Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17209A243 + (ML17209A243)
- ML17209A244 + (ML17209A244)
- ML17209A245 + (ML17209A245)
- ML17209A246 + (ML17209A246)
- ML17209A247 + (ML17209A247)
- ML17209A248 + (ML17209A248)
- L-80-342, Requests Amend to App a of License DPR-67 to Correct Error in Tech Spec Section 3/4.9.14 Re Fuel Pool Cask Drop Analysis.Proposed Tech Spec Change Encl + (ML17209A251)
- ML17209A253 + (ML17209A253)
- ML17209A254 + (ML17209A254)
- L-80-343, Forwards Stress Analysis of Drain & Fill Method for Cooling Reactor & Responses to NRC Re Potential Effects of Rapid RCS Depressurization.No Excessive Stress Levels Occurred During Normal Cooldown + (ML17209A255)
- ML17209A256 + (ML17209A256)
- ML17209A261 + (ML17209A261)
- L-80-347, Ack Receipt of NRC Re ATWS Procedure.Formal Emergency Operating Procedure Will Be Prepared After Plant Design Is in Final Form.Vendor Guidelines on ATWS Procedure Encl + (ML17209A262)
- ML17209A265 + (ML17209A265)
- L-80-267, Responds to NRC Re Violations Noted in Health Physics Appraisal Rept 50-335/80-06.Corrective Actions: Plant Breathing Air Supply Was Tested to Ensure That Breathing Air Meets Specs + (ML17209A267)
- ML17209A269 + (ML17209A269)
- ML17209A270 + (ML17209A270)
- IR 05000335/1980006 + (ML17209A271)
- L-80-327, Advises That List of Sys Requested in IE Bulletin 80-11, Masonry Wall Design, Will Be Available by 801020 + (ML17209A272)
- L-80-311, Responds to IE Bulletin 80-18, Maint of Adequate Min Flow Thru Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. Facility Does Not Have Centrifugal Charging Pumps + (ML17209A273)
- L-80-323, Responds to IE Bulletin 80-08, Examination of Containment Liner Penetration Welds, Items 1-3.Backing Bars Are Not Utilized on Butt Welds.All Butt Welds Will Be Radiographed + (ML17209A274)
- ML17209A276 + (ML17209A276)
- ML17209A279 + (ML17209A279)
- L-80-353, Notifies That Installation of Data Display Computer & Equipment for Technical Support Ctr Will Be Completed by 810401.Caused by Procurement Delays + (ML17209A280)
- ML17209A281 + (ML17209A281)
- ML17209A282 + (ML17209A282)
- ML17209A283 + (ML17209A283)
- ML17209A285 + (ML17209A285)
- IR 015000039/1980015 + (ML17209A287)
- ML17209A290 + (ML17209A290)
- L-80-358, Application for Amend to License DPR-67 Consisting of Changes to Tech Specs + (ML17209A292)
- ML17209A293 + (ML17209A293)
- ML17209A294 + (ML17209A294)
- ML17209A297 + (ML17209A297)
- L-80-360, Notifies That 801114 Has Been Scheduled as Revised Due Date for Responding to NRC Re Potential for Transient Total Loss of Ac Power at Operating Reactors + (ML17209A298)
- 05000335/LER-1980-060, Forwards LER 80-060/03L-0 + (ML17209A299)
- ML17209A301 + (ML17209A301)
- ML17209A314 + (ML17209A314)
- L-80-366, Informs of Compiling Info Re Environ Qualification Tests of safety-related Equipment in Response to Request in NRC .Response to Be Provided by 801130 + (ML17209A315)
- ML17209A316 + (ML17209A316)
- IR 05000335/1980024 + (ML17209A318)
- ML17209A319 + (ML17209A319)
- L-80-369, Ack Receipt of NRC Providing Interim Criteria for Shift Staffing.Util Will Be in Compliance W/Criteria by 810601 + (ML17209A320)
- L-80-351, Forwards Comments on Suppl Info to Draft Effluent & Waste Disposal Semiannual Rept for 1978 Encl in + (ML17209A321)
- ML17209A322 + (ML17209A322)
- ML17209A323 + (ML17209A323)
- ML17209A324 + (ML17209A324)
- ML17209A325 + (ML17209A325)
- 05000335/LER-1980-056, Forwards LER 80-056/03L-0 + (ML17209A330)
- L-80-367, Requests Amend to App a of License DPR-67.Forwards Proposed Tech Spec Changes,Per NRC 800702 Request + (ML17209A333)
- ML17209A334 + (ML17209A334)