Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000259/1991022 + (ML18036A317)
- ML18036A318 + (ML18036A318)
- IR 05000259/1991010 + (ML18036A319)
- ML18036A320 + (ML18036A320)
- ML18036A321 + (ML18036A321)
- ML18036A322 + (ML18036A322)
- ML18036A324 + (ML18036A324)
- ML18036A325 + (ML18036A325)
- ML18036A326 + (ML18036A326)
- ML18036A327 + (ML18036A327)
- ML18036A328 + (ML18036A328)
- ML18036A329 + (ML18036A329)
- ML18036A330 + (ML18036A330)
- ML18036A332 + (ML18036A332)
- ML18036A333 + (ML18036A333)
- ML18036A334 + (ML18036A334)
- 05000260/LER-1991-010-01, :on 910515,violation of Plant Tech Spec Occurred When LCO Expired.Caused by Inadequate Procedures. Sys Declared Inoperable,Personnel Trained & Procedures Revised + (ML18036A335)
- ML18036A336 + (ML18036A336)
- ML18036A337 + (ML18036A337)
- 05000260/LER-1991-014, :on 910629,manual Reactor Scram Occurred Due to Bulk Suppression Pool Water Temp Exceeding Tech Spec Limit.Caused by Lack of Procedural Controls.Rcic Procedure Revised + (ML18036A339)
- 05000260/LER-1991-015-01, :on 910731,HPCI Sys Did Not Fulfill Safety Function Resulting from Low Suction Pressure Condition During Fast Startup.Caused by Design Deficiency.Permanent Time Delay Relay Installed + (ML18036A340)
- ML18036A346 + (ML18036A346)
- ML18036A350 + (ML18036A350)
- ML18036A351 + (ML18036A351)
- CNL-18-013, RD-022: Clinch River Small Modular Reactor Site - Wetland Survey Report, Revision 4 + (ML18036A352)
- ML18036A356 + (ML18036A356)
- ML18036A358 + (ML18036A358)
- IR 05000259/1991029 + (ML18036A361)
- ML18036A362 + (ML18036A362)
- IR 05000259/1991300 + (ML18036A364)
- ML18036A365 + (ML18036A365)
- ML18036A367 + (ML18036A367)
- ML18036A369 + (ML18036A369)
- IR 05000259/1991027 + (ML18036A371)
- ML18036A372 + (ML18036A372)
- IR 05000259/1991028 + (ML18036A375)
- NG-18-0004, Submittal of Revision 1 to the Cyber Security Plan + (ML18036A377)
- ML18036A379 + (ML18036A379)
- 05000260/LER-1991-016-01, :on 910819,unplanned ESF Actuation Occurred. Caused by Blown Fuse Due to Failed Relay in PCIS Circuitry. Failed Relay Coil & Cleared Fuse Replaced & PCIS Signal Reset + (ML18036A380)
- ML18036A382 + (ML18036A382)
- ML18036A383 + (ML18036A383)
- ML18036A384 + (ML18036A384)
- ML18036A385 + (ML18036A385)
- ML18036A393 + (ML18036A393)
- IR 05000259/1991024 + (ML18036A394)
- ML18036A395 + (ML18036A395)
- ML18036A397 + (ML18036A397)
- ML18036A398 + (ML18036A398)
- ML18036A399 + (ML18036A399)
- ML18036A400 + (ML18036A400)
- ML18036A402 + (ML18036A402)