Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16187A293 + (ML16187A293)
- RS-16-130, Inservice Inspection Interval Relief Request 15R-08 + (ML16187A295)
- ML16187A296 + (ML16187A296)
- ML16187A308 + (ML16187A308)
- RS-16-137, Supplemental Information for License Amendment to Technical Specification 3.8.1, AC Sources - Operating + (ML16187A316)
- ML16187A317 + (ML16187A317)
- ML16187A318 + (ML16187A318)
- 05000219/LER-2016-003, Regarding Manual Scram Inserted Due to Leakage from the D Reactor Recirculation Pump Seal + (ML16187A322)
- ML16187A323 + (ML16187A323)
- 05000336/LER-2016-001, Turbine Driven Auxiliary Feedwater Pump Room HELB Door Left Open + (ML16187A324)
- ML16187A325 + (ML16187A325)
- 05000272/LER-2016-001, Regarding Unanalyzed Condition Due to Degraded Reactor Baffle to Former Bolts + (ML16187A330)
- CNL-16-101, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 20 + (ML16187A333)
- LR-N16-0107, Core Operating Limits Report, Cycle 25 + (ML16187A335)
- ML16187A339 + (ML16187A339)
- ML16187A366 + (ML16187A366)
- ML16187A368 + (ML16187A368)
- ML16187A369 + (ML16187A369)
- ML16187A370 + (ML16187A370)
- ML16187A371 + (ML16187A371)
- IR 05000338/2016404 + (ML16187A372)
- ML16187A378 + (ML16187A378)
- ML16187A379 + (ML16187A379)
- 05000364/LER-2016-001, Regarding Manual Reactor Trip Due to High Steam Generator Level + (ML16187A380)
- ML16187A399 + (ML16187A399)
- ML16188A005 + (ML16188A005)
- ML16188A007 + (ML16188A007)
- ML16188A009 + (ML16188A009)
- ML16188A011 + (ML16188A011)
- IR 05000219/2016010 + (ML16188A014)
- ML16188A020 + (ML16188A020)
- ML16188A029 + (ML16188A029)
- ML16188A054 + (ML16188A054)
- ML16188A065 + (ML16188A065)
- ML16188A104 + (ML16188A104)
- RC-16-0089, Submittal of Change of the Completion Date of Implementation Milestone 8 + (ML16188A105)
- ML16188A108 + (ML16188A108)
- ML16188A128 + (ML16188A128)
- ML16188A129 + (ML16188A129)
- ML16188A158 + (ML16188A158)
- JAFP-16-0109, Transmittal of Emergency Plan Updates + (ML16188A162)
- ML16188A163 + (ML16188A163)
- ML16188A164 + (ML16188A164)
- 05000387/LER-2015-010, Regarding Supplemental Report to LER-2015-010-00, Loss of Differential Pressure in Zone II of Secondary Containment + (ML16188A181)
- ML16188A183 + (ML16188A183)
- JAFP-16-0104, James A. Fitzpatrick Nuclear Power Plant Transmittal of Emergency Plan Updates + (ML16188A183)
- ML16188A184 + (ML16188A184)
- JAFP-16-0104, James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 32 + (ML16188A184)
- JAFP-16-0104, Emergency Plan Update, Emergency Plan, Volume 2, Rev. 23 and Volume 3, Rev. 27 + (ML16188A185)
- ML16188A187 + (ML16188A187)
- ML16188A192 + (ML16188A192)