ACCELERATED DISTjUBUTION DEMONSTPATION SYSTEM REGULATO INFOILMATION DISTRIBUTION TEM (RIDE)
ACCESSION NBR:9207210338 DOC.DATE: 92/07/16 NOTARIZED: NO DOCKET ¹ FACIE:50-?50 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250
- b0-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Confirms completion of performance enhancement program.Ltr updates info provided in 891221 ltr.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:NRR RAGHAVAN,L NRR RAGHAVAN,L 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICBBH7 NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB EXTERNAL: NRC PDR NOTES:
COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB 8E 0
B REG F
01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISP) FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 16
P.O. Box 029100, Miami, FL, 33102-9100 JUL16m L-92-186 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4 Dockets No. 50-250 and 50-251 Performance Enhancement Pro ram The purpose of this letter is to confirm the completion of the Florida Power and Light Company (FPL) Performance Enhancement Program (PEP). This letter updates information provided in FPL letter L-89-397, dated December 21, 1989.
PEP, as outlined in an FPL letter dated April 11, 1984, and confirmed by NRC Confirmatory Order EA-84-55, dated July 13, 1984, is complete.
Thc details of that completion were provided to NRC Region II personnel during an audit conducted at FPL's corporate Nuclear Division headquarters on June 15, 1992. A review of the Nuclear Regulatory Commission inspection report record for Turkey Point Units 3 and 4 subsequent to April 1984 confirms that all items required by the Confirmatory Order have been inspected and found to be complete.
An attachment lists each of the PEP projects and the NRC closure Inspection Report.
The closure documentation for these items is available for review on site.
The overall operations, maintenance, and management concepts which began with PEP have been included as part of the normal plant operating philosophy.
Ifthere are any questions please contact us.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk Attachment cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant
<-92072I0338 9207ih i PDR'ADOCK 05000250 p
PDR an Fpl Group company
~ 9' I
I I
F r.,
~
)
">so'3J k
t
, 186 Page 1
Attachment Performance Enhancement Program Closure PEP Project Number Detail Inspection Report Number Site Facility Upgrade Operations Enhancement Procedures Configuration Control Program Training.
Management Action Plan Licensing IR 8940 IR 89-40 IR 89-41 IR 8941 IR 89<1 IR 89-203 IR 91-07 IR 89A1 IR 90-18 IR 91-20 IR 89-41 IR 89-44 IR 89-41 IR 89-44 IR 91-20 Quality Assurance and Quality Control IR 89-41 IR 89-44 10 Maintenance Management System Technical Specification Upgrade New Technical Specifications Implemented August 28, 1991.
Operability of Safety Systems IR 89-44 IR 89-48 NRC SER dated August 28, 1990 IR 89-41 G:XLICENSEXRCGXMILESTON.STS