ML17353A288
| ML17353A288 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 07/28/1995 |
| From: | Croteau R, Norris J NRC (Affiliation Not Assigned) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 9508030048 | |
| Download: ML17353A288 (5) | |
Text
gP,R 4800 P
Cy (4
I O
9 Y.
~O
+a*++
~
~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 28, 1995 Mr. J.
H. Goldberg President - Nuclear Division Florida Power and Light Company Post Office Box 14000 Juno
- Beach, Florida 33408-0420
SUBJECT:
RE(VEST FOR INFORMATION
Dear Mr. Goldberg:
The Nuclear Regulatory Commission (NRC) received information regarding computer software that could be in use at your facility.
The elements of the concern are provided for your review.
The safety significance is not known as it would depend on the application at your nuclear power plant.
We request that you review the information in the enclosure to this letter and provide responses to the NRC.
The enclosure to this letter should be controlled, with distribution limited to personnel with a "need-to-know" until your review has been completed and evaluated by the NRC.
The enclosure is considered as Exempt from Public Disclosure in accordance with Title 10 of the Code of Federal Re ulations (10 CFR), Part 2.790(a).
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, excluding the enclosure, will be placed in the NRC Public Document Room.
Please submit your response to us within 60 days of the receipt of this letter.
We also request that your response contain no personal
- privacy, proprietary, or safeguards information so it can be released to the public and placed in the NRC Public Document Room.
If necessary, such information shall be contained in a separate attachment which will be withheld from public disclosure.
The information collections contained in this request are covered by the Office of Management and Budget clearance number 3150-0011, which expires July 31, 1997.
The public reporting burden for this collection of information is estimated to average 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data
- needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Informatioo and Records Management Branch (T-6 F33),
U. S. Nuclear Regulatory Commission, Washington, D.C.,
- 20555, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011),
Office of Management and Budget, Washington, D.C. 20503.
95080300g8
<<y507PB W~-
j PDR ADQCK>> 05000250 P
'DR j
ro
'io
'mg) jstt<B<<+
Mr. J.
H. Goldberg July 28, 1995 Your cooperation is appreciated.
Should you have any questions regarding this
- matter, please contact the NRC project manager.
(Original Signed by J. Norris.for)
Richard P. Croteau, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor, Regulation I
Docket Nos.
50-335, 50-389 50-250, 50-'51
Sincerely, (Original Signed By)
Jan A. Norris, Sr. Project Manager Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
As stated ll j
1 cc w/o enclosure:
See,n'ext Distribution Docket File
'UBLIC w/o eno'losurj PDII-1 RF SVarga JZwolinski OGC ACRS (4)
DVerrel,li,. RII FILENAME G: HINDUS page t't ID, 1t l
l ll tt t OFFICE LA:PDI I-1 PM:
-1 P.
-1 D'PD NAME EDunnin ton RC o
a Nor i DMat ews DATE 07/27/95 07 e'7 95 0 0 95 07 95 COPY e /No Yes No es o
OFFICIAL ECORD COPY Yes o
1>
ir f
i (
m "I,
g l'ig I
Mr. J.
H. Goldberg Your cooperation is appreciated.
Should you have any questions regarding this
- matter, please contact the NRC project manager.
Sincerely, Ri'qhard P.
Cro eau, Project Manager 5/
Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket Nos. 50-335, 50-389 50-250, 50-251
Enclosure:
As stated orris, Sr. Project Manager t Directorate II-1 Jan A
Proje Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc w/o enclosure:
See next page
Florida Power and Light C
ny cc:
Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature ill West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy AIA Jensen
- Beach, Florida 34957 Hr. Joe Myers, Director Div. of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 J.
R.
- Newman, Esq.
- Morgan, Lewis 5 Bockius 1800 H Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Hr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Hiami, Florida 33102 Hr. Thomas R.L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Hr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 C. L. Burton Plant General Manager St. Lucie Nucleat Plant P.O.
Box 128 Ft. Pierce, Florida 34954-0128 Hr. Edward J.
Weinkam Licensing Manager Turkey Point Nuclear Plant P.O.
Box 4332 Princeton, Florida 33032-4332 Hr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Regional Administrator, RII U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Hr. H. N. Paduano, Manager Licensing 5 Special Programs Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420 Hr. J.
H. Goldberg President - Nuclear Division Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420 Hr. D. A. Sager Vice President St. Lucie Nuclear Plant P.O.
Box 128 Ft. Pierce, FL 34954-0218 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.
Box 1448 Homestead, Florida 33090 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami; Florida 33128