Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-347, Advises That NUREG-0737,Item II.D.1.B, PWR Relief & Safety Valve Testing Is Satisfied by Submittal of PORV Block Valve Info Package & Listed Info + (ML17341B344)
- L-82-349, Advises That Final Heat Tracing Components Necessary for Completion of Containment Hydrogen Monitor,Per NUREG-0737, Item II.F.1.6,received from Manufacturer on 820801.Estimated Completion of Installation Rescheduled Until 820930 + (ML17341B345)
- L-82-342, Application for Amend of Licenses DPR-31 & DPR-41,changing Tech Specs 6.5.2.3,6.5.2.4,6.5.2.5,6.5.2.6 & Figure 6.2-1 to Update Offsite Organization + (ML17341B346)
- ML17341B347 + (ML17341B347)
- ML17341B348 + (ML17341B348)
- ML17341B357 + (ML17341B357)
- ML17341B359 + (ML17341B359)
- ML17341B360 + (ML17341B360)
- ML17341B361 + (ML17341B361)
- L-82-382, Forwards Comparison of Design Basis Max Fast Neutron Flux W/Actual Eight Cycle Average Flux Distribution at Reactor Pressure Vessel Inner Radius.Suppls 820503 Response to 820316 Request for Addl Info + (ML17341B362)
- L-82-398, Requests That Last Sentence in Final Paragraph of 820810 Proposed Mod to Turbine Runback Sys Be Replaced W/Listed Sentence + (ML17341B363)
- ML17341B364 + (ML17341B364)
- L-82-403, Application to Amend Licenses DPR-31 & DPR-41,revising App a to Radiological Effluent Tech Specs Per NUREG-0472.Offsite Dose Calculation Manual for Gaseous & Liquid Effluents Forwarded + (ML17341B370)
- ML17341B371 + (ML17341B371)
- ML17341B372 + (ML17341B372)
- ML17341B373 + (ML17341B373)
- L-82-405, Forwards Inservice Insp Rept Per 820422 Commitment.Rept Consists of Class 1 & 2 Summary Exam Tables for Third Period of Program + (ML17341B374)
- ML17341B375 + (ML17341B375)
- ML17341B376 + (ML17341B376)
- L-82-389, Forwards Responses to Questions Re Adequacy of Station Electric Distribution Sys Voltages,Per 820809 Telcon. Explanation of Compliance W/General Design Criteria 17 Encl + (ML17341B377)
- L-82-388, Forwards Final Response to NUREG-0737,Item II.D.1 Re PWR Relief & Safety Valve Testing.Evaluations of Pressurizer Safety Valves & Pressurizer Safety & Relief Piping Encl + (ML17341B378)
- ML17341B379 + (ML17341B379)
- L-82-361, Forwards Public Version of Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20105 Re Onsite Support Ctrs & 20106 Re Natural Emergencies + (ML17341B381)
- L-82-407, Forwards Response to Request for Addl Info Re Purge & Vent Valve Operability + (ML17341B382)
- ML17341B389 + (ML17341B389)
- ML17341B390 + (ML17341B390)
- ML17341B392 + (ML17341B392)
- ML17341B400 + (ML17341B400)
- L-82-413, Forwards Response to NRC Requesting Addl Info Re Environ Qualification of TMI Action Items Contained in NUREG-0737 + (ML17341B402)
- ML17341B403 + (ML17341B403)
- L-82-423, Forwards Revised Schedule for Providing Final Response Re Control of Heavy Loads on Guideline 4 (Special Lifting Devices) & Guideline 7 (Crane Design).Only Manufacturers Can Obtain Requested Info + (ML17341B404)
- ML17341B411 + (ML17341B411)
- 05000250/LER-1982-012, Forwards LER 82-012/01T-0 + (ML17341B412)
- ML17341B415 + (ML17341B415)
- L-82-435, Revised Application for Amends 87 & 81 to Licenses DPR-31 & DPR-41,respectively,correcting Typographical Errors Re DHR Sys + (ML17341B416)
- ML17341B417 + (ML17341B417)
- ML17341B418 + (ML17341B418)
- ML17341B419 + (ML17341B419)
- ML17341B422 + (ML17341B422)
- L-82-412, Forwards Public Version of Emergency Plan Implementing Procedures 20104, Emergency Roster, 20101, Duties of Emergency Coordinator, 20107, Fire/Explosion Emergencies & 20127 Duties of Assembly Area Supervisor + (ML17341B424)
- L-82-436, Advises That Util Review of Current Nuclear Plant Staff Working Hours Indicates That Overtime Restrictions Meet Intent of Revised NRC Policy.Requirements Incorporated in Administrative Procedures & Need Not Be Added to Tech Specs + (ML17341B425)
- L-82-438, Extends Invitation to Observe 821019 Demonstration of Emergency Response Sys at Technology for Energy Corp,Knoxville,Tn + (ML17341B426)
- L-82-437, Forwards Payment of Proposed License Amend Fee Re Redundancy in RHR Sys + (ML17341B427)
- L-82-445, Advises That Procedures/Plans Submitted for Unit 3 for Steam Generator Repair Project Apply to Unit 4 & Need Not Be Resubmitted + (ML17341B428)
- L-82-451, Forwards Util Containing Payment of License Amend Fee Re Redundancy in RHR Sys Requested in NRC + (ML17341B429)
- L-82-452, Forwards Revision 1 to 10CFR50 App R Fire Protection Review. Revision Corrects Typographical Errors in 820701 Submittal + (ML17341B434)
- ML17341B440 + (ML17341B440)
- ML17341B442 + (ML17341B442)
- ML17341B444 + (ML17341B444)
- L-82-456, Forwards Revised Pump & Valve Inservice Test Program for Unit 3,applicable for 821214 to 921214.Revised Inservice Test Program for Unit 4 Will Be Submitted by 830307 + (ML17341B445)
- ML17341B446 + (ML17341B446)