Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-82-539, Forwards Response to Request for Addl Info Re Area Vs Magnitude Relationship.Info Prepared by Woodward-Clyde Consultants + (ML17276B514)
- ML17276B518 + (ML17276B518)
- ML17276B521 + (ML17276B521)
- ML17276B523 + (ML17276B523)
- GO2-82-551, Forwards Info Re General Design Criterion 51,including Lowest Svc Metal Temp for Equipment Hatch,Personnel Airlock Assembly,Drywell Head,Flued Heads & Msivs.Encl Info Should Close Out Item 25 of SER (NUREG-0892) + (ML17276B525)
- ML17276B527 + (ML17276B527)
- ML17276B528 + (ML17276B528)
- GO2-82-571, Requests Extension of Time from Fuel Load to End of First Refueling Outage for Completion of Mods to Existing Interior Manual Fire Hose Installation.Response Requested + (ML17276B529)
- GO2-82-541, Forwards Description of Supply Sys Emergency Response Facilities in NUREG-0696 Format, in Response to App D to NUREG-0892 + (ML17276B531)
- ML17276B532 + (ML17276B532)
- ML17276B533 + (ML17276B533)
- ML17276B535 + (ML17276B535)
- ML17276B541 + (ML17276B541)
- GO2-82-608, Summarizes Util Commitments Made at 820520 Meeting W/Mark II Owners Group & NRC Re Resolution of Vacuum Breaker Cycling Issue.Final Resolution to Be Documented in FSAR + (ML17276B548)
- GO2-82-582, Forwards Revised FSAR Section 6.1.2 Re Unqualified Organic Coating on Misellaneous Equipment Inside Drywell + (ML17276B549)
- GO2-82-581, Forwards Info Re Max Average Rate of strike-slip Displacement on RAW & Re-Evaluation of Seismic Velocity Measurements, Per NRC Request + (ML17276B550)
- ML17276B551 + (ML17276B551)
- ML17276B552 + (ML17276B552)
- GO2-82-579, Forwards Amend 25 to FSAR + (ML17276B553)
- GO2-82-622, Responds to NRC Requesting to Be Advised of Schedule for Submitting Program to Address Concerns Re Adequacy of Design Margins of Mark II Containment Sys. Next Rept Will Be Provided within 60 Days of Ltr Receipt + (ML17276B557)
- GO2-82-575, Submits Description of Automatic Depressurization Sys Availability for Facility,In Response to Outstanding Issue 27 of SER,NUREG-0892.Issue Considered Closed + (ML17276B558)
- GO2-82-620, Comments on NRC 820629 Response to Re Tornado Missile Protection for Diesel Generator Exhausts.Backfitting Would Not Justify Cost.Requests Item Be Deleted from SER Open Item List + (ML17276B559)
- GO2-82-623, Forwards Util 820723 Transmittal Ltr & Certificate of Svc for Amend 25 to FSAR + (ML17276B560)
- GO2-82-604, Submits Response to NRC Questions Arising from Review of Draft Sierra Geophysics Rept, Paleomagnetism of Pre-Missoula Gravels from Corehole PM-2 on Southeast Anticline,Hanford Site,Wa + (ML17276B561)
- GO2-82-584, Advises That Updated Schedule Re Pump & Valve Inservice Test Program Will Be Submitted by 820901 + (ML17276B562)
- GO2-82-576, Advises That Util Considering Adapting Trojan Station Emergency Preparedness Plan & Operating Procedures to Establish Volcanic Ashfall Early Warning Sys & Emergency Plan Protection Measures + (ML17276B564)
- GO2-82-583, Documents 820625 Telcon Concerning NRC Approval for Use of ASME Code Case N-316 Re Alternative Rules for Fillet Weld Dimensions for Socket Welded Fittings.Case Rept Encl + (ML17276B565)
- GO2-82-578, Forwards Certificate of Svc for Amend 24 to Fsar.Transmittal Ltr to Benton County Commissioners & Energy Facility Site Evaluation Council Encl + (ML17276B566)
- GO2-82-493, Forwards Rept on Capability of Southeast Anticline NRC Request at 820518-19 Meetings.Rept Should Close Out Open Item in Ser.W/O Encl + (ML17276B567)
- ML17276B569 + (ML17276B569)
- ML17276B572 + (ML17276B572)
- ML17276B574 + (ML17276B574)
- GO2-82-537, Requests Timely Completion of Evaluation of Geology & Seismology Review.Excessively re-evaluated Siting Issues Deplete Resources,Rarely Result in Plant Changes & Cause Licensing Delays + (ML17276B577)
- GO2-82-630, Advises That Findings from Mark III Containment Program to Demonstrate That Use of Square Root of Sum of Squares Rule for Combining Dynamic Responses Acceptable for Facility,Per SER Section 3.9.3.1 + (ML17276B581)
- GO2-82-631, Forwards Response to NUREG-0892,SER Outstanding Issue 8 Re Pressure Interlocks on Emergency Core Cooling Injection Valves.Issue Considered Closed + (ML17276B582)
- GO2-82-638, Confirms 820727 Telcon Re Use of ASME Code Case N-308, Documentation of Repairs & Replacement of Components in Nuclear Power Plants. Util Will Implement Code Case as Written & Approved by NRC + (ML17276B584)
- GO2-82-641, Clarifies Diesel Generator Bldg Air Intake Per Discussion Re Design Basis Dust Storm Effect.Response Closes Out SER Outstanding Concern + (ML17276B585)
- GO2-82-634, Forwards Addl Info on SER Outstanding Issue 10 Re Standby Svc Water Instrumentation & Control Design,In Response to NRC .Issue 10 Considered Closed + (ML17276B586)
- GO2-17-166, Response to Request for Additional Information for Relief Request 3ISI-19 + (ML17276B587)
- GO2-82-682, Forwards Corporate Organizational Changes Effective 820810. Changes Will Be Reflected in Future Revisions to FSAR & Operational QA Program Description + (ML17276B594)
- ML17276B598 + (ML17276B598)
- GO2-82-672, Forwards marked-up FSAR Pages Submitting Addl Info Re Internally Generated Missiles (Outside Containment),Per 820528 Commitment.Info Closes Outstanding SER Issue 2, NUREG-0892 + (ML17276B599)
- ML17276B600 + (ML17276B600)
- ML17276B601 + (ML17276B601)
- ML17276B603 + (ML17276B603)
- ML17276B609 + (ML17276B609)
- ML17276B613 + (ML17276B613)
- ML17276B615 + (ML17276B615)
- ML17276B617 + (ML17276B617)
- ML17276B618 + (ML17276B618)
- ML17276B619 + (ML17276B619)