ACCELERATED D+'RIBUTION DEMONS7ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9110090187 DOC.DATE: 91/09/30 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME AUTHOR AFFILIATION ZERINGUE,O.J.
Tennessee Valley Authority
=-
RECIP.NAME RECIPIENT AFFILIATION
'Document Control Branch (Document Control Desk)
SUBJECT:
Confirms implementation of GE interim stability, recommendatxons specified in NRC Bulletin 88-007,Suppl 1,
"Power Oscillations in BWRs" for facility after NRC issuance of Tech Spe Amend 174 on 891005.
DISTRIBUTION CODE:
IE11D COPIES RECEIVED:LTR Q ENCL 0 SIZE:
9 TITLE: Bulletin Response (50 DKT)
NOTES:
D RECIPIENT ID CODE/NAME SANDERS,M.
ROSS,T.
INTERNAL: AEOD/DOA NRR/DET/EMEB 7E NRR/DOEA/OGCB11 NRR/DST/ 8E2 eREG PXL1+
02
~GN2 FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME HEBDON,F AEOD/DSP/TPAB NRR/DOEA/OEAB11 NRR/DREP/PEPB9D NRR/PMAS/ILRB12 RES/DSIR/EIB NSIC COPIES LTTR ENCL A
D D
R D
S NOTE TO ALL'RIDS"RECIPIENTS:
A D
D i'I EASE.. Hi=LP L'S TO REDLCE ii'ASTL.: CONTACT THE DOCUiIEiTCONTROL DESK.
'ROOii PI-.:
I.=XT. 2%
O', TO ELlillNATL YOt 'R FACIE FROXI DISTRIBI'TIOY, l I~"IS I'OI( DOCUiIEif S YOL" DOi'T FEED'.
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL
Il
Tennessee Valfey Au'.hOfny. Pos< Otlice Bcx 2000 Deca:u Ataoan'a 3560S O. J.'Ike Zedngue Vice'Presiden<arcnvr>s Pet y Opefahche SEP 30 'ty',
U-S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D-C'.
20555 Gentlemen:
In the Hatter of Tennessee Valley Authority Docket Nos. 50-259 50-260 50-296 BROWNS FERRX NUCLEAR PLANT (BFN) NRC BULLETIN 88-07, SUPPLEHENT 1
POWER OSCILLATIONS IN BOILING WATER REACTORS (BWRs)
Reference:
TVA letter, dated Jul'y 10,
- 1991, BFN Regulatory Framework for the Restart of Units I and 3
W The purpose of this letter is to,confirm that BFN has implemented the General Electric (GE) interim stability recommendations
.specified in NRC Bulletin 88-07, Supplement 1 prior to 'the restart of BFN Unit 2.
The interim stability recommendations were impl'emented for Unit 2 after NRC issuance of Technical Specification, Amendment 174. on October 5, 1989.
In the reference letter, TVA notified NRC that NRC Bulletin 88-07; Supplement 1', will be completed prior to 'the restart of Units 1 and 3.
il
U.S. Nuclear Regulatory Commission SEP 30
~gg~
There are no commitments contained in this letter. If you have any questions concerning this matter, please telephone Patrick P. Carier at (205) 729-7566.
Sincerely,
- 0. J. Zeringue CC:
NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000 4
Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regul'atory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Ih 0
'/I
!