ML17285A445
| ML17285A445 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/25/1989 |
| From: | Samworth R Office of Nuclear Reactor Regulation |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17285A446 | List: |
| References | |
| GL-83-28, TAC-54040, NUDOCS 8905050211 | |
| Download: ML17285A445 (4) | |
Text
April 25, 1989 0
Docket No. 50-397 Nr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Nr. Sorensen:
SUBJECT:
CLOSEOUT OF GENERIC LETTER 83-28 ITEM 4.5.2 (TAC NO. 54040)
In July, 1983 NRC issued Generic Letter 83-28 identifying certain safety issues and requesting information from licensees to support evaluation of these issues.
WPPSS responded on November 18, 1983.
Item 4.5.2 required WPPSS to confirm that this plant is designed to permit periodic on-line testing of the Reactor Trip System and, if not, to justify not making modifications to permit such testing.
Your response states that the plant is designed to permit the required periodic on-line testing of the Reactor Trip System.
You further state that this testing does not include on-line testing of the backup scram valves but states that the operability of these valves is verified by testing at cold shutdown.
In a telephone conference call on April 4, 1989 WNP-2 staff confirmed that the operability of ea'ch of these valves is verified at 18 month intervals.
Our review of this information finds it acceptable for resolving Item 4.5.2 as documented in the enclosed safety evaluation report.
Qe therefore consider this item closed.
Sincerely, original signed by cc:
See next page Robert B. Samworth, Ploject Directorate Division of Reactor IV, V and Special Senior Project Manager Projects - III Projects DISTRIBUTION NRC
& Local PDRs PD 85 Reading NVirgilio JLee A/e on Licensing Assistant Project Manager OGC (for information only)
E. Jordan B. Grimes ACRS (10)
SNewberry DLasher BNozafari SP/PD5 DR D5 RSamworth GY on 04/g f/89 04/p5/89 890505o 0~0003P7 11 890425.
PDR ADOCK P
po
, >>r,
- 1) ~ t p
Ilf
("',;, ) "; fl.j l r l
I X,)f 11
) fl O'I yt I
C,k
)K'
- hlj, p
h r'kf
'(
C g)gl 1 p)'ill h
KC" KK
"'p
~ t h
I 41 k
VP l<<1 4
I P
1 H
f<<lf IK li II p
Ifr 1" I, l
K i I K
I
~ 4 Jl i P
~ Kt lf Krt C'" '<<h
)fr
)K'"f k>>
K I-I
,lt Hl 1
I i
V 1
J" II"'1, P
1
~ Irr ip Cff ll
)
r
~
p h
~
H ~ r i )f
~
~ l gCK r ~C)>>,
l K l
~
II>>II>>
1 r I 4" 4>>(
~
"p K
H H
I If ll '1 r
'k 4 '
l~
~K>> i>>
"'p<< ~
,)r tr"
")A h k,l
'J f
KK k
I
','K fh l r K
l".
4)1 Itpr KK '
k If 4
II r I rr I>>
I'4k I
1
, Ir, LV>$
l
)II k k 1
1.'I 1 1,'\\
1 II
'K, tf p
I JI
+Ctg Iv K
l >>I Kr,p
)
Ktt,rt I
k pl l
,. r ~ c I
rip f K) r pr ll I ~
l f
'1 lt ~
f
'I
>> ~
1 Hh K
~ r 1
>>1
~
) ~tl' II ~
)Hi>>
k" I
., I
~
')
I
~
11 tp K.
K k
$ )'+
(>>rt lI nv) )kfl I, )I HIll I
~
C p
~
1 r 4 I
~ps REOp, fp
~
p
,g
~+i p
0p**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Apri 1 25, 1989 Docket No. 50-397 Nr.
G.
C. Sorensen, Yianager Regulatory Programs WashingtoII Public Power Supply System P.O.
Box 968 3000 George Washinoton Way Richland, Washington 99352
Dear t1r. Sorensen:
SUBJECT:
CLOSEOUT OF GENERIC'LETTER 83-28 ITEN 4.5;2 (TAC NO. 54040)
In July, 1983 NRC issued Generic Letter 83-28 identifying certain safety issues and requesting informatiotI from licensees to support evaluation of The e issues.
WPPSS responded on November 18, 1983.
Item 4.5.2 required WPPSS to confirm that this plant is designed to permit periodic on-line testing of the ReactoI Trip System and, if not, to justify not making modifications to permit. such testing.
Your response states that the plant is designed to permit the required periodic on-line testing of the Reactor Trip System.
You further state that this testing does not include on-line testing of the backup scram valves but states thar, the operability of these valves is verifieo by testing at cold shutdown.
In a telephone conference call or April 4, 1989 WNP-2 staff confirmed that ihe operability of each of these va Ives is verified at 18 month inter va 1 s.
Our review of this inforIIIation finds it acceptable for resolving Item 4.5.2 as documented in the enclosed safety evaluation report.
)le therefore consider this item closed.
Sincerely, cc:
See next page Robert B. Saoworth, Senior Project Hanager Project Directorate V
Division of Reactor Projects - III IV, V and Special Projects
Hr. G.
C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell E Reynolds 1400 L Street NW Washington, D.C.
20005-3502 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washington 99532 Hr. Curtis Eschels, Chairman Energy Facility Site Evalua*tion Council Hail Stop PY-ll Olympia, Washington 98504 Yir. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, HD 956B
- Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.
Box 968, HD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, HD 280 Richland, Washington 99352 Mr. C. H. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box HD 927M Richland, Washington 99352 Regional Administrator, Region Y
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners
- Prosser, Washington 99350 Hr. Christian Bosted..
U. S. Nuclear Regulatory Commission P. 0.
Box 69 Richland, Washington 99352