITLE: Fire Protection Information (After Issuance of Op.'Lic,')
N r 0 ~
OTES RECIPIENT ID CODE/NAME ACTION:
05 BC INTERNAL:
REG FI 09 12 AUXIL SYS BR 19 WAMBACH OELD EXTERNAL: 03 LPDR 22 ACRS COPIES t.TTR ENCL 1
16 1
RECIPIENT ID CODE/NAME 02 NRC PDR 11 TA/EOO 14 PLANT SYS BR 20 MURANAKAER 04 NSIC COPIES LTTR ENCL (qy b)10 O
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 37 ENCL
~o tip K5
'I h
1
'c'~ n'til
NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE. N.Y. 13202/TELEPHONE (315) 474.1511 September 27, 1979 Director of Nuclear Reactor Regulation Attn:
Mr. Thomas Ippolito, Chief Operating Reactors Branch 03 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Re:
Nine Mile Point Unit 1 Docket No. 50-220 DPR-63
Dear Mr. Ippolito:
On August 17, 1979, Niagara Mohawk responded to the Fire Protection Safety Evaluation Report for Nine Mile Point Unit 1, dated July 26, 1979.
In our
- response, we proposed to encapsulate diesel generator 103 output cables instead of rerouting.
Niagara Mohawk understands that the Nuclear Regulatory Commission is currently evaluating this proposal.
By this letter, we request that this evaluation be expanded to consider encapsulating diesel generator 102 control cables as well.
These control cables can be encapsulated similar to that proposed for diesel generator 103 output cables such that three hour fire barrier protection is assured.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION D. P. Disc, Vice President - Engineering GJG:jk