Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-97-258, Forwards Plan to Address GL 89-10 Close Out Insp follow-up Items W/Specific Commitment Dates for Completion.Draft Responses,W/Exception of Commitment Dates,Reviewed W/ T Scarbrough of NRR & E Girard of Region II + (ML17229A497)
- L-97-264, Special Rept:On 970921,discovered That Several Heated Juction Thermocouple Inputs to Channel B of Rvlm Sys Deviating from Normal Temps.Rvlm Sys Will Be Restored to Operability Before End of Next Unit 2 Refueling Outage + (ML17229A498)
- 05000335/LER-1997-009, :on 970917,inoperable PORV Block Valve Resulted in Operation Prohibited by Tech Specs Occurred.Caused by Plant GL 89-10 Program Plan to Review Plant Manager Action Item Sys.Porv Block Valve V-1403 Restored + (ML17229A499)
- L-97-266, NPDES Noncompliance Notification:On 970912 Samples Were Taken for CBOD5 at Influent & Effluent of St Lucie Unit 1 Sewage Treatment Plant.Value Less than Permitted Minimum Due to Increased Number of Personnel.Resample Taken + (ML17229A500)
- L-97-252, Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2 + (ML17229A501)
- IR 05000335/1997006 + (ML17229A502)
- ML17229A503 + (ML17229A503)
- ML17229A505 + (ML17229A505)
- ML17229A506 + (ML17229A506)
- L-97-267, Forwards Copy of Request for Mod of Fl Wastewater Permit, Formerly NPDES Permit,Submitted to State of Fl on 971017 + (ML17229A507)
- L-97-271, Responds to 971001 RAI Re Proposed License Amend,Providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures + (ML17229A510)
- L-97-274, Forwards Response to Violations Noted in Insp Repts 50-335/97-10 & 50-389/97-10.Corrective Actions:All Sixteen Identified Errors Reviewed & Determined Not to Represent Operability Concerns + (ML17229A511)
- L-97-276, Forwards Rev 0 to PCM 97055, St Lucie Unit 1,Cycle 15 Colr. Refueling Overhaul Activities Currently in Progress & Reactor Operations for Cycle 15 Scheduled to Commence in Jan 1998 + (ML17229A512)
- ML17229A513 + (ML17229A513)
- ML17229A514 + (ML17229A514)
- 05000389/LER-1997-007-02, :on 971008,inoperable Containment Cooling Fan Resulted in Operation of Facility Outside Design Basis. Caused by non-cognitive Personnel Error.Ccs Operation Was Revised & Issued on 971013 + (ML17229A515)
- ML17229A516 + (ML17229A516)
- L-97-277, Provides Initial FP&L Response to GL 97-04, Assurance of Sufficient Net Suction for ECC & Containment Heat Removal Pumps. Licensee Will Provide Requested Info by 980331 + (ML17229A517)
- L-97-282, Forwards Corrected FFD Program Performance Data for Periods 960630,961231 & 970630.Computer Sys Used to Rack Employment Classification of Individuals Tested Grouped Personnel Into Incorrect Categories.New Regulatory Commitments Listed + (ML17229A518)
- L-97-287, Verifies That Containment Structural Integrity & Containment Leakage Rates Are Acceptable by TS SRs 4.6.1.6 & 4.6.1.2, Respectively.Next Periodic ILRT Is Due Before May 2003. Basis of Util Decision Encl,For Info + (ML17229A519)
- ML17229A520 + (ML17229A520)
- ML17229A522 + (ML17229A522)
- ML17229A523 + (ML17229A523)
- ML17229A524 + (ML17229A524)
- ML17229A525 + (ML17229A525)
- ML17229A527 + (ML17229A527)
- L-97-288, Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2 + (ML17229A528)
- ML17229A529 + (ML17229A529)
- ML17229A530 + (ML17229A530)
- ML17229A531 + (ML17229A531)
- ML17229A533 + (ML17229A533)
- ML17229A534 + (ML17229A534)
- L-97-292, Forwards St Lucie Unit 2 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 960106-970525. Submittal Correlates W/Info Included in Rev 11 of UFSAR Submitted Under Separate Cover + (ML17229A535)
- ML17229A536 + (ML17229A536)
- ML17229A537 + (ML17229A537)
- ML17229A538 + (ML17229A538)
- ML17229A542 + (ML17229A542)
- IR 05000335/1997301 + (ML17229A544)
- IR 05000335/1997010 + (ML17229A545)
- IR 05000335/1997001 + (ML17229A546)
- L-97-296, Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement + (ML17229A547)
- ML17229A548 + (ML17229A548)
- ML17229A549 + (ML17229A549)
- 05000389/LER-1997-008-02, :on 971107,inadequate CR Ventilation Surveillance Resulted in Condition Prohibited by Ts.Caused by non-cognitive Personnel Error.Operating Procedure 2-1900050 Was Revised + (ML17229A550)
- L-97-291, Forwards Response to Violations Noted in Insp Repts 50-335/97-11 & 50-389/97-11.Corrective Actions:Individuals Causing Violation Issued Written Warning in Accordance W/St Lucie Plant Policy + (ML17229A551)
- L-97-301, Forwards Response to Request for Addl Info Re Proposed License Amend for UFSAR Evaluation of MSSV Inadvertent Opening + (ML17229A552)
- L-97-312, Requests That NRC Reschedule Pilot Region II Fire Protection Functional Insp to June-Jul 1998 Time Frame,Per Reasons Discussed + (ML17229A553)
- L-97-310, Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2 + (ML17229A554)
- L-97-313, Provides Notification of Error Discovered in Use of Acceptable SBLOCA Evaluation Model,Which Calculates Cooling Performance of Plant Eccs.Rept Submitted Per 10CFR50.46 + (ML17229A555)
- L-97-319, Responds to Violations Noted in Insp Repts 50-335/97-11 & 50-389/97-11.Corrective Actions:Implemented New Set of Maint/Training Policies,Issued Interim Controls Ltr Stating Mgt Expectations & Revised Procedure Adm 08.02 + (ML17229A556)
- ML17229A557 + (ML17229A557)