Forwards Safety Evaluation Granting Request for Relief ISI-2-008 from ASME XI (IWA-5244),requiring Test to Determine Change in Flow Between Ends of Nonisolable Buried Piping
ML17285A472
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/16/1989
From: Knighton G
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17285A473 List:
References
TAC-69299, NUDOCS 8905240223
Download: ML17285A472 (7)


Text

Hr.'erald C. Sorensen, Hanager Regulatory Programs Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352 Nay 15, 1989 ~

Dear Hr. Sorensen:

SUBJECT:

,REQUEST FOR RELIEF NO. ISI-2-008 FROM ASHE XI (IWA-5244)

TAC.

NO. 69299 By letter dated August 30, 1988 the Washington Public Power Supply System submitted request for relief No. ISI-2-008.

ASHE Section XI (IWA-5244) requires a test to determine the change in flow between ends of non-isolable buried piping.

Relief from this requirement was requested for the buried portions of SW Loop A Supply 20 "SW (1)-2 and SW Loop B Supply 20 " (2)-2.

The basis for the request was the impracticality of the test for the specified pipe segments.

We have evaluated your request and we conclude from our evaluation that the provision of paragraph IWA-5244 is impractical to conduct at WNP-2.

Alternatively, you have proposed that the flow into the Service Water System will be determined quarterly from the pump discharge.

At the same time, a walkdown of the buried piping will be made in search of leakage.

In addition, during reactor operation, the return lines to the heat sink will be monitored pursuant to paragraph IW-5244 (c).

ll Based.on our review, we have determined that, pursuant to 10 CFR 50.55a(g)(6)(i), granting relief where the Code requirements are impractical is authorized by law and will not endanger life or property, or the common defense and security.

We have also, determined that granting relief is otherwise in the public interest considering the burden that could resu1t if the requirements were imposed on the facility.

On this basis, relief from the ASHE code requirement is granted.

Our 'Safety Evaluation is attached.

Sincer ely,

/s/

George W. Knighton, Director Project Directorate V

Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION-..

,NRC 5-Local PDRs PD 85 Reading l1Virgilio JLee RSamworth OGC (f/info only)

EJordan BGrimes S

PD5 LShao JRichardson

BBrown, INEL GJohnson FLitton, EHTB/DEST 8905240223 89051<~

PDR ADOCK 05000397 P

PDC F<l

/89 DRSP/PD5 RSamworth:rw 3/4P/89

/89 DR D5 i t

/i~/89

MEE 1

MM Ill

(,

W '

t ' ~ t ~ <<

W)

~

"I P r)>>t f'h

('<<'"M ('

. <<I-<<

~ ~

4 E'

tl I ), 4 (

f

)

~

Ir, ~ << /

~

r 't<<

4>>

(

~

'<>>>" th ~

M

'l)MI,

(.

W M,t II W,>><<E')

M)

W W

P II>> WN

(

4

'M )('(" "'<<'

NW)ff M)h'(f',

I(

f,',<<$ 4 ftl~

t I(I)

f 'tg (M

)

t M (

M

) (.M h;,

h

)

)

If

$ <<'MM f, ) h P ('

M M gt W

4 M

M

<<.(<<,h

)

I)

<<.If I

IWMM 4, f

"<<>>h W

Ihrf)<<ll(), (IM>>

f,'

)M 'fhlf (IMIM

(

I,

'll<<'EM r "'

)Il'I J)

W"-

WW, tl

$ l W'N)*

If W

r<<W f I>>

)PM )g I

(4>>

f g f I

h

~ )

(4 I; )M'I I,M 4

I h)4 f)rl M

4*

W M

l>>

W

~

I J M

f (PM 'I

~ M it t

4,

I, h

EMt

] Wk't I

)

kh ~ >>'l <<g IM fr(

)

-(I I

It

~ 4

'(

)tt<<W I'

(Eg

'4 I

tf

~

<<I 4 I h

-I

<< I>>

I II

'Eht 4

<< I )

P W

I) it c

<<M P I

W I

~

~

I I 4 I

fr MP PM)M>>

I

>>I>>

f

<<P'll

<<I I

<<4 P"""

MI h)

I II ~ I ~

<<W)fir ~

~ ME M

W 4

W I

'>>r

) Ef (M,

lf'I

<<MM

(

f,)l h

=>>l fl <<V ~

II M'

')

)'('l It IIIII t'

h

)II W)

E<<rt h f

)W h

t t

f<<

M'

)<<

(

W

(

rr

~

'l <<h M

M

>> )

t, 4

),<<(',

4

'l <<>>.I E<<$

4 rt M

4 h "4 ~ 4 4

~

I t

tr f

tl

~

(4 P f '4 M Mr M)'

~ ')

M' 6

PM)

Hr. Gerald C. Sorensen, Hanager Regulatory Programs Mashington Public Power Supply System P. 0.

