- 05000400/LER-1997-017, :on 970612,failed to Recognize Inoperable Reactor Afd Monitor.Caused by Personnel Error.Operators Involved in Event Will Be Counseled Prior to Assuming Shift Duties + (ML18012A829)
- HNP-97-132, Forwards Response to Violations Noted in Insp Rept 50-400/97-04.Corrective Actions:New Operations Mgt Team Has Been Put in Place & re-evaluation Was Also Conducted for Current Supervisory Assignments + (ML18012A831)
- HNP-97-142, Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant + (ML18012A832)
- PNO-II-97-040, on 970720,automatic Reactor Trip Occurred Due to Main Generator Lockout.Main Generator Lockout Caused by Loss of Generator Excitation Caused by Electrical Fault in Exciter.Afws Automatically Started as Expected + (ML18012A833)
- HNP-97-136, Notifies NRC of Schedule Change for Util Conversion to Improved Std TS for Hnp.Nrc License Amend Issuance Will Be Requested by July 2000 + (ML18012A834)
- HNP-97-149, Forwards LER 97-S01-00,describing Instances Involving Contract Outage Workers Being Inappropriately Granted Access at Plant During Refueling Outage 7 + (ML18012A835)
- ML18012A836 + (ML18012A836)
- ML18012A837 + (ML18012A837)
- ML18012A838 + (ML18012A838)
- ML18012A839 + (ML18012A839)
- ML18012A841 + (ML18012A841)
- ML18012A842 + (ML18012A842)
- HNP-97-147, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-01.Corrective Actions:Seven Doors Were Alarmed & Ten Doors Were Locked Requiring Operations Approval of Breach Request Prior to Blocking Open + (ML18012A843)
- ML18012A844 + (ML18012A844)
- HNP-97-152, Forwards 120-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (ML18012A845)
- HNP-97-148, Submits Change in Schedule for Completion of Corrective Actions Made in Response to Violation Noted in Insp Rept 50-400/96-06 + (ML18012A846)
- 05000400/LER-1997-018, :on 970701,determined That Plant Procedures Had Not Received Proper Reviews & Approvals.Caused by Failure to Comply W/Plant Administrative Procedure AP-006.Counseled Involved Individuals + (ML18012A847)
- HNP-97-155, Forwards Proprietary Info Re Notification of Change in Reactor Operator Status.Encl Withheld Per 10CFR2.790(a)(6) + (ML18012A848)
- HNP-97-146, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/97-06.Corrective Actions:Compliance Was Achieved on 970608 W/Issuance of Operations Night Order + (ML18012A852)
- 05000400/LER-1996-013-02, Forwards LER 96-013-02 Per 10CFR50.73.Rev Reports Results of Addl Analysis That Was Performed to Determine Safety Consequences Associated W/Potential Loss of Ccws + (ML18012A853)
- ML18012A854 + (ML18012A854)
- 05000400/LER-1996-013, :on 961028,condition Outside of Design Basis Where RWST Had Been Aligned w/non-seismically Qualified Sys Was Identified.Caused by Failure to Reconcile Operating Procedure Lineups.Established Administrative Controls + (ML18012A855)
- 05000400/LER-1996-018-01, Forwards LER 96-018-01 Per 10CFR50.73.Rev Provides Addl Info Related to Cause of a Normal Svc Water Pump Trip That Occurred on 960903,following Loss of Running Normal Svc Water Pump + (ML18012A856)
- ML18012A857 + (ML18012A857)
- 05000400/LER-1996-018, :on 960903,manual Reactor Trip Occurred Due to Loss of Normal Sw.Caused by Mechanical Failure of B Water Pump & a Normal SW to Remain Running Once Manually Started.Restored a Normal SW Pump to Svc + (ML18012A858)
- HNP-97-161, Monthly Operating Rept for July 1997 for Shnpp + (ML18012A859)
- ML18012A860 + (ML18012A860)
- ML18012A862 + (ML18012A862)
- ML18012A863 + (ML18012A863)
- 05000400/LER-1997-019, :on 970720,turbine Trip/Reactor Trip Occurred. Caused by Three Phase Fault That Collapsed Excitation Field in Main Generator,Resulting in Generator Lockout.Exciter Rotor Assembly Was Replaced + (ML18012A864)
- HNP-97-163, Forwards Exercise Scenario W/Controller Info & Simulation Data for HNP Emergency Preparedness Exercise Scheduled for 971007.Package Reflects Change to Exercise Objectives Previously Submitted in .W/O Encl + (ML18012A865)
- HNP-97-162, Forwards Response to Violations Noted in Insp Rept 50-400/97-04.Corrective Actions:Missile Shield Blocks Were Reinstalled on 970406 within Time Require by Action Statement + (ML18012A866)
- IR 05000400/1997006 + (ML18012A867)
- 05000263/LER-1917-006, Regarding Loss of Reactor Protection System Scram Function During Main Steam Isolation Valve and Turbine Stop Valve Channel Functional Tests Due to Use of a Test Fixture + (ML18012A868)
- ML18012A869 + (ML18012A869)
- ML18012A871 + (ML18012A871)
- HNP-97-167, Forwards Proprietary Notification of Changes in Reactor Operator & SRO Status.Encl Withheld,Per 10CFR2.790(a)(6) + (ML18012A873)
- HNP-97-170, Provides Closeout Documentation Harris Nuclear Plant Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. Plant Will Restore Thermo-Lag Barrier Configurations to Svc & Discontinue Compensatory Actions Accordingly + (ML18012A877)
- ML18012A878 + (ML18012A878)
- ML18012A879 + (ML18012A879)
- ML18012A880 + (ML18012A880)
- ML18012A881 + (ML18012A881)
- ML18012A882 + (ML18012A882)
- ML18012A884 + (ML18012A884)
- ML18012A886 + (ML18012A886)
- ML18012A887 + (ML18012A887)
- ML18012A897 + (ML18012A897)
- ML18012A900 + (ML18012A900)
- 3F0118-02, 30-Day Spent Fuel Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pools + (ML18015A006)
- NOC-AE-18003540, Submittal of Revised Operations Quality Assurance Plan + (ML18015A007)
- ML18015A007 + (ML18015A007)