Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17301A026 + (ML17301A026)
- L-83-160, Forwards Suppl a to Independent Verification of Design & Const for St Lucie Unit 2 Nuclear Generating Station, Resolution of Discrepancies & Corrective Action Plans + (ML17301A027)
- ML17301A029 + (ML17301A029)
- L-83-231, Provides Util Position Re Use of Flame Impingement Shields Inside Containment for Protecting Cable Trays.Evaluation Delineates Trays Requiring Protection & Matl to Be Used.Addl Level of Fire Protection to Be Installed Inside Containment + (ML17301A033)
- L-83-248, Application for Amend to License NPF-16 Revising Requirements for Both Primary & Secondary Coolants in Steam Generator Pressure/Temp Limits & Neutron Flux Monitor Surveillance + (ML17301A034)
- ML17301A037 + (ML17301A037)
- ML17301A038 + (ML17301A038)
- ML17301A039 + (ML17301A039)
- ML17301A040 + (ML17301A040)
- ML17301A041 + (ML17301A041)
- L-83-348, Advises That License Conditions for 5% Power Completed. Power Ascension Will Be Commenced Upon Completion of Low Power Physics Testing + (ML17301A042)
- ML17301A043 + (ML17301A043)
- L-83-349, Application to Amend License NPF-16 Revising Tech Spec Requirement for Primary & Secondary Coolants in Steam Generator to Be Greater than 100 F When Coolant Pressure Greater than 200 Psig.Ser Encl + (ML17301A044)
- ML17301A046 + (ML17301A046)
- L-83-399, Forwards Final Response to NRC Re Purge Valve Operability.Revised Purge Valve Rept Addresses Remaining NRC Concerns Re Operability of 48-inch Containment Purge Valves for Facility + (ML17301A047)
- ML17301A049 + (ML17301A049)
- L-83-439, Forwards Response to 830609 & 10 Requests for Addl Info Re NUREG-0737,Items II.F.4,5,6,SAS Computer Scan Rates & Hydrogen Monitoring Sys + (ML17301A051)
- ML17301A052 + (ML17301A052)
- L-83-460, Application to Amend License DPR-67,changing Tech Specs to Modify Peaking Factors Consistent W/Current Methodology & Unit 2 Tech Specs & Deleting Load Follow Power Peaking Penalties.Safety Evaluation Encl + (ML17301A054)
- L-83-483, Forwards Class II Fee for 830825 Application for License Amend Re Peaking Factor & Load Follow Peaking Penalty + (ML17301A057)
- ML17301A058 + (ML17301A058)
- ML17301A062 + (ML17301A062)
- L-83-542, Forwards St Lucie 2 Startup Test Rept, Per Tech Spec 6.9.1.3 + (ML17301A063)
- L-82-105, Semiannual Radioactive Effluent Release Rept,Jul-Dec 1982 + (ML17301A064)
- L-83-566, Forwards Amend 14 to Fsar,Consisting of Info Contained in Responses to OL Review Questions,Updated Fire Protection Program to Reflect Current App R & App a Commitments & Revised P&Ids,General Arrangement & HVAC Flow Diagrams + (ML17301A067)
- L-83-583, Forwards Evaluation of Irradiated Capsule W-97:Reactor Vessel Matls Irradiated Surveillance Program + (ML17301A084)
- L-83-603, Forwards Rev 2 to Fire Hazard Analysis + (ML17301A086)
- ML17301A091 + (ML17301A091)
- ML17301A092 + (ML17301A092)
- ML17301A093 + (ML17301A093)
- ML17301A094 + (ML17301A094)
- ML17301A096 + (ML17301A096)
- ML17301A097 + (ML17301A097)
- L-84-134, Application for Amend to License DPR-67,providing Operability Requirements for RCS Vents,Per Generic Ltr 83-37.License Fee Not Required + (ML17301A102)
- L-84-133, Application for Amend to License NPF-16,revising Tech Specs to Extend Subgroup Test Interval from 6 to 18 Months + (ML17301A106)
- L-84-148, Application for Amend to License NPF-16,revising Tech Specs to Reflect Changes Required to Commence Cycle 2 Operation. Affidavit,Reload Safety Evaluation Summary & Reload Safety Rept Encl.App I to Rept Withheld (Ref 10CFR2.790) + (ML17301A108)
- L-84-162, Forwards Documentation of Resolution of Deficiencies Noted in 830228 SER Re Environ Qualification of safety-related Electrical Equipment,As Discussed W/Nrc During 840508 Meeting.Requests Ssers Be Issued + (ML17301A110)
- L-84-179, Forwards Addl Info Re Inservice Testing Program for Pumps & Valves,Per 840412 Request + (ML17301A111)
- L-84-186, Forwards Rev 2 to Updated FSAR for St Lucie,Unit 1 & List of Plant Changes/Mods + (ML17301A113)
- L-84-219, Forwards Addl Info Re Spent Fuel Rack Submittal & Summary of 840816 Meeting Re Fuel Rack Structural Analysis,In Response to 840713 Request + (ML17301A117)
- ML17301A118 + (ML17301A118)
- L-84-237, Application to Amend License DPR-67,revising Tech Specs to Supply Flow Rates & Tolerances for Each of Two Sodium Hydroxide (Naoh) Sources.Fee Paid.No Significant Hazards Evaluation Encl + (ML17301A121)
- ML17301A122 + (ML17301A122)
- ML17301A124 + (ML17301A124)
- L-84-247, Notifies That Status of Efforts & Future Plans Re Response to NRC Questions on Procedure Generation Package for Emergency Operating Procedures Will Be Provided by 850201 + (ML17301A126)
- ML17301A130 + (ML17301A130)
- L-84-260, Forwards Addl Info Re 800808 Rev 1 to RCS Asymmetric LOCA Loads Evaluation, Per NRC 840531 Request + (ML17301A133)
- ML17301A138 + (ML17301A138)
- L-84-347, Forwards Rev 3 to Fire Hazard Analysis & Requests Formal Disposition of Deviations by First Wk in Jan 1985 to Resolve Items for Feb 1985 Audit + (ML17301A140)
- L-84-372, Rev 0 to Emergency Plan Implementing Procedure 1302, Offsite Emergency Organization Psl Core Damage Assessment + (ML17301A141)
- ML17301A143 + (ML17301A143)