Box 968 3000 George Washington May Richland, Washington 99352 Nay 15, 1989

Dear Hr. Sorensen:

SUBJECT:

REQUEST FOR RELIEF NO. ISI<<2<<008 FROH ASHE XI (IMA-5244)

TAC. NO. 69299 By letter dated August 30, 1988 the Washington Public Power Supply System submitted request for relief No. ISI-2-008.

ASHE Section XI (IMA-5244) requires a test to determine the change in flow between ends of non-isolable buried piping.

Relief from this requirement was requested for the buried portions of SW Loop A Supply 20 "SW (1)-2 and SM Loop B Supply 20 " (2)-2.

The basis for the request was the impracticality of the test for the specified pipe segments.

Me have evaluated your request and we conclude from our evaluation that the provision of paragraph IWA-5244 is impractical'to conduct at WNP-2.'lternative1y, you have proposed that the flow into the Service Water System will be determined quarterly from the pump discharge.

At the same time, a walkdown of the buried piping will be made in search of leakage.

In addition, during reactor operation, the return lines to the heat sink wi 11 be monitored pursuant to paragraph IW-5244 (c).

Based on our review, we have determined that, pursuant to 10 CFR 50.55a(g)(6)(i), granting relief where the Code requirements are impractical is authorized by law and will not endanger life or property, or the common defense and security.

We have also determined that granting relief is otherwise in the public interest considering the burden that could result if the requirements were imposed on the facility.

On this basis, relief from the ASHE code requirement is granted.

Our Safety Evaluation is attached.

Sincere ly,

/s/

George W. Knighton, Director Project Directorate V

Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION NRC 5 Local PDRs PD 85 Reading HVirgilio JLee RSamworth OGC (f/info only)

EJordan BGrimes LShao JRichardson BBrown, INEL GJohnson FLitton, EHTB/DEST S

PD5

/89 DRSP/PD5 RSamworth:rw 3/4P/89 0

89 DR D5 t

//4/89

~p,ii REOII Vp

~

O~

Cy

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 16, 1989 Mr. Gerald C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352

Dear Mr. Sorensen:

SUBJECT:

RE(UEST FOR RELIEF NO. ISI-2-.008 FROM ASME XI (IWA-5244)

TAC NO '9299 By letter dated August 30, 1988 the Washington Public Power Supply System submitted request for relief No. ISI-2-008.

ASME Section XI (IWA-5244) requires a test to determine the change in flow between ends of non-isolable buried piping.

Relief from this requirement was requested for the buried portions of SW Loop A Supply 20 "SW (l)-2 and SW Loop B Supply 20 " (2)-2.

The basis for the request was the impracticality of the test for the specified pipe segments in accordance with 10 CFR 90.99a(g)5(iii).

We have evaluated your request and we conclude from our evaluation that the provision of paragraph IWA-5244 is impractical to conduct at WNP-2.

Alternatively, you have proposed that the flow into the Service Hater System will be determined quarterly from the pump discharge.

At the same time, a walkdown of the buried piping will be made in search of leakage.

In addition, during reactor operation, the return liIIes to the heat sink will be monitored pursuant, to paragraph IW-5244 (c).

Based on our review, we have determined that, pursuant to 10 CFR 50.55a(g)(6)(i), granting relief where the Code requirements are impractical is authorized by law arid will not endanger life or property, or the common defense and security.

We have also determined that granting relief is otherwise in the public interest considering the burden that could result if the requirements were imposed on the facility.

On this basis, relief from the ASME code requirement is granted.

Our Safety Evaluation is attached.

Sincerely, George

. Knighto, Director Project Directorate Y

Division of Reactor Projects III, IV, Y arid Special Projects Office of Nuclear Reactor Regulation cc:

See next page

Hr. G. C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Nicholas S. Reynolds,

Esq, Bishop, Cook, Purcell 5 Reynolds 1400 L Street NW Washington, D.C.

20005-3502 Hr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman

. Energy Facility 'Site Evaluation Council Hail Stop PY-ll Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, HD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, MD 1023

Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and 'Assurance Washington Public Power Supply System P. 0.

Box 968, HD 280

Richlana, Washington 99352 Mr. C.

M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box HD 927M Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners

Prosser, Washington 99350 Mr. Christian Bosted

'U. S.'uclear Regulatory Commission P. 0.

Box 69 Richland, Washington 99352

Mr. G.

C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No. 2 (WNP-2)

CC'Nicholas S. Reynolds, Esq.

Bishop, Cook, Purcell I% Reynolds 1400 L Street NW Washington, D.C.

20005-3502 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility'Site Evaluation'Counc'i 1

Mail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, MD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assur ance Washington Public Power Supply System P. 0.

Box 968, MD 280 Richland, Washington 99352 Mr. C.

M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box MD 927M Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners

Prosser, Washington 99350 Mr. Christian Bosted

'. S. Nuclear Regulatory Commission P. 0.

Box 69 Richland,'Washington 99352