Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17285A438 + (ML17285A438)
- ML17285A445 + (ML17285A445)
- ML17285A447 + (ML17285A447)
- GO2-89-074, Radiological Environ Monitoring Program 1988 Annual Rept for Nuclear Plant 2 + (ML17285A448)
- ML17285A449 + (ML17285A449)
- 05000397/LER-1988-030-01, Forwards LER 88-030-01.Rept Submitted Per Commitment in Response to Violation B Noted in Insp Rept 50-397/88-24 + (ML17285A453)
- ML17285A455 + (ML17285A455)
- ML17285A457 + (ML17285A457)
- ML17285A459 + (ML17285A459)
- ML17285A460 + (ML17285A460)
- ML17285A461 + (ML17285A461)
- ML17285A462 + (ML17285A462)
- ML17285A463 + (ML17285A463)
- ML17285A465 + (ML17285A465)
- ML17285A466 + (ML17285A466)
- ML17285A467 + (ML17285A467)
- ML17285A468 + (ML17285A468)
- ML17285A470 + (ML17285A470)
- GO2-89-087, Suppls Response to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:All Associated Master Data Sheets Revised + (ML17285A471)
- ML17285A472 + (ML17285A472)
- ML17285A474 + (ML17285A474)
- GO2-89-095, Part 21 Rept Re Defects in Target Rock Actuator Kits (Part 300562-1).Initially Reported on 890516.Defects Noted in Cold Solder Condition,Insufficient Solder Joints & Failed Solder Joints.Defective Kits Returned to Mfg for Repair + (ML17285A477)
- GO2-89-089, Forwards Update of Status Sheets Used to Track Items/Issues Identified During Mar & Apr 1989 NRC SSOMI at Plant.Items Include 125-volt Dc Battery Life Calculations & Change from Automatic to Manual Intake Valve Operation in Control Room + (ML17285A478)
- ML17285A479 + (ML17285A479)
- ML17285A480 + (ML17285A480)
- ML17285A482 + (ML17285A482)
- ML17285A483 + (ML17285A483)
- 05000397/LER-1989-008, :on 890419,discovered That on 881202,Tech Spec Amend Request Submitted to NRC Describing Diesel Generator Trip Bypass Verification That Had Not Been Performed W/Ler Not Issued within 30 Days After Determination + (ML17285A485)
- GO2-89-092, Forwards Info Re Implementation of Improvement Programs in Each of Functional Areas Reviewed by NRC in 1988 SALP Rept & Summary of Accomplishments & Status of All Commitments from Util 880917 Response to Subj Rept,Per 890105 Meeting + (ML17285A486)
- GO2-89-096, Requests Addl 30 Days for Responding to Generic Ltr 89-06. Response Would Be Due to NRC by 890810.Ltr Not Received Until 890512 + (ML17285A487)
- GO2-89-081, Forwards Status Rept for Apr 1989 in Response to Generic Ltr 88-14 Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. W/Six Oversize Drawings + (ML17285A488)
- ML17285A492 + (ML17285A492)
- 05000397/LER-1989-014, :on 890509,full Reactor Protection Sys Actuation Occurred.Caused by Accidental Movement of Local Power Range Monitor Cables.Scram Reset & Importance of Tying Cables Away from Working Area Stressed + (ML17285A496)
- GO2-89-097, Advises That No Tech Spec Change to Table 3.12-1 Re Location of Direct Radiation Station Necessary Per Review of Amend 6 to Offsite Dose Calculation Manual + (ML17285A497)
- GO2-89-098, Requests That 21 Addl Days Be Granted for Response to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thining, Due to Util Not Receiving Ltr Until 890523 + (ML17285A498)
- GO2-89-104, Part 21 Rept Re Defect Discovered in Valve Motor Operator of RCIC Inboard Containment Isolation Valve RCIC-V-63.Upper Housing Cover Will Be Machined to Remove Excess Matl to Provide Required Recess + (ML17285A500)
- GO2-89-102, Suppls 890303 & 0420 Applications for Amend to Tech Specs Re Reload Requirements for (Cycle 5).Figures 3.2.1-6,3.2.3-1, 3.2.4-2 & 3.2.4-3 Encl + (ML17285A503)
- ML17285A504 + (ML17285A504)
- GO2-89-103, Forwards Addl Info Re Insp Rept 50-397/86-12 Concerning Equipment Qualification of Limitorque Motor Operators Toward Resolution of Remaining Open Item on Subj Audit.Grease Relief Valve Test Data & T-drain Technical Analysis Encl + (ML17285A507)
- ML17285A508 + (ML17285A508)
- IR 05000397/1989012 + (ML17285A510)
- GO2-89-101, Forwards Supplemental Info to 890331 Application for Amend to License NPF-21,revising Tech Specs 3/4.2.6, Power Flow Instability & 3/4.2.7, Neutron Flux Noise Monitoring, Per 890515 & 22 Telcons W/Nrc + (ML17285A513)
- ML17285A514 + (ML17285A514)
- GNRO-2017/00068, Response to Official Requests for Additional Information (RAI) for RR GG-ISI-020 to Use BWRVIP Guidelines + (ML17285A516)
- ML17285A517 + (ML17285A517)
- ML17285A521 + (ML17285A521)
- ML17285A523 + (ML17285A523)
- 05000397/LER-1989-012, :on 890505,unplanned Reactor Scram Occurred During Performance of Reactor Protection Sys Logic Sys Functional Test.Caused by Procedural Inadequacy.Procedure Will Be Revised to Provide Specific Resetting + (ML17285A528)
- 05000397/LER-1989-013, :on 890508,preliminary Calculations Indicated Potential Common Mode Failure of Redundant 120-volt safety- Related Devices.Caused by Less than Adequate Design Criteria to Limit Voltage Drops.Procedure Revised + (ML17285A539)
- ML17285A541 + (ML17285A541)
- 05000397/LER-1989-015, :on 890512,three-quarter-inch High Point Vent Line Failed During Performance of HPCS Sys Operability Procedure.Caused by Reverse Bending Fatigue Caused by Vibration.Design Change Implemented + (ML17285A542)