ML17209A285
| ML17209A285 | |
| Person / Time | |
|---|---|
| Site: | 02700039, Saint Lucie |
| Issue date: | 09/19/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17209A286 | List: |
| References | |
| NUDOCS 8010300168 | |
| Download: ML17209A285 (4) | |
See also: IR 015000039/1980015
Text
~g 4ECI
pe
p,0
0O
/4~
~O
+w*w+
In Reply Refer To:
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
$ PP 1S 3980
50-335/80-26
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FI
33152
Gentlemen:
This refers
to an unannounced
inspection
conducted
by T.
C. MacArthur of this
office on July 27 through August 1,
1980.
A shipment(s)
of radioactive
waste
shipped from your facility was inspected
upon arrival at the Chem-Nuclear Systems,
Inc., Barnwell, South Carolina disposal site.
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of a
review of the shipping papers,
placarding
and labeling requirements,
radiation-
measurements,
selective contamination surveys,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance were disclosed.
, In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold
such
information from public disclosure.
Any such application must
include
a full statement
of the reasons
on the basis of which it is claimed that.
the information is proprietary,
and should be prepared
so that proprietary infor-
mation identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report willbe placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
J.
P i ip S
hr, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
(See
Page 2)
gol0300 168
-2-
SEP l 9 1980
Enclosure:
Inspection Report
No. 15000039/80-15
w/Attachment
cc w/encl:
U.S. Department of Transportation
ATTN:
William L. Barrow
Federal
Highway Administration
1720 Peachtree
Road,
N.W., Suite 200
Atlanta, Georgia
Chem-Nuclear
Systems,
Inc.
ATTN:
Lee Hebbard, Site Manager
P. 0.
Box 726
Barnwell, South Carolina
29812
C.
M. Wethy, Plant Manager
Nat Weems, Assistant
QA Manager
'0