APR 2 6 1983 Docket No. 50-335 Or, Robert F.. Uhrig Vice President Advanced Systems 5 Technology Florida Power 5 Light Company P. 0.
BoX 14000 Juno Beach, Florida 33408 DISTRIBUTION:
~Meet File NRC PDR L
POR NSIC DEisenhut OELD EJordan JTaylor ACRS-10 PNKreutzer-3 RAClark Gray File DSel 1 s RKiessel
- JBlake, Region II
Dear Dr. Uhrig:
5VBJECT:
THERMAL SHIELD RECOVERY PROGRAM This is to acknowledge receipt of your letter of April 19, 1983 (L-83-230) that lists(y number of commitments that have been made relative to the resolution of problems associated with the St. Lucie 1 thermal shield problem.
I espe-cially want to confirm your commitment in Item D.G that calls for NRC oon-currence with Pour conclusions and findings prior to return to power.
Subsequent to the receipt of your letter, a meeting wai held in my office on April 25, 1983 and a schedule for the submittal of reports to meet your commitments was discussed.
We recognize that submittal dates may change as your investigation proceeds; however, the dates reflected below will be used as a basis for Uuggeting staff resources.
The designations used are identigall to those used in your letter:
A.
Reactor Vessel Internals and Inspection Results June 1
B.
Thermal Shield Failure Analysis Septet.ber 15 C.
Recovery Plan Hay 3 D.1 Reactor Vessel Interactions tray 3 D.2 Effects on Fuel Performance tlay 3-D,3 Loose Parts tlonitoring History Hay 20 D.4 Excore Detector Review Hay 20 D.5 Integrity and Stability of Internals July 1
O.G Conclusions and Findings July 2 Responsibility for the review of your submittals and providing HRC concurrence for your conclusions and findings has been transferred from the HRC's Region II Office to the Division of Licensing, Office of Nuclear Reactor Regulation.
If you have any questions, or should changes in the above dates occur, please contact the Project Manager, Oon',.Bells (301) 492-9735.
OFFICEI
$URNAME$
OATE Q
~
pegeooo
~ ~ ~ o ~
8305060039 830426 PDR ADOCK 05000335 I,
/Pn:,'
~
../aM".3.
nggga3 Sincer ely, Grit,"sai si"net by Robert Ao Clark Robert A. Clark, Chief Operating Reactors Branch 03 Division of Licensing
~
~
~ ~ o ~ oo ~ ~ ~ oo ~ o
~ oooooo ~ ~ ~ i NRC FORM 818 OO-80) NRCM 0240 OFFiCiAL RECORD COPY US0 PO: 1981-'038-960
8 po
~
N
Florida Power
& Light Company
~ ~
CC:
Harold F. Reis, Esquire Lowenstein,
- Newman, Reis 8 Alexrad 1025 Connecticut
- Avenue, N.W.
Washington, D. C.
20036 Norman A. Coll, Esquire McCarthy, Steel, Hector 8 Davis 14th Floor, First National Bank Building Miami Florida 33131 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.N.R.C.
7900 S. AIA Jensen Beach, Florida 33457 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtl,and Street, N.E.
Atlanta, Georgia 30308 Mr. Charles B. Brinkman Manager - Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.
7910 Woodmont Avenue
- Bethesda, Maryland 20814 Regional Administrator Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street; Suite 3100 Atlanta, Georgia 30303 State Planning and Devel pment Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol BuilBing Tallahassee, Florida 32301 I
8 nr l
1