Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-95-169, Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Per Selected Line Items from NRC GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation + (ML17353A281)
- ML17353A282 + (ML17353A282)
- ML17353A283 + (ML17353A283)
- L-95-205, Monthly Operating Repts for June 1995 for Turkey Point Units 3 & 4.W/950713 + (ML17353A284)
- ML17353A285 + (ML17353A285)
- ML17353A288 + (ML17353A288)
- L-95-219, Forwards fitness-for-duty Program Performance Data for Six Month Period Ending 950630,per 10CFR26.71(d) + (ML17353A292)
- L-95-201, Design Defect in Safeguards Bus Sequencer Logic Timing Places Both Units Outside Design Basis + (ML17353A293)
- ML17353A294 + (ML17353A294)
- 05000250/LER-1994-005, :on 941103,both Units Outside Design Basis Due to Design Defect in Safeguards Bus Sequencer Test Logic. Resumed Monthly Manual Testing of Sequencer + (ML17353A295)
- ML17353A296 + (ML17353A296)
- ML17353A297 + (ML17353A297)
- L-95-212, Updates Response Re Westinghouse SG Mechanical Tube Plugs Fabricated from Thermally Treated Alloy 600 Material + (ML17353A298)
- PNO-II-95-046D, on 950801,both Units to Plant Had Been Placed in Mode 3 in Anticipation of Hurricane Erin.All Hurricane Warnings Have Been Discontinued.Region II Continues to Monitor Conditions at Plant + (ML17353A300)
- PNO-II-95-046E, on 950802,Region II Exited Monitoring Mode for Hurricane Erin Which Was Downgraded to Tropical Storm. Region Continued to Track Progress of Storm & Resident Inspectors Onsite Monitored Licensee Activities + (ML17353A301)
- PNO-II-95-046A, on 950731,plants Made Preparations for Anticipation of Hurricane Erin W/Shutting Down of St Lucie Unit 2.Region II Personnel Sent to Turkey Point Site to Augment Staff & All Four Emergency Diesels Tested + (ML17353A302)
- PNO-II-95-046C, on 950801,both Units to Plant Had Been Shutdown in Anticipation of Hurricane Erin.Open Communication Line Will Be Established Upon Arrival of Hurricane Winds + (ML17353A303)
- PNO-II-95-046, on 950731,util Declared Notification of Unusual Event Upon Declaration of Hurricane Warning for Southeastern Florida.Reviewed Procedures & Plant Status to Prepare for Hurricane.Dispatched Er Vehicle & Staff to Site + (ML17353A304)
- PNO-II-95-046B, on 950801,both Units to Plant Will Be Shutdown in Anticipation of Hurriance Erin.Region II Personnel Closely Tracking Hurricane Progress Throughout Incident Response Ctr + (ML17353A305)
- ML17353A306 + (ML17353A306)
- IR 05000250/1995011 + (ML17353A309)
- ML17353A312 + (ML17353A312)
- L-95-224, Responds to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (ML17353A314)
- L-95-206, Submits Request for Schedular Exemption from Requirements of 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors + (ML17353A315)
- ML17353A316 + (ML17353A316)
- ML17353A317 + (ML17353A317)
- IR 05000250/1995014 + (ML17353A320)
- L-95-229, Monthly Operating Repts for Jul 1995 for Turkey Point Units 1 & 2 + (ML17353A321)
- ML17353A329 + (ML17353A329)
- ML17353A330 + (ML17353A330)
- IR 05000250/1995013 + (ML17353A332)
- ML17353A335 + (ML17353A335)
- ML17353A336 + (ML17353A336)
- ML17353A343 + (ML17353A343)
- ML17353A344 + (ML17353A344)
- L-95-235, Forwards Response to NRC 941012 RAI Re Outdoor Exemption for Thermo-Lag 330-1 Fire barriers.W/25 Oversize Drawings + (ML17353A346)
- ML17353A347 + (ML17353A347)
- L-95-247, Requests for Exemption from Type a Testing Interval Specified in 10CFR50,App J for Plant + (ML17353A348)
- L-95-041, Informs NRC That Util Intends to Terminate Boraflex Coupon Surveillance Testing Program While Continuing Blackness Testing of Plant Spent Fuel Pool Boraflex Panels + (ML17353A349)
- L-95-207, Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 10.1 from GL 93-05, Line-Item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation & Guidance in GL 94-01 + (ML17353A351)
- ML17353A352 + (ML17353A352)
- ML17353A353 + (ML17353A353)
- L-95-255, Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4 + (ML17353A354)
- ML17353A355 + (ML17353A355)
- L-95-249, Forwards COLR for Turkey Point Unit 3 + (ML17353A356)
- ML17353A357 + (ML17353A357)
- ML17353A358 + (ML17353A358)
- 05000250/LER-1995-005-01, :on 950818,containment Pressure Testing Procedure Resulted in Inhibiting Both Trains of Containment Pressure from Initiated Esf.Revised Procedure to Require Testing of Each Train Separately + (ML17353A360)
- ML17353A363 + (ML17353A363)
- ML17353A364 + (ML17353A364)
- ML17353A366 + (ML17353A366)