Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-92-175, Monthly Operating Repts for May 1992 for Turkey Point Units 1 & 2 + (ML17349A273)
- 05000251/LER-1992-006, :on 911029,AFW Pumps Autostarted Following Trip of Only Operating MFW Pump for Unit 4.Caused by Trip of 4A MFW Pump Upon Loss of Suction Pressure.Condensate Polishing Sys Bypassed + (ML17349A276)
- ML17349A277 + (ML17349A277)
- ML17349A278 + (ML17349A278)
- ML17349A280 + (ML17349A280)
- IR 05000250/1992007 + (ML17349A281)
- L-92-185, Forwards Request for Relief from ASME Code for Repair of Code Class 2 Piping in Order to Perform Temporary Repair of Small Leak Discovered on 1/2-inch Main Steam Drain Line on Steam Header 4A + (ML17349A283)
- ML17349A284 + (ML17349A284)
- L-92-173, Responds to Violations Noted in Insp Repts 50-250/92-10 & 50-251/92-10.Corrective Actions:Instrument & Control Maint Initial & Continuing Training Programs Revised to Incorporate self-checking + (ML17349A285)
- L-92-174, Forwards Response to Rev 1 to Generic Ltr 92-01 Re Reactor Vessel Integrity.Encl Info Provides Addl Info to Support Response Provided in BAW-2166 + (ML17349A288)
- L-92-187, Forwards Rept of Unsatisfactory Performance Testing Incident,Per 10CFR26.Rept Details Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Cause & Corrective Actions.Rept Withheld + (ML17349A289)
- ML17349A292 + (ML17349A292)
- ML17349A298 + (ML17349A298)
- IR 05000250/1992014 + (ML17349A300)
- L-92-206, Forwards Revised Request for Relief from ASME Code Repair Requirements for Engineered Mechanical Clamp on Main Steam Drain Line Piping Elbow to Perform Temporary Repair + (ML17349A302)
- 05000250/LER-1992-006, :on 920610,discovered That Recirculation of Waste Monitor Tank,Prior to Liquid Release,Not Conducted Per TS & Tank Recirculated to Less than One Tank Vol.Caused by Overestimation of Flow Rate.Calibrs Verified + (ML17349A303)
- L-92-193, Provides Response to NRC Request for Addl Info Re Low Upper Shelf Toughness Fracture Analysis of Reactor Vessels for Load Level a & B Conditions + (ML17349A304)
- L-92-203, Special Rept:Three Surveillance Tendons,Inspected on 920612, 19 & 29 Found W/Measured Normalized lift-off Force Below Predicted Lower limit.Lift-off Forces Restored to Required Level of Integrity.Addl Rept Will Be Sent by 920915 + (ML17349A305)
- L-92-205, Monthly Operating Repts for June 1992 for Turkey Point Units 1 & 2 + (ML17349A306)
- L-92-186, Confirms Completion of Performance Enhancement Program.Ltr Updates Info Provided in + (ML17349A308)
- ML17349A310 + (ML17349A310)
- ML17349A311 + (ML17349A311)
- L-92-218, Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Damage. Thermo-Lag 330 Fire Barrier Sys Not Installed at Facilities + (ML17349A312)
- ML17349A313 + (ML17349A313)
- L-92-208, Forwards Rev to Description of 920519 Application for Amends to Licenses DPR-31 & DPR-41,changing TS 6.0 Re Administrative Controls to Reflect Present Organizational Titles & Delete Specific Title Designations + (ML17349A314)
- ML17349A315 + (ML17349A315)
- L-92-215, Forwards Response to NRC 920629 RAI on Proposed License Amends, & 0519 Re 480 Volt Load Centers Degraded Voltage Protection Scheme + (ML17349A316)
- ML17349A318 + (ML17349A318)
- ML17349A319 + (ML17349A319)
- ML17349A320 + (ML17349A320)
- IR 05000250/1992010 + (ML17349A321)
- L-92-223, Special Rept:On 920706,hoop Tendon Group Found to Have Measured Normalized lift-off Force Below Predicted Lower Limit.Cause Under investigation.Lift-off Forces in Tendons 42H31,42H32 & 42H33 Restored to Required Level + (ML17349A322)
- ML17349A324 + (ML17349A324)
- ML17349A328 + (ML17349A328)
- ML17349A331 + (ML17349A331)
- ML17349A332 + (ML17349A332)
- ML17349A333 + (ML17349A333)
- ML17349A335 + (ML17349A335)
- L-92-227, Monthly Operating Repts for Jul 1992 for Turkey Point Units 3 & 4 + (ML17349A336)
- ML17349A337 + (ML17349A337)
- 05000250/LER-1992-007, :on 920716,discovered That Valve & Motor Operator Position for RWST Outlet Valve Not Verified When Unit in Mode 5 or 6.Caused by Less than Adequate Procedure.Checkoff Procedure Revised + (ML17349A338)
- 05000250/LER-1992-008, :on 920723,discovered That Analog Channel Operational Test for Overpressure Mitigation Sys Did Not Check & Adjust Setpoint,Per TS 4.4.9.3.1.Caused by Inadequate Procedure.Procedures Revised + (ML17349A339)
- ML17349A340 + (ML17349A340)
- ML17349A343 + (ML17349A343)
- L-92-204, Forwards Engineering Evaluation for Verification of PSB-1 Computer Model for Setting of Undervoltage Relays, Per NRC Issuing Amends 145 & 140 to Licenses DPR-31 & DPR-41,respectively & RAI + (ML17349A348)
- ML17349A349 + (ML17349A349)
- ML17349A350 + (ML17349A350)
- ML17349A351 + (ML17349A351)
- ML17349A353 + (ML17349A353)
- ML17349A354 + (ML17349A354)
- ML17349A355 + (ML17349A355)