Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277B402 + (ML17277B402)
- ML17277B404 + (ML17277B404)
- ML17277B410 + (ML17277B410)
- ML17277B416 + (ML17277B416)
- GO2-84-300, Forwards Addl Data Re Results of Operability Testing Performed on Purge & Vent Valves.Package Should Replace Data in Attachment H of 831219 Submittal + (ML17277B417)
- GO2-84-338, Reactor Containment Bldg Integrated Leak Rate Test. W/ + (ML17277B420)
- ML17277B421 + (ML17277B421)
- GO2-84-364, Responds to Generic Ltr 84-11 Re Cracks in BWR Stainless Steel Piping.Response Addresses Scope & Schedule of Planned Insp,Qualifications of Examiners,Description of Surveillance Methods & Measures Taken When Cracks Discovered + (ML17277B422)
- GO2-84-363, Retracts 840309 Request for Amend to License NPF-21,changing Tech Specs to Delete Requirement to Verify Isolation & Annunciation on High Voltage Abnormally Low During Quarterly Channel Function Surveillance Test + (ML17277B423)
- GO2-84-376, Requests Temporary Exemption from 30-minute Rated Supply Requirement of 10CFR50,App R.App R Requires Rated Operating Air Supply of at Least 30 Minutes for self-contained Breathing Apparatus for Use by Fire Brigade + (ML17277B424)
- GO2-84-369, Advises That Operable Redundant Seismic Category I Environmentally Qualified Water Chillers for Control Room HVAC Installed,Satisfying License Condition + (ML17277B426)
- GO2-84-413, Forwards Info Re Effluent Radiation Monitors Per Licensing Condition 2.C.(27).Licensing Condition 2.C.(27) Satisfied + (ML17277B429)
- GO2-84-414, Informs That Items Listed in Attachment 1 of License Condition 2.C(1) of License NPF-21,Amend 1 Completed + (ML17277B430)
- GO2-84-409, Forwards Amend 34 to Fsar.Amend Updates Technical & Equipment Qualifications,Incorporates Preoperational Test Results,Failure Analyses & Safe Shutdown Analyses Previously Reported & Incorporates Tech Specs Values for Startup Test + (ML17277B439)
- ML17277B448 + (ML17277B448)
- ML17277B450 + (ML17277B450)
- ML17277B452 + (ML17277B452)
- GO2-84-429, Notifies That Preoperational Test 22.0-B of Nitrogen Inerting Sys Completed.Results Reviewed & Accepted by Plant Operations Committee + (ML17277B457)
- GO2-84-427, Discusses Replacement of Vinyl Asbestos Tiled Floor W/Carpeting to Enhance Control Room Condition & Improve Human Performance.Proposed Carpeting Meets or Exceeds Critical Radiant Flux Rating,Per ASTM E-648 Test + (ML17277B458)
- GO2-84-444, Forwards Fee for Review of Util 840717 Application Re Enhancement of Control Room Floor + (ML17277B464)
- GO2-84-445, Requests Confirmation of CRGR Review Re Specific Uncertainties Conservatively Treated in GE Instrument Setpoint Methodology for Bwrs.Concern Should Be Treated as Generic + (ML17277B465)
- ML17277B466 + (ML17277B466)
- ML17277B468 + (ML17277B468)
- ML17277B470 + (ML17277B470)
- ML17277B471 + (ML17277B471)
- ML17277B472 + (ML17277B472)
- GO2-84-456, Application to Amend License NPF-21,revising Condition 2.C(11) Re Shield Wall Deferral.Change Would Allow Ongoing ALARA Reviews to Identify Need for Addl Shielding + (ML17277B474)
- GO2-84-472, Concurs W/Clarification Re Piping Failures Outside Primary Containment,Allowing Credit for Offsite Power to Mitigate Consequences of Pipe Failure Causing Scram or Turbine Trip. Offsite Power Assumed Lost When Undervoltage Occurs + (ML17277B475)
- ML17277B477 + (ML17277B477)
- ML17277B480 + (ML17277B480)
- GO2-84-465, Semiannual Effluent Rept,Jan-June 1984 + (ML17277B481)
- ML17277B482 + (ML17277B482)
- GO2-84-398, Provides Addl Info in Support of 831215 Request for Amend to License NPF-21,extending Special Test Exception 3/4.10.5, Oxygen Concentration, for Remainder of Power Ascension Test Program + (ML17277B485)
- ML17277B487 + (ML17277B487)
- ML17277B488 + (ML17277B488)
- GO2-84-495, Advises of Recent Development Re Fire Protection Analysis & Methods of Maintaining Approved Fire Protection Program. Preliminary Review Identified Areas Where Documentation of Assumptions & Bases Incomplete + (ML17277B490)
- GO2-84-497, Submits Supplemental Info Re Request for Amend to License Condition 2.C(11) Re Shield Wall Deferral.Deferral of Walls & Window Will Not Involve Significant Increase in Probability of Previously Evaluated Accident + (ML17277B494)
- GO2-84-498, Provides Clarification of Planned Surveillance Concerning Amend 3 to License NPF-21,permitting Suspension of Provisions of Tech Spec 3.6.6.2 Re Drywell & Suppression Chamber Oxygen Concentration + (ML17277B495)
- GO2-84-512, Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment + (ML17277B496)
- GO2-84-467, Requests Approval to Apply ASME Section III Code Case N-341 to ASME Section XI Certification activities.Five-yr Certification Provision Incorporated Into Section XI 1983 Edition But Not Yet Approved + (ML17277B497)
- IR 05000397/1984015 + (ML17277B500)
- GO2-84-521, Informs That All Plant Personnel Directed to Verify Accuracy of Statements.Compliance Engineer Will Establish Followup Action Tracking Process for Uncompleted Commitments Re Notice of Violation Responses,Per Insp Rept 50-397/84-15 + (ML17277B500)
- ML17277B502 + (ML17277B502)
- GO2-84-525, Advises That Three Public Util Districts Withdrew from Supply Sys.Districts Cited Concerns Re Renewing or Obtaining Liability Insurance for Officers & Directors in Supply Sys Related Lawsuits + (ML17277B504)
- GO2-84-524, Responds to 840702 Generic Ltr 84-15 Re Diesel Generator Reliability.Facility Meets or Exceeds Commission Intent for Diesel Generator Increased Reliability Program.Fast Cold Starting Not Applicable + (ML17277B505)
- ML17277B507 + (ML17277B507)
- GO2-84-534, Forwards Addl Info Re Safety Parameter Display Sys,In Response to NRC 840810 Request Re Suppl 1 to NUREG-0737 + (ML17277B509)
- GO2-84-515, Submits Understanding Re Acceptability to Transfer Sealed Neutron Sources Belonging to Unit 3 to Unit 2 for Storage Under Authority of License NPF-21 + (ML17277B510)
- GO2-84-535, Submits Supplemental Info Re 840815 Request for Amend to Licensing Condition 2.C.(11)concerning Shield Wall Deferral. Workers Will Not Be Required to Enter Areas in Vicinity of Deferred Shielding to Mitigate Action Following LOCA + (ML17277B511)
- GO2-84-542, Confirms Submittal Date of 841219 for Addl Info Re Response to NUREG-0737,Item II.D.1,agreed Upon During 841011 Telcon + (ML17277B517)
- GO2-84-540, Discusses Need for Shift Advisors Following Plant Heatup. Advisors Presently Unnecessary,Based on Industry Working Group 840224 Proposal.Senior Reactor Operators Will Satisfy Criteria of License Condition 15 + (ML17277B518)