Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000259/1979045 + (ML18024B294)
- IR 05000296/1979019 + (ML18024B295)
- ML18024B295 + (ML18024B295)
- ML18024B296 + (ML18024B296)
- ML18024B297 + (ML18024B297)
- ML18024B299 + (ML18024B299)
- ML18024B301 + (ML18024B301)
- ML18024B302 + (ML18024B302)
- ML18024B303 + (ML18024B303)
- IR 05000259/1979041 + (ML18024B305)
- ML18024B306 + (ML18024B306)
- ML18024B308 + (ML18024B308)
- ML18024B309 + (ML18024B309)
- ML18024B310 + (ML18024B310)
- ML18024B311 + (ML18024B311)
- PNO-II-79-040, on 791208,during Approach to Full Power Following Refueling Outage,Nitrogen Leak from Primary Containment Occurred.Caused by Three Loose Bolts on Equipment Hatch.Problem Corrected,Including Retesting + (ML18024B314)
- ML18024B315 + (ML18024B315)
- ML18024B317 + (ML18024B317)
- ML18024B318 + (ML18024B318)
- PNO-II-79-050, on 791230,electrical Grounds Experienced in Underground 4-kV Cables Supplying Backup Power from Cooling Tower Transformers to Shutdown Board.Unit Shut Down to Evaluate & Correct Problem + (ML18024B319)
- ML18024B321 + (ML18024B321)
- ML18024B322 + (ML18024B322)
- 05000296/LER-1979-021, Supplemental LER 79-021/01T-1:on 791208,following Return to Svc After Refueling Outage,Primary Containment Pressure Would Not Stabilize.Caused by Leaking Due to Unevenly Tightened Bolts.New Controls & Hatch Lock to Be Used + (ML18024B323)
- ML18024B324 + (ML18024B324)
- ML18024B325 + (ML18024B325)
- ML18024B326 + (ML18024B326)
- ML18024B328 + (ML18024B328)
- IR 05000259/1979030 + (ML18024B330)
- ML18024B331 + (ML18024B331)
- ML18024B338 + (ML18024B338)
- ML18024B339 + (ML18024B339)
- 05000296/LER-1980-002, Forwards LER 80-002/03L-0 + (ML18024B340)
- ML18024B341 + (ML18024B341)
- 05000296/LER-1980-002-03, /03L-0:on 800117,while Performing Surveillance Instruction 4.5.B.1.d,residual Heat Removal Sys Flow Control Valve FCV.74-73 Tripped in mid-position.Caused by Valve Stem Lubricant Losing Lubricity,Causing Force on Motor + (ML18024B342)
- ML18024B343 + (ML18024B343)
- ML18024B344 + (ML18024B344)
- ML18024B345 + (ML18024B345)
- ML18024B347 + (ML18024B347)
- ML18024B349 + (ML18024B349)
- ML18024B350 + (ML18024B350)
- ML18024B351 + (ML18024B351)
- ML18024B352 + (ML18024B352)
- ML18024B353 + (ML18024B353)
- 05000296/LER-1980-003, Forwards LER 80-003/03L-0 + (ML18024B354)
- ML18024B355 + (ML18024B355)
- 05000296/LER-1980-003-03, /03L-0:on 800126,while Performing Control Rod Exercise,Control Rod 18-55 Would Not Insert W/Normal Drive Pressure.Caused by Failed Seal in Hydraulic Control Unit Directional Control Valve.Valve Repaired + (ML18024B356)
- 05000260/LER-1980-004, Forwards LER 80-004/03L-0 + (ML18024B357)
- ML18024B358 + (ML18024B358)
- 05000260/LER-1980-004-03, /03L-0:on 800122,reactor Water Level Switch LIS-3- 203D Switch 2 Exceeded Tech Spec Limit During Normal Operation.Caused by Model 288A Switch Drifting Above Setpoint.Switch Tested,Inspected & Recalibr + (ML18024B359)
- ML18024B360 + (ML18024B360)
- 05000260/LER-1980-005, Forwards LER 80-005/03L-0 + (ML18024B361)